{"market_id":"india","generated_at":"June 2026","schema_version":"1.0","claim_count":5,"claims":[{"claim_id":"pgiq:claim:india:pgiq_tier:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"india","geography_id":"pgiq:geo:india"},"predicate":"pgiq_tier","value":{"base":3,"label":"Workable"},"unit":null,"definition":"PGIQ tier for siting a large new electricity load; a directional screen, not a connection guarantee","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"n/a (opinion)","coverage":"all rated markets","model_uncertainty":"n/a","opinion_confidence":"Med"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"tier definitions","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Enormous demand and a fast build, on a grid that is still constrained and high-carbon. The pull is huge; the limits are connection access, firm supply, and carbon. A high-potential market on a clearly improving path.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:25551641a7cd81a5f70df5de9d253838a8d37581a48aecfe086637708b375cd7"},{"claim_id":"pgiq:claim:india:recurring_power_cost:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"india","geography_id":"pgiq:geo:india"},"predicate":"recurring_power_cost","value":{"low":75,"base":100,"high":125},"unit":"USD/MWh","definition":"recurring energy, network, delivery, taxes and levies per MWh; EXCLUDES customer-funded connection capital","project_archetype":"100mw_flat_95pct_lf_transmission_level","as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"modelled","coverage":"3 public fragments","model_uncertainty":"band spans structuring outcomes","opinion_confidence":"n/a"},"sources":[{"publisher":"IEEFA: India's data-centre sector at a crossroads","title":"IEEFA: India's data-centre sector at a crossroads","url":"https://ieefa.org/resources/indias-power-hungry-data-centre-sector-crossroads","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"India electricity price (Intratec)","title":"India electricity price (Intratec)","url":"https://www.intratec.us/solutions/energy-prices-markets/commodity/electricity-price-india","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"India among lowest data-centre costs (IBEF)","title":"India among lowest data-centre costs (IBEF)","url":"https://www.ibef.org/news/india-among-top-data-centre-markets-mumbai-costs-among-lowest-globally","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"IEEFA: India's data-centre sector at a crossroads","title":"IEEFA: India's data-centre sector at a crossroads","url":"https://ieefa.org/resources/indias-power-hungry-data-centre-sector-crossroads","published_at":null,"retrieved_at":"June 2026","locator":"price components","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(components)","model_version":"pgiq-rating-v2","inputs":[{"component":"Energy (DISCOM or open-access PPA)","usd_per_mwh":70},{"component":"Wheeling & transmission","usd_per_mwh":20},{"component":"Cross-subsidy surcharge & duties","usd_per_mwh":10}]},"contradictions":[],"supersedes":null,"note":"A DISCOM industrial supply runs about 10 to 12 rupees per kWh with a cross-subsidy surcharge on top, while open-access renewable PPAs land lower at about 5 to 7 rupees all-in; the band spans both routes.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:9c1a3120261fe3ccb08760b0a2d7a7349607a3b77223d71c0c40ac1afb22461d"},{"claim_id":"pgiq:claim:india:connection_wait:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"india","geography_id":"pgiq:geo:india"},"predicate":"connection_wait","value":{"low":24,"base":36,"high":48},"unit":"months","definition":"from a complete application being accepted to full firm energization of the nominated MW, expressed as a band. Initial, phased, temporary and conditional energization are separate, earlier milestones. Derived from the operator process and market evidence rather than a measured project cohort.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":"proxy","confidence":{"source_quality":"Med","coverage":"band, not a measured cohort","model_uncertainty":"stage durations overlap and vary by project","opinion_confidence":"n/a"},"sources":[{"publisher":"IEEFA: India's data-centre sector at a crossroads","title":"IEEFA: India's data-centre sector at a crossroads","url":"https://ieefa.org/resources/indias-power-hungry-data-centre-sector-crossroads","published_at":null,"retrieved_at":"June 2026","locator":"process stages","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(stage_durations)","model_version":"pgiq-rating-v2","inputs":[{"stage":"Application & DISCOM approval","months":6},{"stage":"Grid study & connection agreement","months":9},{"stage":"Network augmentation","months":12},{"stage":"Construction & energization","months":9}]},"contradictions":[],"supersedes":null,"note":"State DISCOM connection plus the option of open-access renewables; the draft data-centre policy adds single-window clearances.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:1a0e229944162abad66a2ffe77b6f24a395cc4ec8d3d098de1134a11df5ff955"},{"claim_id":"pgiq:claim:india:forward_adequacy:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"india","geography_id":"pgiq:geo:india"},"predicate":"forward_adequacy","value":{"base":"none","label":"No adequacy flags"},"unit":null,"definition":"forward firm-supply adequacy for a prospective large new load; level vocabulary none|watch|elevated|severe","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"modelled read","coverage":"market-level","model_uncertainty":"not site-specific","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"reliability overlay","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:643529acab63973788f0782cd5088803972e73bd23234f5fda22b2511101855b"},{"claim_id":"pgiq:claim:india:average_operational_carbon_intensity:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"india","geography_id":"pgiq:geo:india"},"predicate":"average_operational_carbon_intensity","value":{"base":710},"unit":"gCO2eq/kWh","definition":"Estimated average operational grid emissions intensity in gCO2e per kWh, for a declared geography, period and system boundary, using direct operational emission factors. The generation-versus-consumption basis, imports, delivery losses, temporal granularity, factor set, factor vintage and uncertainty are disclosed or marked unknown. Permitted for location-based grid comparison only. It is not a marginal-emissions estimate, a lifecycle assessment, a procurement claim, or by itself a market-based Scope 2 result.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"stated generation mix","coverage":"market-level annual average","model_uncertainty":"average, not marginal or lifecycle","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"carbon basis","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Average operational intensity from the stated generation mix. Not marginal, lifecycle or market-based Scope 2.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:14f12d2a0f6fed7de4c64bed1d9c6a2e92df9eaf11f2d0431ab981c303074b56"}],"gaps":[{"predicate":"delivery_reliability_saidi","requires":"measured regulator outage record","state":"not_assessed","reason":"no regulator outage series compiled for this market yet","blocks_project_case":true},{"predicate":"regulatory_momentum","requires":"direction and steadiness of connection rules","state":"not_assessed","reason":"no dated regulatory read compiled for this market yet","blocks_project_case":false},{"predicate":"local_deliverability","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"note":"A gap is not evidence that the risk is absent. It means we have not assessed it."}