{"schema":"cost-hub-1.0","as_of":"June 2026","bands_dated":{"values":["2026"],"precision":"year","undated_market_ids":["hong-kong","indonesia","northern-virginia","saudi-arabia","south-africa","south-korea","taiwan","thailand","uae"],"note":"Bands are dated to the year in the record. Month-level dates are not recorded yet. as_of is the rating vintage, not a band date."},"currency":"USD","unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","archetype":{"mw":100,"load_factor_pct":95,"gwh":832.2,"hours":8760,"power_factor":0.95,"n1":"N-1 at the supplying substation, transfer within 30 minutes","charges":"energy, capacity, demand, transmission, distribution, loss, ancillary, reactive-power, tax, levy, carbon and commercial-supply charges"},"not_wholesale":"This is the delivered cost for one declared large load, not the wholesale price.","views_total":84,"counts":{"cost_band_markets":32,"by_region":{"europe":11,"us":6,"canada":2,"asia":10,"middle_east":2,"africa":1}},"scale":{"low_usd_per_mwh":35,"high_usd_per_mwh":210,"figures":{"low_usd_per_mwh":{"value":35,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:global:low_usd_per_mwh:2026-06","report_url":null},"high_usd_per_mwh":{"value":210,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:global:high_usd_per_mwh:2026-06","report_url":null}}},"free_and_desk":"Each market's own band, midpoint included, is free on its report. The full ranking with precise midpoints, every dated change and exports is the Analyst Desk.","region":"all","html_url":"https://powergridiq.com/realized-cost","cheapest_in_view":["sweden-north","saudi-arabia","spp"],"markets":[{"id":"ercot-central","name":"ERCOT Central (Houston & DFW)","flag":"🇺🇸","region":"us","region_label":"United States","band_kind":"band","how_built":"triangulated","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":true},"connection_wait":{"level":"Low","detail":"1 to 2 years","basis":"estimate"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/ercot-central#cost","low_usd_per_mwh":55,"high_usd_per_mwh":95,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:ercot-central:tier:2026-06","report_url":"https://powergridiq.com/rating/ercot-central#cost"},"low_usd_per_mwh":{"value":55,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ercot-central:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ercot-central#cost"},"high_usd_per_mwh":{"value":95,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ercot-central:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ercot-central#cost"}}},{"id":"ercot-west","name":"ERCOT West (West Texas & Panhandle)","flag":"🇺🇸","region":"us","region_label":"United States","band_kind":"band","how_built":"triangulated","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":true},"connection_wait":{"level":"Low","detail":"1 to 2 years","basis":"estimate"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/ercot-west#cost","low_usd_per_mwh":42,"high_usd_per_mwh":80,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:ercot-west:tier:2026-06","report_url":"https://powergridiq.com/rating/ercot-west#cost"},"low_usd_per_mwh":{"value":42,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ercot-west:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ercot-west#cost"},"high_usd_per_mwh":{"value":80,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ercot-west:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ercot-west#cost"}}},{"id":"finland","name":"Finland","flag":"🇫🇮","region":"europe","region_label":"Europe","band_kind":"band","how_built":"triangulated","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Low","detail":"1 to 3 years","basis":"estimate"},"tier":1,"tier_name":"Prime","report_url":"https://powergridiq.com/rating/finland#cost","low_usd_per_mwh":42,"high_usd_per_mwh":78,"figures":{"tier":{"value":1,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:finland:tier:2026-06","report_url":"https://powergridiq.com/rating/finland#cost"},"low_usd_per_mwh":{"value":42,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:finland:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/finland#cost"},"high_usd_per_mwh":{"value":78,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:finland:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/finland#cost"}}},{"id":"indonesia","name":"Indonesia","flag":"🇮🇩","region":"asia","region_label":"Asia","band_kind":"band","how_built":"administered","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":null,"total_lines":null,"verified_layer":false},"connection_wait":{"level":"Moderate","detail":"1 to 2 years (Batam)","basis":"estimate"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/indonesia#cost","low_usd_per_mwh":62,"high_usd_per_mwh":90,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:indonesia:tier:2026-06","report_url":"https://powergridiq.com/rating/indonesia#cost"},"low_usd_per_mwh":{"value":62,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:indonesia:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/indonesia#cost"},"high_usd_per_mwh":{"value":90,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:indonesia:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/indonesia#cost"}}},{"id":"miso","name":"MISO (Midwest)","flag":"🇺🇸","region":"us","region_label":"United States","band_kind":"band","how_built":"triangulated","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":0,"total_lines":4,"verified_layer":false},"connection_wait":{"level":"High","detail":"2 to 7 years (modelled from the generation queue)","basis":"modelled"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/miso#cost","low_usd_per_mwh":48,"high_usd_per_mwh":78,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:miso:tier:2026-06","report_url":"https://powergridiq.com/rating/miso#cost"},"low_usd_per_mwh":{"value":48,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:miso:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/miso#cost"},"high_usd_per_mwh":{"value":78,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:miso:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/miso#cost"}}},{"id":"norway","name":"Norway","flag":"🇳🇴","region":"europe","region_label":"Europe","band_kind":"band","how_built":"modelled","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Low","detail":"1 to 3 