{"market_id":"isone","generated_at":"June 2026","gap_count":2,"gaps":[{"predicate":"recurring_power_cost","question":"What would a 100 MW load at a 95% load factor, on high-voltage service, pay per MWh all in, under the tariff it would actually be served on?","requires":"recurring cost for the declared archetype","state":"not_assessed","reason":"no compiled cost band for this market yet (check administered_large_user_tariff: where a regulated tariff exists it is the price actually paid)","blocks_project_case":true},{"predicate":"local_deliverability","question":"What firm capacity is available at the substation we would connect to, and when?","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"report_url":"https://powergridiq.com/rating/isone#questions","note":"Each gap is a decision point PowerGridIQ has not assessed for this market, with a question to put to the utility, network operator or regulator. A gap is not evidence that the risk is absent."}