{"market_id":"japan-west","generated_at":"June 2026","gap_count":2,"gaps":[{"predicate":"regulatory_momentum","question":"Are the connection rules for large loads changing? What has been proposed or decided, and when does it take effect?","requires":"direction and steadiness of connection rules","state":"not_assessed","reason":"no dated regulatory read compiled for this market yet","blocks_project_case":false},{"predicate":"local_deliverability","question":"What firm capacity is available at the substation we would connect to, and when?","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"report_url":"https://powergridiq.com/rating/japan-west#questions","note":"Each gap is a decision point PowerGridIQ has not assessed for this market, with a question to put to the utility, network operator or regulator. A gap is not evidence that the risk is absent."}