years","basis":"estimate"},"tier":1,"tier_name":"Prime","report_url":"https://powergridiq.com/rating/norway#cost","low_usd_per_mwh":40,"high_usd_per_mwh":75,"figures":{"tier":{"value":1,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:norway:tier:2026-06","report_url":"https://powergridiq.com/rating/norway#cost"},"low_usd_per_mwh":{"value":40,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:norway:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/norway#cost"},"high_usd_per_mwh":{"value":75,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:norway:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/norway#cost"}}},{"id":"ontario","name":"Ontario","flag":"🇨🇦","region":"canada","region_label":"Canada","band_kind":"band","how_built":"triangulated","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":0,"total_lines":4,"verified_layer":false},"connection_wait":{"level":"High","detail":"3 to 5 years","basis":"estimate"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/ontario#cost","low_usd_per_mwh":55,"high_usd_per_mwh":100,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:ontario:tier:2026-06","report_url":"https://powergridiq.com/rating/ontario#cost"},"low_usd_per_mwh":{"value":55,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ontario:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ontario#cost"},"high_usd_per_mwh":{"value":100,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ontario:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ontario#cost"}}},{"id":"spp","name":"SPP (Southwest Power Pool)","flag":"🇺🇸","region":"us","region_label":"United States","band_kind":"band","how_built":"triangulated","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"High","detail":"2 to 7 years (modelled from the generation queue)","basis":"modelled"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/spp#cost","low_usd_per_mwh":42,"high_usd_per_mwh":68,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:spp:tier:2026-06","report_url":"https://powergridiq.com/rating/spp#cost"},"low_usd_per_mwh":{"value":42,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:spp:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/spp#cost"},"high_usd_per_mwh":{"value":68,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:spp:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/spp#cost"}}},{"id":"saudi-arabia","name":"Saudi Arabia","flag":"🇸🇦","region":"middle_east","region_label":"Middle East","band_kind":"band","how_built":"administered","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":null,"total_lines":null,"verified_layer":false},"connection_wait":{"level":"Low","detail":"1 to 3 years","basis":"estimate"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/saudi-arabia#cost","low_usd_per_mwh":50,"high_usd_per_mwh":58,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:saudi-arabia:tier:2026-06","report_url":"https://powergridiq.com/rating/saudi-arabia#cost"},"low_usd_per_mwh":{"value":50,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:saudi-arabia:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/saudi-arabia#cost"},"high_usd_per_mwh":{"value":58,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:saudi-arabia:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/saudi-arabia#cost"}}},{"id":"sweden-north","name":"Sweden North (Lulea, SE1/SE2)","flag":"🇸🇪","region":"europe","region_label":"Europe","band_kind":"band","how_built":"modelled","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Low","detail":"1 to 3 years","basis":"estimate"},"tier":1,"tier_name":"Prime","report_url":"https://powergridiq.com/rating/sweden-north#cost","low_usd_per_mwh":35,"high_usd_per_mwh":65,"figures":{"tier":{"value":1,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:sweden-north:tier:2026-06","report_url":"https://powergridiq.com/rating/sweden-north#cost"},"low_usd_per_mwh":{"value":35,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:sweden-north:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/sweden-north#cost"},"high_usd_per_mwh":{"value":65,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:sweden-north:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/sweden-north#cost"}}},{"id":"uae","name":"United Arab Emirates","flag":"🇦🇪","region":"middle_east","region_label":"Middle East","band_kind":"band","how_built":"modelled","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":null,"total_lines":null,"verified_layer":false},"connection_wait":{"level":"Low","detail":"1 to 3 years","basis":"estimate"},"tier":1,"tier_name":"Prime","report_url":"https://powergridiq.com/rating/uae#cost","low_usd_per_mwh":50,"high_usd_per_mwh":85,"figures":{"tier":{"value":1,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:uae:tier:2026-06","report_url":"https://powergridiq.com/rating/uae#cost"},"low_usd_per_mwh":{"value":50,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:uae:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/uae#cost"},"high_usd_per_mwh":{"value":85,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:uae:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/uae#cost"}}},{"id":"alberta","name":"Alberta","flag":"🇨🇦","region":"canada","region_label":"Canada","band_kind":"band","how_built":"triangulated","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Severe","detail":"5 to 8 years (queue capped)","basis":"measured"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/alberta#cost","low_usd_per_mwh":60,"high_usd_per_mwh":110,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:alberta:tier:2026-06","report_url":"https://powergridiq.com/rating/alberta#cost"},"low_usd_per_mwh":{"value":60,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:alberta:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/alberta#cost"},"high_usd_per_mwh":{"value":110,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:alberta:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/alberta#cost"}}},{"id":"france","name":"France","flag":"🇫🇷","region":"europe","region_label":"Europe","band_kind":"band","how_built":"triangulated","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Moderate","detail":"3 to 4 years (fast track)","basis":"measured"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/france#cost","low_usd_per_mwh":88,"high_usd_per_mwh":122,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:france:tier:2026-06","report_url":"https://powergridiq.com/rating/france#cost"},"low_usd_per_mwh":{"value":88,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:france:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/france#cost"},"high_usd_per_mwh":{"value":122,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:france:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/france#cost"}}},{"id":"germany-north","name":"Germany