{"market_id":"spp","generated_at":"June 2026","gap_count":1,"gaps":[{"predicate":"local_deliverability","question":"What firm capacity is available at the substation we would connect to, and when?","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"report_url":"https://powergridiq.com/rating/spp#questions","note":"Each gap is a decision point PowerGridIQ has not assessed for this market, with a question to put to the utility, network operator or regulator. A gap is not evidence that the risk is absent."}