{"market_id":"taiwan","generated_at":"June 2026","schema_version":"1.0","claim_count":6,"claims":[{"claim_id":"pgiq:claim:taiwan:pgiq_tier:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"taiwan","geography_id":"pgiq:geo:taiwan"},"predicate":"pgiq_tier","value":{"base":4,"label":"Constrained"},"unit":null,"definition":"PGIQ tier for siting a large new electricity load; a directional screen, not a connection guarantee","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"n/a (opinion)","coverage":"all rated markets","model_uncertainty":"n/a","opinion_confidence":"Med"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"tier definitions","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"A tight grid with TSMC as priority load, expensive power and limited room for new hyperscale.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:938ee715f119471df68b12521766cdfba24ecc987605627cefa8c61900d2a660"},{"claim_id":"pgiq:claim:taiwan:recurring_power_cost:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"taiwan","geography_id":"pgiq:geo:taiwan"},"predicate":"recurring_power_cost","value":{"low":128,"base":133,"high":140},"unit":"USD/MWh","definition":"recurring energy, network, delivery, taxes and levies per MWh; EXCLUDES customer-funded connection capital","project_archetype":"100mw_flat_95pct_lf_transmission_level","as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"tariff","method_source_label":null,"confidence":{"source_quality":"administered","coverage":"1 public fragments","model_uncertainty":"band spans structuring outcomes","opinion_confidence":"n/a"},"sources":[{"publisher":"Taipower industrial rate (Taipei Times)","title":"Taipower industrial rate (Taipei Times)","url":"https://www.taipeitimes.com/News/front/archives/2026/03/28/2003854601","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"},{"publisher":"Taipower industrial rate (Taipei Times)","title":"Taipower industrial rate (Taipei Times)","url":"https://www.taipeitimes.com/News/front/archives/2026/03/28/2003854601","published_at":null,"retrieved_at":"June 2026","locator":"price components","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:b9bf0369cc891b320a92f94f73734829ec6535a4fa5c5bf4651c9ed33a755e53"},{"claim_id":"pgiq:claim:taiwan:connection_wait:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"taiwan","geography_id":"pgiq:geo:taiwan"},"predicate":"connection_wait","value":{"low":36,"base":54,"high":60},"unit":"months","definition":"from a complete application being accepted to full firm energization of the nominated MW, expressed as a band. Initial, phased, temporary and conditional energization are separate, earlier milestones. Derived from the operator process and market evidence rather than a measured project cohort.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":"proxy","confidence":{"source_quality":"Med","coverage":"band, not a measured cohort","model_uncertainty":"stage durations overlap and vary by project","opinion_confidence":"n/a"},"sources":[{"publisher":"CAPRI: the energy paradox of Taiwan's AI ambition","title":"CAPRI: the energy paradox of Taiwan's AI ambition","url":"https://caprifoundation.org/the-energy-paradox-of-taiwans-sovereign-ai-ambition/","published_at":null,"retrieved_at":"June 2026","locator":"process stages","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":{"formula":"sum(stage_durations)","model_version":"pgiq-rating-v2","inputs":[{"stage":"Application & Taipower review","months":12},{"stage":"Grid study & connection offer","months":12},{"stage":"Substation & network reinforcement (161 kV)","months":18},{"stage":"Construction & energization","months":12}]},"contradictions":[],"supersedes":null,"note":"Taipower has paused new 5 MW-plus connections north of Taoyuan; grid interconnection runs 3 to 5 years.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:2101661b7f0962c3756d13dc5f312757f83d564f2b71ca6fcecf725fb6b795c1"},{"claim_id":"pgiq:claim:taiwan:administered_large_user_tariff:june-2026","claim_type":"fact","status":"active","subject":{"market_id":"taiwan","geography_id":"pgiq:geo:taiwan"},"predicate":"administered_large_user_tariff","value":{"base":133,"native":"NT$4.27 per kWh"},"unit":"USD/MWh","definition":"regulated large-user industrial tariff, the price a large load actually pays where no competitive wholesale market exists. A published rate, not an all-in build-up: it may exclude network or delivery components billed separately.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"measured","method_source_label":null,"confidence":{"source_quality":"regulator or utility tariff sheet","coverage":"year 2025/26","model_uncertainty":"rate, not a modelled band","opinion_confidence":"n/a"},"sources":[{"publisher":"Taipower industrial rate (Taipei Times)","title":"Taipower industrial rate (Taipei Times)","url":"https://www.taipeitimes.com/News/front/archives/2026/03/28/2003854601","published_at":"2025/26","retrieved_at":"June 2026","locator":"tariff schedule","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Taiwan's power comes from state utility Taipower at an administered industrial rate of NT$4.27 per kWh (about 13 US cents), frozen through March 2026. There is no wholesale market; the tariff is what a large load pays, and the state is absorbing fuel-cost pressure for now.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:bf691e5c18638788b6b8e93460d2932c0152700555f6a9c7aad805aef8e74cb7"},{"claim_id":"pgiq:claim:taiwan:forward_adequacy:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"taiwan","geography_id":"pgiq:geo:taiwan"},"predicate":"forward_adequacy","value":{"base":"none","label":"No adequacy flags"},"unit":null,"definition":"forward firm-supply adequacy for a prospective large new load; level vocabulary none|watch|elevated|severe","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"modelled read","coverage":"market-level","model_uncertainty":"not site-specific","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"reliability overlay","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:4f45879c69d6dbfe31f4f3c92b5e302c195acb01895ad4e1130fb00328424512"},{"claim_id":"pgiq:claim:taiwan:average_operational_carbon_intensity:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"taiwan","geography_id":"pgiq:geo:taiwan"},"predicate":"average_operational_carbon_intensity","value":{"base":570},"unit":"gCO2eq/kWh","definition":"Estimated average operational grid emissions intensity in gCO2e per kWh, for a declared geography, period and system boundary, using direct operational emission factors. The generation-versus-consumption basis, imports, delivery losses, temporal granularity, factor set, factor vintage and uncertainty are disclosed or marked unknown. Permitted for location-based grid comparison only. It is not a marginal-emissions estimate, a lifecycle assessment, a procurement claim, or by itself a market-based Scope 2 result.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"stated generation mix","coverage":"market-level annual average","model_uncertainty":"average, not marginal or lifecycle","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"carbon basis","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Average operational intensity from the stated generation mix. Not marginal, lifecycle or market-based Scope 2.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:bde06c666892b598c2af4bea20a70dc5cb657216767d562b89b3658f4a5d086d"}],"gaps":[{"predicate":"delivery_reliability_saidi","requires":"measured regulator outage record","state":"not_assessed","reason":"no regulator outage series compiled for this market yet","blocks_project_case":true},{"predicate":"regulatory_momentum","requires":"direction and steadiness of connection rules","state":"not_assessed","reason":"no dated regulatory read compiled for this market yet","blocks_project_case":false},{"predicate":"local_deliverability","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"note":"A gap is not evidence that the risk is absent. It means we have not assessed it."}