North (Hamburg)","flag":"🇩🇪","region":"europe","region_label":"Europe","band_kind":"band","how_built":"triangulated","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"High","detail":"5 to 8 years","basis":"estimate"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/germany-north#cost","low_usd_per_mwh":100,"high_usd_per_mwh":145,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:germany-north:tier:2026-06","report_url":"https://powergridiq.com/rating/germany-north#cost"},"low_usd_per_mwh":{"value":100,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:germany-north:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/germany-north#cost"},"high_usd_per_mwh":{"value":145,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:germany-north:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/germany-north#cost"}}},{"id":"india","name":"India","flag":"🇮🇳","region":"asia","region_label":"Asia","band_kind":"band","how_built":"modelled","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Moderate","detail":"2 to 4 years","basis":"estimate"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/india#cost","low_usd_per_mwh":75,"high_usd_per_mwh":125,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:india:tier:2026-06","report_url":"https://powergridiq.com/rating/india#cost"},"low_usd_per_mwh":{"value":75,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:india:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/india#cost"},"high_usd_per_mwh":{"value":125,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:india:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/india#cost"}}},{"id":"malaysia","name":"Malaysia","flag":"🇲🇾","region":"asia","region_label":"Asia","band_kind":"band","how_built":"triangulated","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":0,"total_lines":4,"verified_layer":false},"connection_wait":{"level":"Moderate","detail":"1 to 3 years (Green Lane)","basis":"estimate"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/malaysia#cost","low_usd_per_mwh":90,"high_usd_per_mwh":115,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:malaysia:tier:2026-06","report_url":"https://powergridiq.com/rating/malaysia#cost"},"low_usd_per_mwh":{"value":90,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:malaysia:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/malaysia#cost"},"high_usd_per_mwh":{"value":115,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:malaysia:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/malaysia#cost"}}},{"id":"nyiso","name":"NYISO (New York)","flag":"🇺🇸","region":"us","region_label":"United States","band_kind":"band","how_built":"triangulated","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":0,"total_lines":4,"verified_layer":false},"connection_wait":{"level":"High","detail":"3 to 7 years (modelled from the generation queue)","basis":"modelled"},"tier":4,"tier_name":"Constrained","report_url":"https://powergridiq.com/rating/nyiso#cost","low_usd_per_mwh":70,"high_usd_per_mwh":140,"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:nyiso:tier:2026-06","report_url":"https://powergridiq.com/rating/nyiso#cost"},"low_usd_per_mwh":{"value":70,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:nyiso:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/nyiso#cost"},"high_usd_per_mwh":{"value":140,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:nyiso:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/nyiso#cost"}}},{"id":"northern-virginia","name":"Northern Virginia (PJM)","flag":"🇺🇸","region":"us","region_label":"United States","band_kind":"point","how_built":"administered","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":100,"total_lines":4,"verified_layer":false},"connection_wait":{"level":"Severe","detail":"3 to 9 years (modelled from the generation queue)","basis":"modelled"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/northern-virginia#cost","point_note":"a point from the posted tariff","mid_usd_per_mwh":82.63,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:northern-virginia:tier:2026-06","report_url":"https://powergridiq.com/rating/northern-virginia#cost"},"mid_usd_per_mwh":{"value":82.63,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:northern-virginia:mid_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/northern-virginia#cost"}}},{"id":"south-africa","name":"South Africa","flag":"🇿🇦","region":"africa","region_label":"Africa","band_kind":"band","how_built":"administered","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":null,"total_lines":null,"verified_layer":false},"connection_wait":{"level":"High","detail":"3 to 5 years","basis":"estimate"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/south-africa#cost","low_usd_per_mwh":92,"high_usd_per_mwh":128,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:south-africa:tier:2026-06","report_url":"https://powergridiq.com/rating/south-africa#cost"},"low_usd_per_mwh":{"value":92,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:south-africa:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/south-africa#cost"},"high_usd_per_mwh":{"value":128,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:south-africa:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/south-africa#cost"}}},{"id":"spain","name":"Spain","flag":"🇪🇸","region":"europe","region_label":"Europe","band_kind":"band","how_built":"triangulated","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"High","detail":"permit-gated","basis":"estimate"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/spain#cost","low_usd_per_mwh":82,"high_usd_per_mwh":118,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:spain:tier:2026-06","report_url":"https://powergridiq.com/rating/spain#cost"},"low_usd_per_mwh":{"value":82,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:spain:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/spain#cost"},"high_usd_per_mwh":{"value":118,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:spain:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/spain#cost"}}},{"id":"sweden-south","name":"Sweden South (Malmo, SE4)","flag":"🇸🇪","region":"europe","region_label":"Europe","band_kind":"band","how_built":"modelled","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Moderate","detail":"2 to 4 years","basis":"estimate"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/sweden-south#cost","low_usd_per_mwh":70,"high_usd_per_mwh":115,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:sweden-south:tier:2026-06","report_url":"https://powergridiq.com/rating/sweden-south#cost"},"low_usd_per_mwh":{"value":70,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:sweden-south:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/sweden-south#cost"},"high_usd_per_mwh":{"value":115,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:sweden-south:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/sweden-south#cost"}}},{"id":"thailand","name":"Thailand","flag":"🇹🇭","region":"asia","region_label":"Asia","band_kind":"band","how_built":"administered","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":null,"total_lines":null,"verified_layer":false},"connection_wait":{"level":"Moderate","detail":"2 to 4 years","basis":"estimate"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/thailand#cost","low_usd_per_mwh":90,"high_usd_per_mwh":125,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:thailand:tier:2026-06","report_url":"https://powergridiq.com/rating/thailand#cost"},"low_usd_per_mwh":{"value":90,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:thailand:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/thailand#cost"},"high_usd_per_mwh":{"value":125,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:thailand:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/thailand#cost"}}},{"id":"germany-south","name":"Germany South (Frankfurt/Munich)","flag":"🇩🇪","region":"europe","region_label":"Europe","band_kind":"band","how_built":"triangulated","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Severe","detail":"7 to 10 years","basis":"measured"},"tier":4,"tier_name":"Constrained","report_url":"https://powergridiq.com/rating/germany-south#cost","low_usd_per_mwh":108,"high_usd_per_mwh":158,"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:germany-south:tier:2026-06","report_url":"https://powergridiq.com/rating/germany-south#cost"},"low_usd_per_mwh":{"value":108,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:germany-south:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/germany-south#cost"},"high_usd_per_mwh":{"value":158,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:germany-south:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/germany-south#cost"}}},{"id":"great-britain","name":"Great Britain","flag":"🇬🇧","region":"europe","region_label":"Europe","band_kind":"band","how_built":"triangulated","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":0,"total_lines":4,"verified_layer":false},"connection_wait":{"level":"High","detail":"2 to 6 years (modelled from the generation queue)","basis":"modelled"},"tier":4,"tier_name":"Constrained","report_url":"https://powergridiq.com/rating/great-britain#cost","low_usd_per_mwh":118,"high_usd_per_mwh":168,"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:great-britain:tier:2026-06","report_url":"https://powergridiq.com/rating/great-britain#cost"},"low_usd_per_mwh":{"value":118,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:great-britain:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/great-britain#cost"},"high_usd_per_mwh":{"value":168,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:great-britain:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/great-britain#cost"}}},{"id":"hong-kong","name":"Hong Kong","flag":"🇭🇰","region":"asia","region_label":"Asia","band_kind":"band","how_built":"administered","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":null,"total_lines":null,"verified_layer":false},"connection_wait":{"level":"Moderate","detail":"2 to 3 years","basis":"estimate"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/hong-kong#cost","low_usd_per_mwh":170,"high_usd_per_mwh":210,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:hong-kong:tier:2026-06","report_url":"https://powergridiq.com/rating/hong-kong#cost"},"low_usd_per_mwh":{"value":170,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:hong-kong:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/hong-kong#cost"},"high_usd_per_mwh":{"value":210,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:hong-kong:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/hong-kong#cost"}}},{"id":"ireland","name":"Ireland (Dublin)","flag":"🇮🇪","region":"europe","region_label":"Europe","band_kind":"band","how_built":"modelled","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":true},"connection_wait":{"level":"High","detail":"3 to 5 years (modelled from the generation queue)","basis":"modelled"},"tier":5,"tier_name":"Largely closed","report_url":"https://powergridiq.com/rating/ireland#cost","low_usd_per_mwh":130,"high_usd_per_mwh":180,"figures":{"tier":{"value":5,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:ireland:tier:2026-06","report_url":"https://powergridiq.com/rating/ireland#cost"},"low_usd_per_mwh":{"value":130,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ireland:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ireland#cost"},"high_usd_per_mwh":{"value":180,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ireland:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ireland#cost"}}},{"id":"japan-east","name":"Japan East (Tokyo, 50Hz)","flag":"🇯🇵","region":"asia","region_label":"Asia","band_kind":"band","how_built":"modelled","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Severe","detail":"5 to 10 years","basis":"measured"},"tier":4,"tier_name":"Constrained","report_url":"https://powergridiq.com/rating/japan-east#cost","low_usd_per_mwh":135,"high_usd_per_mwh":190,"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:japan-east:tier:2026-06","report_url":"https://powergridiq.com/rating/japan-east#cost"},"low_usd_per_mwh":{"value":135,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:japan-east:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/japan-east#cost"},"high_usd_per_mwh":{"value":190,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:japan-east:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/japan-east#cost"}}},{"id":"japan-west","name":"Japan West (Osaka, 