{"market_id":"sweden-south","generated_at":"June 2026","schema_version":"1.0","claim_count":5,"claims":[{"claim_id":"pgiq:claim:sweden-south:pgiq_tier:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"sweden-south","geography_id":"pgiq:geo:sweden-south"},"predicate":"pgiq_tier","value":{"base":3,"label":"Workable"},"unit":null,"definition":"PGIQ tier for siting a large new electricity load; a directional screen, not a connection guarantee","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"n/a (opinion)","coverage":"all rated markets","model_uncertainty":"n/a","opinion_confidence":"High"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"tier definitions","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Southern Sweden (SE4) is the mirror image of the north: a power deficit that imports from Denmark, Germany and Poland at prices two to four times the northern zone, behind a limited north-south trunk grid.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:a814abc917a2ea9606736ab0d6f6a48565be7ecbf49ecdec3f127fd2b5536d56"},{"claim_id":"pgiq:claim:sweden-south:recurring_power_cost:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"sweden-south","geography_id":"pgiq:geo:sweden-south"},"predicate":"recurring_power_cost","value":{"low":70,"base":90,"high":115},"unit":"USD/MWh","definition":"recurring energy, network, delivery, taxes and levies per MWh; EXCLUDES customer-funded connection capital","project_archetype":"100mw_flat_95pct_lf_transmission_level","as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"modelled","coverage":"2 public fragments","model_uncertainty":"band spans structuring outcomes","opinion_confidence":"n/a"},"sources":[{"publisher":"SE4 southern Sweden electricity prices (statsskuld)","title":"SE4 southern Sweden electricity prices (statsskuld)","url":"https://statsskuld.se/en/elpris/se4/","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"Non-household electricity prices (Eurostat)","title":"Non-household electricity prices (Eurostat)","url":"https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"SE4 southern Sweden electricity prices (statsskuld)","title":"SE4 southern Sweden electricity prices (statsskuld)","url":"https://statsskuld.se/en/elpris/se4/","published_at":null,"retrieved_at":"June 2026","locator":"price components","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(components)","model_version":"pgiq-rating-v2","inputs":[{"component":"Energy (SE4, continental-linked)","usd_per_mwh":65},{"component":"Network & grid fees","usd_per_mwh":18},{"component":"Taxes & levies","usd_per_mwh":7}]},"contradictions":[],"supersedes":null,"note":"SE4 (Malmo and Skane) is import-dependent and coupled to Germany and Poland via undersea links, so its energy runs well above the northern SE1/SE2 zones, often two to four times higher.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:1987b270cc39da231cb944d770bd649e89253ddaf0c2c7d12c2c2addb420ce90"},{"claim_id":"pgiq:claim:sweden-south:connection_wait:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"sweden-south","geography_id":"pgiq:geo:sweden-south"},"predicate":"connection_wait","value":{"low":24,"base":36,"high":48},"unit":"months","definition":"from a complete application being accepted to full firm energization of the nominated MW, expressed as a band. Initial, phased, temporary and conditional energization are separate, earlier milestones. Derived from the operator process and market evidence rather than a measured project cohort.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":"proxy","confidence":{"source_quality":"Med","coverage":"band, not a measured cohort","model_uncertainty":"stage durations overlap and vary by project","opinion_confidence":"n/a"},"sources":[{"publisher":"Argus: Nordic data centres and power demand","title":"Argus: Nordic data centres and power demand","url":"https://www.argusmedia.com/en/news-and-insights/latest-market-news/2806298-nordic-data-centres-to-support-power-demand-growth","published_at":null,"retrieved_at":"June 2026","locator":"process stages","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(stage_durations)","model_version":"pgiq-rating-v2","inputs":[{"stage":"Application & site","months":5},{"stage":"Grid study & connection offer","months":10},{"stage":"Agreement & works planning","months":9},{"stage":"Construction & energization","months":12}]},"contradictions":[],"supersedes":null,"note":"The import-dependent south is materially tighter than the surplus north.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:552c1320795c79c0dc3de4904283b0f0d3d5cee246a85d3b621cd5c228a2fd08"},{"claim_id":"pgiq:claim:sweden-south:forward_adequacy:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"sweden-south","geography_id":"pgiq:geo:sweden-south"},"predicate":"forward_adequacy","value":{"base":"watch","label":"Adequacy flagged"},"unit":null,"definition":"forward firm-supply adequacy for a prospective large new load; level vocabulary none|watch|elevated|severe","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"forward","method_source_label":"assessed","confidence":{"source_quality":"modelled read","coverage":"market-level","model_uncertainty":"not site-specific","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"reliability overlay","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"SE4 runs a structural deficit and imports at 2-4x the northern price; adequacy improves only as transmission and planned southern nuclear (2030s) arrive.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:3d34f9b3d3f01ae851886d982fe19cb6c10df67aa18521c3f4cd0205c4d01ab0"},{"claim_id":"pgiq:claim:sweden-south:average_operational_carbon_intensity:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"sweden-south","geography_id":"pgiq:geo:sweden-south"},"predicate":"average_operational_carbon_intensity","value":{"base":40},"unit":"gCO2eq/kWh","definition":"Estimated average operational grid emissions intensity in gCO2e per kWh, for a declared geography, period and system boundary, using direct operational emission factors. The generation-versus-consumption basis, imports, delivery losses, temporal granularity, factor set, factor vintage and uncertainty are disclosed or marked unknown. Permitted for location-based grid comparison only. It is not a marginal-emissions estimate, a lifecycle assessment, a procurement claim, or by itself a market-based Scope 2 result.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"stated generation mix","coverage":"market-level annual average","model_uncertainty":"average, not marginal or lifecycle","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"carbon basis","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Average operational intensity from the stated generation mix. Not marginal, lifecycle or market-based Scope 2.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:30a5700ac358add1dd07f74e2f0128a21ea3935d04a0367926de81c18c36d454"}],"gaps":[{"predicate":"delivery_reliability_saidi","requires":"measured regulator outage record","state":"not_assessed","reason":"no regulator outage series compiled for this market yet","blocks_project_case":true},{"predicate":"regulatory_momentum","requires":"direction and steadiness of connection rules","state":"not_assessed","reason":"no dated regulatory read compiled for this market yet","blocks_project_case":false},{"predicate":"local_deliverability","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"note":"A gap is not evidence that the risk is absent. It means we have not assessed it."}