{"market_id":"turkey","generated_at":"June 2026","gap_count":5,"gaps":[{"predicate":"recurring_power_cost","question":"What would a 100 MW load at a 95% load factor, on high-voltage service, pay per MWh all in, under the tariff it would actually be served on?","requires":"recurring cost for the declared archetype","state":"not_assessed","reason":"no compiled cost band for this market yet (check administered_large_user_tariff: where a regulated tariff exists it is the price actually paid)","blocks_project_case":true},{"predicate":"connection_wait","question":"How long is it from a complete application being accepted to full firm energization of the MW we need, and which milestones (initial, phased, temporary or conditional energization) would come first?","requires":"time from a complete application being accepted to full firm energization of the nominated MW; initial, phased, temporary and conditional energization are separate milestones","state":"not_assessed","reason":"no countable queue or operator-published process for this market","blocks_project_case":true},{"predicate":"delivery_reliability_saidi","question":"What is the measured outage record (SAIDI) for the network that would serve our site, as filed with the regulator, and for which years?","requires":"measured regulator outage record","state":"not_assessed","reason":"no regulator outage series compiled for this market yet","blocks_project_case":true},{"predicate":"regulatory_momentum","question":"Are the connection rules for large loads changing? What has been proposed or decided, and when does it take effect?","requires":"direction and steadiness of connection rules","state":"not_assessed","reason":"no dated regulatory read compiled for this market yet","blocks_project_case":false},{"predicate":"local_deliverability","question":"What firm capacity is available at the substation we would connect to, and when?","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"report_url":"https://powergridiq.com/rating/turkey#questions","note":"Each gap is a decision point PowerGridIQ has not assessed for this market, with a question to put to the utility, network operator or regulator. A gap is not evidence that the risk is absent."}