60Hz)","flag":"🇯🇵","region":"asia","region_label":"Asia","band_kind":"band","how_built":"modelled","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"High","detail":"4 to 8 years","basis":"estimate"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/japan-west#cost","low_usd_per_mwh":125,"high_usd_per_mwh":175,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:japan-west:tier:2026-06","report_url":"https://powergridiq.com/rating/japan-west#cost"},"low_usd_per_mwh":{"value":125,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:japan-west:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/japan-west#cost"},"high_usd_per_mwh":{"value":175,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:japan-west:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/japan-west#cost"}}},{"id":"netherlands","name":"Netherlands","flag":"🇳🇱","region":"europe","region_label":"Europe","band_kind":"band","how_built":"triangulated","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Severe","detail":"38 GW load queue; wait 6 to 10 years","basis":"measured"},"tier":4,"tier_name":"Constrained","report_url":"https://powergridiq.com/rating/netherlands#cost","low_usd_per_mwh":108,"high_usd_per_mwh":150,"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:netherlands:tier:2026-06","report_url":"https://powergridiq.com/rating/netherlands#cost"},"low_usd_per_mwh":{"value":108,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:netherlands:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/netherlands#cost"},"high_usd_per_mwh":{"value":150,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:netherlands:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/netherlands#cost"}}},{"id":"philippines","name":"Philippines","flag":"🇵🇭","region":"asia","region_label":"Asia","band_kind":"band","how_built":"triangulated","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":0,"total_lines":4,"verified_layer":false},"connection_wait":{"level":"Moderate","detail":"2 to 4 years","basis":"estimate"},"tier":4,"tier_name":"Constrained","report_url":"https://powergridiq.com/rating/philippines#cost","low_usd_per_mwh":140,"high_usd_per_mwh":210,"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:philippines:tier:2026-06","report_url":"https://powergridiq.com/rating/philippines#cost"},"low_usd_per_mwh":{"value":140,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:philippines:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/philippines#cost"},"high_usd_per_mwh":{"value":210,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:philippines:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/philippines#cost"}}},{"id":"south-korea","name":"South Korea","flag":"🇰🇷","region":"asia","region_label":"Asia","band_kind":"band","how_built":"administered","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":null,"total_lines":null,"verified_layer":false},"connection_wait":{"level":"High","detail":"3 to 5 years","basis":"estimate"},"tier":3,"tier_name":"Workable","report_url":"https://powergridiq.com/rating/south-korea#cost","low_usd_per_mwh":120,"high_usd_per_mwh":150,"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:south-korea:tier:2026-06","report_url":"https://powergridiq.com/rating/south-korea#cost"},"low_usd_per_mwh":{"value":120,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:south-korea:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/south-korea#cost"},"high_usd_per_mwh":{"value":150,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:south-korea:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/south-korea#cost"}}},{"id":"taiwan","name":"Taiwan","flag":"🇹🇼","region":"asia","region_label":"Asia","band_kind":"band","how_built":"administered","where_it_sits":"Most expensive third of 32","third":3,"evidence":{"lines_evidenced_pct":null,"total_lines":null,"verified_layer":false},"connection_wait":{"level":"Severe","detail":"3 to 5 years","basis":"estimate"},"tier":4,"tier_name":"Constrained","report_url":"https://powergridiq.com/rating/taiwan#cost","low_usd_per_mwh":128,"high_usd_per_mwh":140,"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:taiwan:tier:2026-06","report_url":"https://powergridiq.com/rating/taiwan#cost"},"low_usd_per_mwh":{"value":128,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:taiwan:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/taiwan#cost"},"high_usd_per_mwh":{"value":140,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:taiwan:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/taiwan#cost"}}}],"not_compared":[{"id":"quebec","name":"Quebec","flag":"🇨🇦","region":"canada","kind":"compiled_not_compared","report_url":"https://powergridiq.com/rating/quebec","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"Quebec's cost review closed Affirmed, no change, on 31 Oct 2026; its band is held out of the comparison until the Régie decides R-4333-2026.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["Awaiting the Regie decision on R-4333-2026: the data-centre rate is not decided, so the band is not comparable today"],"next_action":"Revisit when the decision is issued."}},{"id":"caiso","name":"CAISO (California)","flag":"🇺🇸","region":"us","kind":"compiled_not_compared","report_url":"https://powergridiq.com/rating/caiso","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"CAISO's cost read is under review, so its band is withheld until the review closes.","reason_code":"methodology_unresolved","permanence":"temporary","details":{"under_review_since":"Jul 2026","missing":["Cost availability: cost still being decided. A comparable band needs a standard published cost."],"next_action":"Resolve the methodology from first principles, then populate. Not a data-collection problem."}},{"id":"us-southeast","name":"US Southeast (Atlanta)","flag":"🇺🇸","region":"us","kind":"withdrawn","report_url":"https://powergridiq.com/rating/us-southeast","group":"no_public_rate","group_label":"No public rate a new large load can take.","reason_text":"Georgia closed its standard schedules to new large loads on 1 February 2025 and requires an individually negotiated contract instead.","reason_code":"structurally_unavailable","permanence":"structural","details":{"record":"The band was anchored on a regulated bundled industrial tariff that a new 100 MW load cannot take: Georgia closed its standard schedules to new large loads on 1 February 2025 and requires an individually negotiated contract instead. The band's primary source was also EIA industrial monthly pricing, which may serve only as a lagged validation layer and not as the headline large-load price.","band_withdrawn":"2026-08-20","missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Filed or executed contract terms, or a published contract-based rate. Searching for a tariff schedule will not close it."