{"market_id":"japan-west","generated_at":"June 2026","schema_version":"1.0","claim_count":6,"claims":[{"claim_id":"pgiq:claim:japan-west:pgiq_tier:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"japan-west","geography_id":"pgiq:geo:japan-west"},"predicate":"pgiq_tier","value":{"base":3,"label":"Workable"},"unit":null,"definition":"PGIQ tier for siting a large new electricity load; a directional screen, not a connection guarantee","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"n/a (opinion)","coverage":"all rated markets","model_uncertainty":"n/a","opinion_confidence":"Med"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"tier definitions","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"The 60Hz western grid (Kansai/KEPCO and Chubu) is the more comfortable half: restarted nuclear provides firm, cleaner baseload, so much so that Kansai now curtails surplus renewables. Osaka is a real and growing hub.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:9fb02477b479e5115d861d3436dfbcf7d7fc92d667205c9c98fa25599668be12"},{"claim_id":"pgiq:claim:japan-west:recurring_power_cost:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"japan-west","geography_id":"pgiq:geo:japan-west"},"predicate":"recurring_power_cost","value":{"low":125,"base":150,"high":175},"unit":"USD/MWh","definition":"recurring energy, network, delivery, taxes and levies per MWh; EXCLUDES customer-funded connection capital","project_archetype":"100mw_flat_95pct_lf_transmission_level","as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"modelled","coverage":"2 public fragments","model_uncertainty":"band spans structuring outcomes","opinion_confidence":"n/a"},"sources":[{"publisher":"Japan business electricity price (GlobalPetrolPrices)","title":"Japan business electricity price (GlobalPetrolPrices)","url":"https://www.globalpetrolprices.com/Japan/electricity_prices/","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"KEPCO (Kansai Electric Power)","title":"KEPCO (Kansai Electric Power)","url":"https://www.kepco.co.jp/english/","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"Japan business electricity price (GlobalPetrolPrices, Dec 2025)","title":"Japan business electricity price (GlobalPetrolPrices, Dec 2025)","url":"https://www.globalpetrolprices.com/Japan/electricity_prices/","published_at":null,"retrieved_at":"June 2026","locator":"price components","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(components)","model_version":"pgiq-rating-v2","inputs":[{"component":"Generation (nuclear + LNG)","usd_per_mwh":105},{"component":"Transmission & distribution","usd_per_mwh":30},{"component":"Fuel-cost adjustment & renewable levy","usd_per_mwh":15}]},"contradictions":[],"supersedes":null,"note":"The 60Hz west runs more nuclear than Tokyo, so delivered power is a little cheaper than the eastern grid, but Japan's overall reliance on imported LNG keeps it well above US and Nordic levels.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:dea30b06525f5165511410e49cb7204dc31a7968e4db93294299e7c192be2714"},{"claim_id":"pgiq:claim:japan-west:connection_wait:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"japan-west","geography_id":"pgiq:geo:japan-west"},"predicate":"connection_wait","value":{"low":48,"base":72,"high":96},"unit":"months","definition":"from a complete application being accepted to full firm energization of the nominated MW, expressed as a band. Initial, phased, temporary and conditional energization are separate, earlier milestones. Derived from the operator process and market evidence rather than a measured project cohort.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":"proxy","confidence":{"source_quality":"Med","coverage":"band, not a measured cohort","model_uncertainty":"stage durations overlap and vary by project","opinion_confidence":"n/a"},"sources":[{"publisher":"Nikkei: Japan utilities invest in grid for data centres","title":"Nikkei: Japan utilities invest in grid for data centres","url":"https://asia.nikkei.com/business/energy/japan-s-utilities-pour-billions-into-power-grid-amid-data-center-growth","published_at":null,"retrieved_at":"June 2026","locator":"process stages","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(stage_durations)","model_version":"pgiq-rating-v2","inputs":[{"stage":"Application & capacity study","months":10},{"stage":"Grid connection study & offer","months":14},{"stage":"Substation & network reinforcement","months":30},{"stage":"Construction & energization","months":18}]},"contradictions":[],"supersedes":null,"note":"Kansai's 60Hz grid is less tight than Tokyo, but Osaka-area substation build still gates large connections.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:ecc8223e071db963408e94ee8ef78526ba750709e30472022448203fbde49fb7"},{"claim_id":"pgiq:claim:japan-west:delivery_reliability_saidi:june-2026","claim_type":"fact","status":"active","subject":{"market_id":"japan-west","geography_id":"pgiq:geo:japan-west"},"predicate":"delivery_reliability_saidi","value":{"base":24},"unit":"minutes per customer per year","definition":"regulator outage measure (SAIDI or stated equivalent) for the distribution network;","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"measured","method_source_label":null,"confidence":{"source_quality":"regulator filing","coverage":"year FY2024","model_uncertainty":"n/a","opinion_confidence":"n/a"},"sources":[{"publisher":"Japan OCCTO quality of supply","title":"Japan OCCTO quality of supply","url":"https://www.occto.or.jp","published_at":"FY2024","retrieved_at":"June 2026","locator":"reliability summary","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:9072629cfbcf93664b569b4185eb254a01a43a5a3d2db94bdbd11b0e132f6cd4"},{"claim_id":"pgiq:claim:japan-west:forward_adequacy:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"japan-west","geography_id":"pgiq:geo:japan-west"},"predicate":"forward_adequacy","value":{"base":"none","label":"No adequacy flags"},"unit":null,"definition":"forward firm-supply adequacy for a prospective large new load; level vocabulary none|watch|elevated|severe","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"modelled read","coverage":"market-level","model_uncertainty":"not site-specific","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"reliability overlay","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:978925b65091a57ae3c177a58fd524093a8df10dade0ef63e969f46708121b41"},{"claim_id":"pgiq:claim:japan-west:average_operational_carbon_intensity:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"japan-west","geography_id":"pgiq:geo:japan-west"},"predicate":"average_operational_carbon_intensity","value":{"base":340},"unit":"gCO2eq/kWh","definition":"Estimated average operational grid emissions intensity in gCO2e per kWh, for a declared geography, period and system boundary, using direct operational emission factors. The generation-versus-consumption basis, imports, delivery losses, temporal granularity, factor set, factor vintage and uncertainty are disclosed or marked unknown. Permitted for location-based grid comparison only. It is not a marginal-emissions estimate, a lifecycle assessment, a procurement claim, or by itself a market-based Scope 2 result.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"stated generation mix","coverage":"market-level annual average","model_uncertainty":"average, not marginal or lifecycle","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"carbon basis","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Average operational intensity from the stated generation mix. Not marginal, lifecycle or market-based Scope 2.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:1f815649639326345b58fd6e13ec72b3483f5c86f6c874bb2af4fe63bccdd731"}],"gaps":[{"predicate":"regulatory_momentum","requires":"direction and steadiness of connection rules","state":"not_assessed","reason":"no dated regulatory read compiled for this market yet","blocks_project_case":false},{"predicate":"local_deliverability","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"note":"A gap is not evidence that the risk is absent. It means we have not assessed it."}