{"market_id":"alberta","generated_at":"June 2026","schema_version":"1.0","claim_count":7,"claims":[{"claim_id":"pgiq:claim:alberta:pgiq_tier:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"alberta","geography_id":"pgiq:geo:alberta"},"predicate":"pgiq_tier","value":{"base":2,"label":"Strong"},"unit":null,"definition":"PGIQ tier for siting a large new electricity load; a directional screen, not a connection guarantee","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"n/a (opinion)","coverage":"all rated markets","model_uncertainty":"n/a","opinion_confidence":"Med-High"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"tier definitions","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Canada's most open market: an energy-only, connect-friendly grid drawing a wave of AI data-centre announcements, with cheap gas for self-supply. What holds it back is higher power cost, a gas-heavy grid, and an interim AESO cap on large-load connections.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:76ea28b578fb896175b7af8501c15ca79b2ebb0a936d88e7705ba31968c0345b"},{"claim_id":"pgiq:claim:alberta:recurring_power_cost:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"alberta","geography_id":"pgiq:geo:alberta"},"predicate":"recurring_power_cost","value":{"low":60,"base":80,"high":110},"unit":"USD/MWh","definition":"recurring energy, network, delivery, taxes and levies per MWh; EXCLUDES customer-funded connection capital","project_archetype":"100mw_flat_95pct_lf_transmission_level","as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"triangulated","method_source_label":null,"confidence":{"source_quality":"triangulated","coverage":"2 public fragments","model_uncertainty":"band spans structuring outcomes","opinion_confidence":"n/a"},"sources":[{"publisher":"AESO market and pool price","title":"AESO market and pool price","url":"https://www.aeso.ca/market/market-and-system-reporting/","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"Alberta electricity rates (Utilities Consumer Advocate)","title":"Alberta electricity rates (Utilities Consumer Advocate)","url":"https://www.ucahelps.alberta.ca/rates.aspx","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"Alberta electricity rates (Utilities Consumer Advocate)","title":"Alberta electricity rates (Utilities Consumer Advocate)","url":"https://www.ucahelps.alberta.ca/rates.aspx","published_at":null,"retrieved_at":"June 2026","locator":"price components","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(components)","model_version":"pgiq-rating-v2","inputs":[{"component":"Wholesale pool energy","usd_per_mwh":55},{"component":"Transmission & distribution","usd_per_mwh":22},{"component":"Riders & other","usd_per_mwh":3}]},"contradictions":[],"supersedes":null,"note":"Alberta is an energy-only market, so there is no capacity charge; the non-energy cost is transmission and distribution plus riders.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:f74768a41108a6d9d24b8105c995194c86d05bd9fbe57142779df5c921a22798"},{"claim_id":"pgiq:claim:alberta:connection_wait:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"alberta","geography_id":"pgiq:geo:alberta"},"predicate":"connection_wait","value":{"low":60,"base":72,"high":96},"unit":"months","definition":"from a complete application being accepted to full firm energization of the nominated MW, expressed as a band. Initial, phased, temporary and conditional energization are separate, earlier milestones. Derived from the operator process and market evidence rather than a measured project cohort.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"measured","method_source_label":null,"confidence":{"source_quality":"Med-High","coverage":"band, not a measured cohort","model_uncertainty":"stage durations overlap and vary by project","opinion_confidence":"n/a"},"sources":[{"publisher":"AESO large-load connection process","title":"AESO large-load connection process","url":"https://www.aeso.ca/grid/connecting-to-the-grid/large-load-projects/","published_at":null,"retrieved_at":"June 2026","locator":"process stages","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(stage_durations)","model_version":"pgiq-rating-v2","inputs":[{"stage":"Application & queue entry","months":12},{"stage":"System study & connection offer","months":12},{"stage":"Transmission build","months":36},{"stage":"Construction & energization","months":12}]},"contradictions":[],"supersedes":null,"note":"AESO's interim 1,200 MW cap is fully allocated to two projects; about 37 more wait or must bring their own power.