{"schema":"cost-hub-1.0","as_of":"June 2026","bands_dated":{"values":["2026"],"precision":"year","undated_market_ids":["hong-kong","indonesia","northern-virginia","saudi-arabia","south-africa","south-korea","taiwan","thailand","uae"],"note":"Bands are dated to the year in the record. Month-level dates are not recorded yet. as_of is the rating vintage, not a band date."},"currency":"USD","unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","archetype":{"mw":100,"load_factor_pct":95,"gwh":832.2,"hours":8760,"power_factor":0.95,"n1":"N-1 at the supplying substation, transfer within 30 minutes","charges":"energy, capacity, demand, transmission, distribution, loss, ancillary, reactive-power, tax, levy, carbon and commercial-supply charges"},"not_wholesale":"This is the delivered cost for one declared large load, not the wholesale price.","views_total":84,"counts":{"cost_band_markets":32,"by_region":{"europe":11,"us":6,"canada":2,"asia":10,"middle_east":2,"africa":1}},"scale":{"low_usd_per_mwh":35,"high_usd_per_mwh":210,"figures":{"low_usd_per_mwh":{"value":35,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:global:low_usd_per_mwh:2026-06","report_url":null},"high_usd_per_mwh":{"value":210,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:global:high_usd_per_mwh:2026-06","report_url":null}}},"free_and_desk":"Each market's own band, midpoint included, is free on its report. The full ranking with precise midpoints, every dated change and exports is the Analyst Desk.","region":"canada","html_url":"https://powergridiq.com/canada-power-cost-monitor","cheapest_in_view":["ontario","alberta"],"markets":[{"id":"ontario","name":"Ontario","flag":"🇨🇦","region":"canada","region_label":"Canada","band_kind":"band","how_built":"triangulated","where_it_sits":"Cheapest third of 32","third":1,"evidence":{"lines_evidenced_pct":0,"total_lines":4,"verified_layer":false},"connection_wait":{"level":"High","detail":"3 to 5 years","basis":"estimate"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/ontario#cost","low_usd_per_mwh":55,"high_usd_per_mwh":100,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:ontario:tier:2026-06","report_url":"https://powergridiq.com/rating/ontario#cost"},"low_usd_per_mwh":{"value":55,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ontario:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ontario#cost"},"high_usd_per_mwh":{"value":100,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:ontario:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/ontario#cost"}}},{"id":"alberta","name":"Alberta","flag":"🇨🇦","region":"canada","region_label":"Canada","band_kind":"band","how_built":"triangulated","where_it_sits":"Middle third of 32","third":2,"evidence":{"lines_evidenced_pct":0,"total_lines":3,"verified_layer":false},"connection_wait":{"level":"Severe","detail":"5 to 8 years (queue capped)","basis":"measured"},"tier":2,"tier_name":"Strong","report_url":"https://powergridiq.com/rating/alberta#cost","low_usd_per_mwh":60,"high_usd_per_mwh":110,"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:alberta:tier:2026-06","report_url":"https://powergridiq.com/rating/alberta#cost"},"low_usd_per_mwh":{"value":60,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:alberta:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/alberta#cost"},"high_usd_per_mwh":{"value":110,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":null,"stable_id":"pgiq:alberta:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/alberta#cost"}}}],"not_compared":[{"id":"quebec","name":"Quebec","flag":"🇨🇦","region":"canada","kind":"compiled_not_compared","report_url":"https://powergridiq.com/rating/quebec","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"Quebec's cost review closed Affirmed, no change, on 31 Oct 2026; its band is held out of the comparison until the Régie decides R-4333-2026.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["Awaiting the Regie decision on R-4333-2026: the data-centre rate is not decided, so the band is not comparable today"],"next_action":"Revisit when the decision is issued."}},{"id":"british-columbia","name":"British Columbia","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/british-columbia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"manitoba","name":"Manitoba","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/manitoba","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"newfoundland","name":"Newfoundland & Labrador","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/newfoundland","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"saskatchewan","name":"Saskatchewan","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/saskatchewan","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"new-brunswick","name":"New Brunswick","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/new-brunswick","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}},{"id":"nova-scotia","name":"Nova Scotia","flag":"🇨🇦","region":"canada","kind":"no_band","report_url":"https://powergridiq.com/rating/nova-scotia","group":"gathering","group_label":"Evidence still being gathered.","reason_text":"No delivered-cost band has been compiled for these markets yet.","reason_code":"applicable_evidence_incomplete","permanence":"temporary","details":{"missing":["no delivered-cost basis is stated","no published band","no connection-voltage or serving-utility assumption is declared","no figure stated in US dollars per MWh"],"next_action":"Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract."}}],"changes":{"pending":[],"events":[{"market":"quebec","name":"Quebec","flag":"🇨🇦","region":"canada","date_iso":"2026-07","date_precision":"month","kind":"rating_action","text":"Under review. Details in the market report.","url":"/rating/quebec#history"}],"history_coverage":{"recorded_markets":["caiso","desert-southwest","ercot-central","ercot-west","isone","miso","northern-virginia","nyiso","pacific-northwest","spp","us-southeast"],"band_markets":32,"band_markets_not_recorded":26,"changes_recorded":42,"market_signals":0,"first_recorded":"2026-08-21","per_market":{"ercot-west":{"first_recorded":"2026-08-21","changes":3,"market_signals":0},"ercot-central":{"first_recorded":"2026-08-21","changes":3,"market_signals":0},"northern-virginia":{"first_recorded":"2026-08-21","changes":12,"market_signals":0},"us-southeast":{"first_recorded":"2026-08-21","changes":1,"market_signals":0},"pacific-northwest":{"first_recorded":"2026-08-21","changes":0,"market_signals":0},"desert-southwest":{"first_recorded":"2026-08-21","changes":0,"market_signals":0},"spp":{"first_recorded":"2026-08-21","changes":3,"market_signals":0},"miso":{"first_recorded":"2026-08-21","changes":4,"market_signals":0},"caiso":{"first_recorded":"2026-08-21","changes":1,"market_signals":0},"nyiso":{"first_recorded":"2026-08-21","changes":3,"market_signals":0},"isone":{"first_recorded":"2026-08-21","changes":12,"market_signals":0}}}},"figure_contract_version":"1.0"}