{"market_id":"austria","generated_at":"June 2026","schema_version":"1.0","claim_count":4,"claims":[{"claim_id":"pgiq:claim:austria:pgiq_tier:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"austria","geography_id":"pgiq:geo:austria"},"predicate":"pgiq_tier","value":{"base":3,"label":"Workable"},"unit":null,"definition":"PGIQ tier for siting a large new electricity load; a directional screen, not a connection guarantee","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"n/a (opinion)","coverage":"all rated markets","model_uncertainty":"n/a","opinion_confidence":"Med"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"tier definitions","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Clean (hydro-led) and stable, but mid-scale and mid-cost; workable rather than a magnet.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:4fa03e6595e44e0d73440e7ab8819de6dfda783a4451a53e115e2ebe477ed442"},{"claim_id":"pgiq:claim:austria:delivery_reliability_saidi:june-2026","claim_type":"fact","status":"active","subject":{"market_id":"austria","geography_id":"pgiq:geo:austria"},"predicate":"delivery_reliability_saidi","value":{"base":37.72},"unit":"minutes per customer per year","definition":"regulator outage measure (SAIDI or stated equivalent) for the distribution network;","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"measured","method_source_label":null,"confidence":{"source_quality":"regulator filing","coverage":"year 2022","model_uncertainty":"n/a","opinion_confidence":"n/a"},"sources":[{"publisher":"E-Control (via CEER)","title":"E-Control (via CEER)","url":"https://www.ceer.eu/wp-content/uploads/2024/11/E-Control-annual-activity-report-2024.pdf","published_at":"2022","retrieved_at":"June 2026","locator":"reliability summary","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:3ea207097f4bd4350b54588b3deea780d1f2ca650b2ce00b91a9dd2f82a362b8"},{"claim_id":"pgiq:claim:austria:forward_adequacy:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"austria","geography_id":"pgiq:geo:austria"},"predicate":"forward_adequacy","value":{"base":"none","label":"No adequacy flags"},"unit":null,"definition":"forward firm-supply adequacy for a prospective large new load; level vocabulary none|watch|elevated|severe","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"modelled read","coverage":"market-level","model_uncertainty":"not site-specific","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"reliability overlay","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:d21604e39328b2e3eef9089c490f3b0230bda08e15092d2055c5ddf7b43def0f"},{"claim_id":"pgiq:claim:austria:average_operational_carbon_intensity:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"austria","geography_id":"pgiq:geo:austria"},"predicate":"average_operational_carbon_intensity","value":{"base":85},"unit":"gCO2eq/kWh","definition":"Estimated average operational grid emissions intensity in gCO2e per kWh, for a declared geography, period and system boundary, using direct operational emission factors. The generation-versus-consumption basis, imports, delivery losses, temporal granularity, factor set, factor vintage and uncertainty are disclosed or marked unknown. Permitted for location-based grid comparison only. It is not a marginal-emissions estimate, a lifecycle assessment, a procurement claim, or by itself a market-based Scope 2 result.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"stated generation mix","coverage":"market-level annual average","model_uncertainty":"average, not marginal or lifecycle","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"carbon basis","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Average operational intensity from the stated generation mix. Not marginal, lifecycle or market-based Scope 2.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:c78089279cf0e0fdc6278c8564edd47696f54ca1e6c4a0c00378b6a63ad1d686"}],"gaps":[{"predicate":"recurring_power_cost","requires":"recurring cost for the declared archetype","state":"not_assessed","reason":"no compiled cost band for this market yet (check administered_large_user_tariff: where a regulated tariff exists it is the price actually paid)","blocks_project_case":true},{"predicate":"connection_wait","requires":"time from a complete application being accepted to full firm energization of the nominated MW; initial, phased, temporary and conditional energization are separate milestones","state":"not_assessed","reason":"no countable queue or operator-published process for this market","blocks_project_case":true},{"predicate":"regulatory_momentum","requires":"direction and steadiness of connection rules","state":"not_assessed","reason":"no dated regulatory read compiled for this market yet","blocks_project_case":false},{"predicate":"local_deliverability","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"note":"A gap is not evidence that the risk is absent. It means we have not assessed it."}