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:cc908b200c68fff0674a6bfa3bb61889b8f94260bea8b09463b47638ed388748"},{"claim_id":"pgiq:claim:alberta:scheduled_change:june-2026:1","claim_type":"fact","status":"active","subject":{"market_id":"alberta","geography_id":"pgiq:geo:alberta"},"predicate":"scheduled_change","value":{"base":"AESO durable Phase 2 large-load connection framework expected","effective":"2026","year":2026},"unit":null,"definition":"a dated, already-announced event that will affect a large load sited here. A published fact with a source, not our forecast.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"reported","method_source_label":null,"confidence":{"source_quality":"cited announcement","coverage":"stated timing 2026","model_uncertainty":"announced timing can slip","opinion_confidence":"n/a"},"sources":[{"publisher":"AESO","title":"AESO","url":"https://www.aeso.ca/","published_at":null,"retrieved_at":"June 2026","locator":"announcement","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Replaces the interim cap (now fully subscribed); shapes whether new large loads can connect at scale.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:2ebfaffa4b9f723200fc80c1a15e6568e8da7a510045458590b9f7b5a9efb4f1"},{"claim_id":"pgiq:claim:alberta:forward_adequacy:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"alberta","geography_id":"pgiq:geo:alberta"},"predicate":"forward_adequacy","value":{"base":"watch","label":"Adequacy flagged"},"unit":null,"definition":"forward firm-supply adequacy for a prospective large new load; level vocabulary none|watch|elevated|severe","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"historical","method_source_label":"event-based","confidence":{"source_quality":"modelled read","coverage":"market-level","model_uncertainty":"not site-specific","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"reliability overlay","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Recent grid alerts reflect thin reserve margins during extreme cold and low imports; market and build response is underway.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:3fda50081d258cb485a07fa4b8fafb3efaeedbd73bd08c16a4ebed56dc956bdb"},{"claim_id":"pgiq:claim:alberta:average_operational_carbon_intensity:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"alberta","geography_id":"pgiq:geo:alberta"},"predicate":"average_operational_carbon_intensity","value":{"base":380},"unit":"gCO2eq/kWh","definition":"Estimated average operational grid emissions intensity in gCO2e per kWh, for a declared geography, period and system boundary, using direct operational emission factors. The generation-versus-consumption basis, imports, delivery losses, temporal granularity, factor set, factor vintage and uncertainty are disclosed or marked unknown. Permitted for location-based grid comparison only. It is not a marginal-emissions estimate, a lifecycle assessment, a procurement claim, or by itself a market-based Scope 2 result.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"stated generation mix","coverage":"market-level annual average","model_uncertainty":"average, not marginal or lifecycle","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"carbon basis","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Average operational intensity from the stated generation mix. Not marginal, lifecycle or market-based Scope 2.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:23339b0f4e15c96eaea8c31d4b722a1646c3ead24a4a3176d4da9eea81876d2b"},{"claim_id":"pgiq:claim:alberta:regulatory_momentum:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"alberta","geography_id":"pgiq:geo:alberta"},"predicate":"regulatory_momentum","value":{"base":"mixed","direction":"improving"},"unit":null,"definition":"direction and steadiness of the rules governing large-load connection (stroke-of-pen risk)","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"cited dated developments","coverage":"market-level","model_uncertainty":"n/a","opinion_confidence":"Med-High"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"regulatory momentum","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"The interim AESO large-load connection cap is fully subscribed, but a durable Phase 2 framework is expected as the province writes its data-centre rules. WHAT WOULD CHANGE IT: AESO finalising an open, durable Phase 2 large-load connection framework.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:0d2298832df46bf7b182de7ebcb283f3fb87539edf95356eb13bcb8238b20949"}],"gaps":[{"predicate":"delivery_reliability_saidi","requires":"measured regulator outage record","state":"not_assessed","reason":"no regulator outage series compiled for this market yet","blocks_project_case":true},{"predicate":"local_deliverability","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"note":"A gap is not evidence that the risk is absent. It means we have not assessed it."}