{"market_id":"finland","generated_at":"June 2026","schema_version":"1.0","claim_count":6,"claims":[{"claim_id":"pgiq:claim:finland:pgiq_tier:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"finland","geography_id":"pgiq:geo:finland"},"predicate":"pgiq_tier","value":{"base":2,"label":"Strong"},"unit":null,"definition":"PGIQ tier for siting a large new electricity load; a directional screen, not a connection guarantee","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"n/a (opinion)","coverage":"all rated markets","model_uncertainty":"n/a","opinion_confidence":"Med-High"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"tier definitions","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Cheap, clean and openly courting hyperscalers (Microsoft). A welcoming Nordic market with firm nuclear and abundant wind.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:64b3521d256cd2ce47f5ad640106b2d26e97e718db1543b86c7ac1addec44e7b"},{"claim_id":"pgiq:claim:finland:recurring_power_cost:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"finland","geography_id":"pgiq:geo:finland"},"predicate":"recurring_power_cost","value":{"low":42,"base":58,"high":78},"unit":"USD/MWh","definition":"recurring energy, network, delivery, taxes and levies per MWh; EXCLUDES customer-funded connection capital","project_archetype":"100mw_flat_95pct_lf_transmission_level","as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"triangulated","method_source_label":null,"confidence":{"source_quality":"triangulated","coverage":"2 public fragments","model_uncertainty":"band spans structuring outcomes","opinion_confidence":"n/a"},"sources":[{"publisher":"Non-household electricity prices, Finland lowest (Eurostat)","title":"Non-household electricity prices, Finland lowest (Eurostat)","url":"https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"EU electricity price components (Eurostat)","title":"EU electricity price components (Eurostat)","url":"https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics","published_at":null,"retrieved_at":"June 2026","locator":"price components","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(components)","model_version":"pgiq-rating-v2","inputs":[{"component":"Wholesale energy","usd_per_mwh":38},{"component":"Network charges","usd_per_mwh":15},{"component":"Taxes & levies","usd_per_mwh":5}]},"contradictions":[],"supersedes":null,"note":"Among the lowest non-household energy prices in the EU, helped by nuclear and Nordic hydro, with modest network charges.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:9bc6b7fc51dcabb6d801fb4253815d2322e912f851def5d8a3bc3d598a423582"},{"claim_id":"pgiq:claim:finland:connection_wait:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"finland","geography_id":"pgiq:geo:finland"},"predicate":"connection_wait","value":{"low":12,"base":24,"high":36},"unit":"months","definition":"from a complete application being accepted to full firm energization of the nominated MW, expressed as a band. Initial, phased, temporary and conditional energization are separate, earlier milestones. Derived from the operator process and market evidence rather than a measured project cohort.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":"proxy","confidence":{"source_quality":"Med","coverage":"band, not a measured cohort","model_uncertainty":"stage durations overlap and vary by project","opinion_confidence":"n/a"},"sources":[{"publisher":"Argus: Nordic data centres and power demand","title":"Argus: Nordic data centres and power demand","url":"https://www.argusmedia.com/en/news-and-insights/latest-market-news/2806298-nordic-data-centres-to-support-power-demand-growth","published_at":null,"retrieved_at":"June 2026","locator":"process stages","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(stage_durations)","model_version":"pgiq-rating-v2","inputs":[{"stage":"Application & site","months":4},{"stage":"Grid study & connection offer","months":8},{"stage":"Agreement & works planning","months":6},{"stage":"Construction & energization","months":6}]},"contradictions":[],"supersedes":null,"note":"Favorable and building: XTX's Kajaani mega-campus, low-carbon surplus.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:3bd42fcfbe1f93a8af24f585de5149af00976f05e00e73aec9a6d4f1ba324518"},{"claim_id":"pgiq:claim:finland:forward_adequacy:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"finland","geography_id":"pgiq:geo:finland"},"predicate":"forward_adequacy","value":{"base":"none","label":"No adequacy flags"},"unit":null,"definition":"forward firm-supply adequacy for a prospective large new load; level vocabulary none|watch|elevated|severe","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"modelled read","coverage":"market-level","model_uncertainty":"not site-specific","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"reliability overlay","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:411b98c34350e26ab48a39044e391e3d5c4406bdba255f6ed7d65fe8259fdd26"},{"claim_id":"pgiq:claim:finland:average_operational_carbon_intensity:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"finland","geography_id":"pgiq:geo:finland"},"predicate":"average_operational_carbon_intensity","value":{"base":50},"unit":"gCO2eq/kWh","definition":"Estimated average operational grid emissions intensity in gCO2e per kWh, for a declared geography, period and system boundary, using direct operational emission factors. The generation-versus-consumption basis, imports, delivery losses, temporal granularity, factor set, factor vintage and uncertainty are disclosed or marked unknown. Permitted for location-based grid comparison only. It is not a marginal-emissions estimate, a lifecycle assessment, a procurement claim, or by itself a market-based Scope 2 result.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"stated generation mix","coverage":"market-level annual average","model_uncertainty":"average, not marginal or lifecycle","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"carbon basis","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Average operational intensity from the stated generation mix. Not marginal, lifecycle or market-based Scope 2.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:75253de156c0c7b00bc843d3833fedb60455a1c73790c634e7df1fa966aa2d3c"},{"claim_id":"pgiq:claim:finland:regulatory_momentum:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"finland","geography_id":"pgiq:geo:finland"},"predicate":"regulatory_momentum","value":{"base":"mixed","direction":"worsening"},"unit":null,"definition":"direction and steadiness of the rules governing large-load connection (stroke-of-pen risk)","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"cited dated developments","coverage":"market-level","model_uncertainty":"n/a","opinion_confidence":"Med-High"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"regulatory momentum","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"From 1 July 2026 Finland moves data-centre electricity from the lower tax category II to the general category I, raising the power tax by about 2.19 cents per kWh, and Fingrid is restricting new connections in some areas until 2027 while it consults on the KJV2026 demand-connection code (draft 12 June 2026). A replacement incentive for value-added data centres is due in autumn 2026. WHAT WOULD CHANGE IT: The autumn 2026 incentive scheme and Fingrid's capacity build offsetting the tax rise for large, heat-integrated loads.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:6fb3f9c98cef2b419c8a0515f20b85cd9b3d18758843221b1328292a616e9514"}],"gaps":[{"predicate":"delivery_reliability_saidi","requires":"measured regulator outage record","state":"not_assessed","reason":"no regulator outage series compiled for this market yet","blocks_project_case":true},{"predicate":"local_deliverability","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"note":"A gap is not evidence that the risk is absent. It means we have not assessed it."}