}},{"id":"pacific-northwest","name":"Pacific Northwest","flag":"🇺🇸","region":"us","kind":"withdrawn","report_url":"https://powergridiq.com/rating/pacific-northwest","group":"no_public_rate","group_label":"No public rate a new large load can take.","reason_text":"Federal hydro allocations are largely committed and a new customer would pay a market premium above the federal rate.","reason_code":"inapplicable","permanence":"structural","details":{"record":"The published band was derived from the Bonneville Power Administration priority-firm rate, which a new large load cannot obtain: federal hydro allocations are largely committed and a new customer would pay a market premium above the federal rate. A tariff the standard archetype cannot purchase may not set a delivered-cost band.","band_withdrawn":"2026-08-20","missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","Cost here is set by a bilateral arrangement rather than a posted rate, so no standardized band can represent it.","no figure stated in US dollars per MWh"],"next_action":"Obtain evidence for a service the archetype could actually contract. The existing figures cannot be repaired by recalculation."}},{"id":"brazil","name":"Brazil (Sao Paulo)","flag":"🇧🇷","region":"latam","kind":"no_band","report_url":"https://powergridiq.com/rating/brazil","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"desert-southwest","name":"Desert Southwest (Phoenix)","flag":"🇺🇸","region":"us","kind":"withdrawn","report_url":"https://powergridiq.com/rating/desert-southwest","group":"decision_pending","group_label":"A rate decision is pending.","reason_text":"The Arizona Corporation Commission's decision is due by 31 December 2026.","reason_code":"inapplicable","permanence":"structural","details":{"what":"APS rate case seeking roughly +45% for extra-large load customers, alongside changes to the Extra High Load Factor rate that applies to data centres.","why_it_matters":"If approved, the effective cost for a new large load in APS territory rises materially. This is a dated, cited risk to a future band, and it is deliberately reported here rather than inside one.","source":{"name":"Arizona Corporation Commission, What's Next in the APS Rate Case (10 July 2026)","url":"https://www.azcc.gov/news/home/2026/07/10/what-s-next-in-the-aps-rate-case"},"record":"The published band blended an effective regulated rate with APS's PROPOSED extra-large-load class of roughly +45%, which the Arizona Corporation Commission has not decided: the rate-case hearing closed 7 July 2026 and the Commission's vote is due by 31 December 2026. A pending proceeding may not set a current delivered cost. The band's primary source was also an ACC large-load workshop rather than a tariff.","band_withdrawn":"2026-08-20","missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Obtain evidence for a service the archetype could actually contract. The existing figures cannot be repaired by recalculation."}},{"id":"isone","name":"ISO New England","flag":"🇺🇸","region":"us","kind":"withdrawn","report_url":"https://powergridiq.com/rating/isone","group":"many_utilities","group_label":"Cost is set by many utilities.","reason_text":"The regional transmission layer is uniform and verifiable, but local transmission, distribution and retail demand charges are set by 32 serving utilities across six states and five regulators.","reason_code":"scope_fragmented","permanence":"structural","details":{"record":"A single delivered-cost estimate cannot be defended at ISO-NE-wide scope. The regional transmission layer is uniform and verifiable, but local transmission, distribution and retail demand charges are set by 32 serving utilities across six states and five regulators. The superseded values are recorded in the correction record, not here.","band_withdrawn":"2026-08-24","missing":["no delivered-cost basis is stated","Cost availability: depends on the state or province. A comparable band needs a standard published cost.","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Narrow to one serving utility and interconnection point, then apply that utility's local transmission and distribution tariff. No region-wide document will close it, because no regional body sets these charges."}},{"id":"british-columbia","name":"British Columbia","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/british-columbia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"manitoba","name":"Manitoba","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/manitoba","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"newfoundland","name":"Newfoundland & Labrador","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/newfoundland","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"saskatchewan","name":"Saskatchewan","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/saskatchewan","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"new-brunswick","name":"New Brunswick","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/new-brunswick","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"nova-scotia","name":"Nova Scotia","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/nova-scotia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"portugal","name":"Portugal","flag":"🇵🇹","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/portugal","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"austria","name":"Austria","flag":"🇦🇹","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/austria","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"denmark","name":"Denmark","flag":"🇩🇰","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/denmark","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"belgium","name":"Belgium","flag":"🇧🇪","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/belgium","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"switzerland","name":"Switzerland","flag":"🇨🇭","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/switzerland","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"czech-republic","name":"Czech Republic","flag":"🇨🇿","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/czech-republic","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"romania","name":"Romania","flag":"🇷🇴","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/romania","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"lithuania","name":"Lithuania","flag":"🇱🇹","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/lithuania","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"italy","name":"Italy (Milan, North)","flag":"🇮🇹","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/italy","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"poland","name":"Poland","flag":"🇵🇱","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/poland","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"latvia","name":"Latvia","flag":"🇱🇻","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/latvia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"slovakia","name":"Slovakia","flag":"🇸🇰","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/slovakia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"greece","name":"Greece","flag":"🇬🇷","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/greece","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"hungary","name":"Hungary","flag":"🇭🇺","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/hungary","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"bulgaria","name":"Bulgaria","flag":"🇧🇬","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/bulgaria","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"estonia","name":"Estonia","flag":"🇪🇪","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/estonia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"croatia","name":"Croatia","flag":"🇭🇷","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/croatia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"slovenia","name":"Slovenia","flag":"🇸🇮","region":"europe","kind":"no_band","report_url":"https://powergridiq.com/rating/slovenia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"qatar","name":"Qatar","flag":"🇶🇦","region":"middle_east","kind":"no_band","report_url":"https://powergridiq.com/rating/qatar","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"egypt","name":"Egypt","flag":"🇪🇬","region":"middle_east","kind":"no_band","report_url":"https://powergridiq.com/rating/egypt","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"kuwait","name":"Kuwait","flag":"🇰🇼","region":"middle_east","kind":"no_band","report_url":"https://powergridiq.com/rating/kuwait","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"turkey","name":"Turkey","flag":"🇹🇷","region":"middle_east","kind":"no_band","report_url":"https://powergridiq.com/rating/turkey","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"israel","name":"Israel","flag":"🇮🇱","region":"middle_east","kind":"no_band","report_url":"https://powergridiq.com/rating/israel","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"iraq","name":"Iraq","flag":"🇮🇶","region":"middle_east","kind":"no_band","report_url":"https://powergridiq.com/rating/iraq","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"chile","name":"Chile","flag":"🇨🇱","region":"latam","kind":"no_band","report_url":"https://powergridiq.com/rating/chile","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"uruguay","name":"Uruguay","flag":"🇺🇾","region":"latam","kind":"no_band","report_url":"https://powergridiq.com/rating/uruguay","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"colombia","name":"Colombia","flag":"🇨🇴","region":"latam","kind":"no_band","report_url":"https://powergridiq.com/rating/colombia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"argentina","name":"Argentina","flag":"🇦🇷","region":"latam","kind":"no_band","report_url":"https://powergridiq.com/rating/argentina","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"costa-rica","name":"Costa Rica","flag":"🇨🇷","region":"latam","kind":"no_band","report_url":"https://powergridiq.com/rating/costa-rica","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"new-zealand","name":"New Zealand","flag":"🇳🇿","region":"oceania","kind":"no_band","report_url":"https://powergridiq.com/rating/new-zealand","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"australia-nsw","name":"Australia NSW (Sydney)","flag":"🇦🇺","region":"oceania","kind":"no_band","report_url":"https://powergridiq.com/rating/australia-nsw","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"australia-vic","name":"Australia Victoria (Melbourne)","flag":"🇦🇺","region":"oceania","kind":"no_band","report_url":"https://powergridiq.com/rating/australia-vic","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"australia-qld","name":"Australia Queensland (Brisbane)","flag":"🇦🇺","region":"oceania","kind":"no_band","report_url":"https://powergridiq.com/rating/australia-qld","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"singapore","name":"Singapore","flag":"🇸🇬","region":"asia","kind":"no_band","report_url":"https://powergridiq.com/rating/singapore","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":null,"details":{"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}}],"changes":{"pending":[{"market":"desert-southwest","name":"Desert Southwest (Phoenix)","flag":"🇺🇸","region":"us","date_iso":"2026-12-31","date_precision":"day","kind":"pending_decision","text":"Arizona Corporation Commission: APS rate case seeking roughly +45% for extra-large load customers, alongside changes to the Extra High Load Factor rate that applies to data centres.","source":{"name":"Arizona Corporation Commission, What's Next in the APS Rate Case (10 July 2026)","url":"https://www.azcc.gov/news/home/2026/07/10/what-s-next-in-the-aps-rate-case"}}],"events":[{"market":"isone","name":"ISO New England","flag":"🇺🇸","region":"us","date_iso":"2026-10-31","date_precision":"day","kind":"rating_action","text":"Affirmed: Affirmed, no change, 31 Oct 2026.","url":"/rating/isone#history"},{"market":"caiso","name":"CAISO (California)","flag":"🇺🇸","region":"us","date_iso":"2026-10-24","date_precision":"day","kind":"cost_history","text":"A method change: the arithmetic moved, not the market.","url":"/api/v1/cost-history/caiso"},{"market":"uae","name":"United Arab Emirates","flag":"🇦🇪","region":"middle_east","date_iso":"2026-10-23","date_precision":"day","kind":"rating_action","text":"Affirmed: Affirmed, no change, 23 Oct 2026.","url":"/rating/uae#history"},{"market":"isone","name":"ISO New England","flag":"🇺🇸","region":"us","date_iso":"2026-10-23","date_precision":"day","kind":"rating_action","text":"Under review: Review extended 2026-10-23.","url":"/rating/isone#history"},{"market":"isone","name":"ISO New England","flag":"🇺🇸","region":"us","date_iso":"2026-10","date_precision":"month","kind":"rating_action","text":"Downgrade: Tier 3 Workable to Tier 4 Constrained under the published tier rules: a PGIQ Rating of 46 sits in the Tier 4 band.","url":"/rating/isone#history"},{"market":"spp","name":"SPP (Southwest Power Pool)","flag":"🇺🇸","region":"us","date_iso":"2026-08-24","date_precision":"day","kind":"cost_history","text":"A method change: the arithmetic moved, not the market; 2 other value changes held for an editor to classify.","url":"/api/v1/cost-history/spp"},{"market":"northern-virginia","name":"Northern Virginia (PJM)","flag":"🇺🇸","region":"us","date_iso":"2026-08-24","date_precision":"day","kind":"cost_history","text":"A method change: the arithmetic moved, not the market; 2 other value changes held for an editor to classify.","url":"/api/v1/cost-history/northern-virginia"},{"market":"nyiso","name":"NYISO (New York)","flag":"🇺🇸","region":"us","date_iso":"2026-08-24","date_precision":"day","kind":"cost_history","text":"A method change: the arithmetic moved, not the market; 2 other value changes held for an editor to classify.","url":"/api/v1/cost-history/nyiso"},{"market":"miso","name":"MISO (Midwest)","flag":"🇺🇸","region":"us","date_iso":"2026-08-24","date_precision":"day","kind":"cost_history","text":"A method change: the arithmetic moved, not the market; 3 other value changes held for an editor to classify.","url":"/api/v1/cost-history/miso"},{"market":"isone","name":"ISO New England","flag":"🇺🇸","region":"us","date_iso":"2026-08-24","date_precision":"day","kind":"correction","text":"ISO New England region-wide delivered-cost estimate withdrawn.","url":"/corrections#isone"},{"market":"ercot-west","name":"ERCOT West (West Texas & Panhandle)","flag":"🇺🇸","region":"us","date_iso":"2026-08-24","date_precision":"day","kind":"cost_history","text":"A method change: the arithmetic moved, not the market; 2 other value changes held for an editor to classify.","url":"/api/v1/cost-history/ercot-west"},{"market":"ercot-central","name":"ERCOT Central (Houston & DFW)","flag":"🇺🇸","region":"us","date_iso":"2026-08-24","date_precision":"day","kind":"cost_history","text":"A method change: the arithmetic moved, not the market; 2 other value changes held for an editor to classify.","url":"/api/v1/cost-history/ercot-central"},{"market":"us-southeast","name":"US Southeast (Atlanta)","flag":"🇺🇸","region":"us","date_iso":"2026-08-23","date_precision":"day","kind":"cost_history","text":"What can be published changed (a band withdrawn or restored, a breakdown withheld, or a review opened or closed).","url":"/api/v1/cost-history/us-southeast"},{"market":"northern-virginia","name":"Northern Virginia (PJM)","flag":"🇺🇸","region":"us","date_iso":"2026-08-23","date_precision":"day","kind":"correction","text":"Northern Virginia recurring cost estimate corrected.","url":"/corrections#northern-virginia"},{"market":"us-southeast","name":"US Southeast (Atlanta)","flag":"🇺🇸","region":"us","date_iso":"2026-08-20","date_precision":"day","kind":"band_withdrawn","text":"The band was anchored on a regulated bundled industrial tariff that a new 100 MW load cannot take.","url":"/realized-cost#withheld"},{"market":"pacific-northwest","name":"Pacific Northwest","flag":"🇺🇸","region":"us","date_iso":"2026-08-20","date_precision":"day","kind":"band_withdrawn","text":"The published band was derived from the Bonneville Power Administration priority-firm rate, which a new large load cannot obtain.","url":"/realized-cost#withheld"},{"market":"desert-southwest","name":"Desert Southwest (Phoenix)","flag":"🇺🇸","region":"us","date_iso":"2026-08-20","date_precision":"day","kind":"band_withdrawn","text":"The published band blended an effective regulated rate with APS's proposed extra-large-load class of roughly +45%, which the Arizona Corporation Commission has not decided.","url":"/realized-cost#withheld"},{"market":"uae","name":"United Arab Emirates","flag":"🇦🇪","region":"middle_east","date_iso":"2026-07","date_precision":"month","kind":"rating_action","text":"Under review. Details in the market report.","url":"/rating/uae#history"},{"market":"quebec","name":"Quebec","flag":"🇨🇦","region":"canada","date_iso":"2026-07","date_precision":"month","kind":"rating_action","text":"Under review. Details in the market report.","url":"/rating/quebec#history"},{"market":"northern-virginia","name":"Northern Virginia (PJM)","flag":"🇺🇸","region":"us","date_iso":"2026-07","date_precision":"month","kind":"rating_action","text":"Under review: A statewide $0.011/kWh consumption tax stacks on capacity prices at the cap and DOE-ordered curtailment exposure; direction of the Cost pillar is clearly negative, tier impact under assessment.","url":"/rating/northern-virginia#history"},{"market":"caiso","name":"CAISO (California)","flag":"🇺🇸","region":"us","date_iso":"2026-07","date_precision":"month","kind":"rating_action","text":"Under review. Details in the market report.","url":"/rating/caiso#history"}],"history_coverage":{"recorded_markets":["caiso","desert-southwest","ercot-central","ercot-west","isone","miso","northern-virginia","nyiso","pacific-northwest","spp","us-southeast"],"band_markets":32,"band_markets_not_recorded":26,"changes_recorded":42,"market_signals":0,"first_recorded":"2026-08-21","per_market":{"ercot-west":{"first_recorded":"2026-08-21","changes":3,"market_signals":0},"ercot-central":{"first_recorded":"2026-08-21","changes":3,"market_signals":0},"northern-virginia":{"first_recorded":"2026-08-21","changes":12,"market_signals":0},"us-southeast":{"first_recorded":"2026-08-21","changes":1,"market_signals":0},"pacific-northwest":{"first_recorded":"2026-08-21","changes":0,"market_signals":0},"desert-southwest":{"first_recorded":"2026-08-21","changes":0,"market_signals":0},"spp":{"first_recorded":"2026-08-21","changes":3,"market_signals":0},"miso":{"first_recorded":"2026-08-21","changes":4,"market_signals":0},"caiso":{"first_recorded":"2026-08-21","changes":1,"market_signals":0},"nyiso":{"first_recorded":"2026-08-21","changes":3,"market_signals":0},"isone":{"first_recorded":"2026-08-21","changes":12,"market_signals":0}}}},"figure_contract_version":"1.0"}