{"market_id":"us-southeast","generated_at":"June 2026","schema_version":"1.0","claim_count":8,"claims":[{"claim_id":"pgiq:claim:us-southeast:pgiq_tier:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"us-southeast","geography_id":"pgiq:geo:us-southeast"},"predicate":"pgiq_tier","value":{"base":2,"label":"Strong"},"unit":null,"definition":"PGIQ tier for siting a large new electricity load; a directional screen, not a connection guarantee","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"n/a (opinion)","coverage":"all rated markets","model_uncertainty":"n/a","opinion_confidence":"Med"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"tier definitions","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"A top-three North American market that is building fast and cheaper than the coasts. Atlanta has around two gigawatts under construction, Southern Company is adding gas and solar, and access is workable. Strong and on an improving path.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:21d860b139a17b3e6960cd5d6a2ba1fd74f835f1c884ad494a578afe4ff2d368"},{"claim_id":"pgiq:claim:us-southeast:generation_storage_queue_depth:june-2026","claim_type":"fact","status":"active","subject":{"market_id":"us-southeast","geography_id":"pgiq:geo:us-southeast"},"predicate":"generation_storage_queue_depth","value":{"base":153},"unit":"GW","definition":"capacity in the generation and storage queue, population \"active\"","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"measured","method_source_label":null,"confidence":{"source_quality":"Med","coverage":"operator-published total","model_uncertainty":"n/a","opinion_confidence":"n/a"},"sources":[{"publisher":"LBNL Queued Up 2026","title":"LBNL Queued Up 2026","url":"https://emp.lbl.gov/queues","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"About 153 GW active across the non-ISO Southeast at end-2025 (LBNL Queued Up 2026). Vertically integrated utility interconnection typically processes faster than the FERC-jurisdictional ISOs, with growing data-center interest.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:c4a9f3e0c2e936764aa0de1862d86b036a73a889d1b0c112c8b92b4862ab81fc"},{"claim_id":"pgiq:claim:us-southeast:connection_wait:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"us-southeast","geography_id":"pgiq:geo:us-southeast"},"predicate":"connection_wait","value":{"base":50},"unit":"months","definition":"complete_application_accepted_to_full_firm_energization","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"measured","method_source_label":null,"confidence":{"source_quality":"Med","coverage":"typical case, not a quote","model_uncertainty":"stage durations overlap in practice","opinion_confidence":"n/a"},"sources":[{"publisher":"LBNL Queued Up 2026","title":"LBNL Queued Up 2026","url":"https://emp.lbl.gov/queues","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:6befda4242f6041a130e61ae079555e6e2d19af2175b5e97cb2360612814cb29"},{"claim_id":"pgiq:claim:us-southeast:queue_withdrawal_rate:june-2026","claim_type":"fact","status":"active","subject":{"market_id":"us-southeast","geography_id":"pgiq:geo:us-southeast"},"predicate":"queue_withdrawal_rate","value":{"base":75},"unit":"percent","definition":"share of capacity that left the generation and storage queue before connecting; this is NOT a load withdrawal rate unless queue_type is load","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"measured","method_source_label":null,"confidence":{"source_quality":"Med","coverage":"cohort-based","model_uncertainty":"cohort definition varies","opinion_confidence":"n/a"},"sources":[{"publisher":"LBNL Queued Up 2026","title":"LBNL Queued Up 2026","url":"https://emp.lbl.gov/queues","published_at":null,"retrieved_at":"June 2026","locator":"page","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:2f12bee8caa2c2d3f16ac07bd17938c215230c74dbdfcac7e5715ea12282985b"},{"claim_id":"pgiq:claim:us-southeast:delivery_reliability_saidi:june-2026","claim_type":"fact","status":"active","subject":{"market_id":"us-southeast","geography_id":"pgiq:geo:us-southeast"},"predicate":"delivery_reliability_saidi","value":{"base":114.26},"unit":"minutes per customer per year","definition":"regulator outage measure (SAIDI or stated equivalent) for the distribution network;","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"measured","method_source_label":null,"confidence":{"source_quality":"regulator filing","coverage":"year 2024","model_uncertainty":"n/a","opinion_confidence":"n/a"},"sources":[{"publisher":"EIA Form 861, Schedules 3B and 3C (annual electric power industry report) (IEEE 1366 major-event treatment, customer-weighted blend of 6 of 6 territories, 100% of customers, regional context only)","title":"EIA Form 861, Schedules 3B and 3C (annual electric power industry report) (IEEE 1366 major-event treatment, customer-weighted blend of 6 of 6 territories, 100% of customers, regional context only)","url":"https://www.eia.gov/electricity/data/eia861/","published_at":"2024","retrieved_at":"June 2026","locator":"reliability summary","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":null,"schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:d9e258c1c898c8774d35a0ff3503db0c92d9bbfae2e955c3dc14edf95339ec6a"},{"claim_id":"pgiq:claim:us-southeast:forward_adequacy:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"us-southeast","geography_id":"pgiq:geo:us-southeast"},"predicate":"forward_adequacy","value":{"base":"watch","label":"Adequacy flagged"},"unit":null,"definition":"forward firm-supply adequacy for a prospective large new load; level vocabulary none|watch|elevated|severe","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"modelled read","coverage":"market-level","model_uncertainty":"not site-specific","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"reliability overlay","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Winter generation adequacy under extreme cold is the main forward risk; largely vertically integrated utilities are adding capacity.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:084a9d5e5dfc4dc85ba4fe91e6da3b468a268c4bad3136af94a4e94cfb843bd8"},{"claim_id":"pgiq:claim:us-southeast:average_operational_carbon_intensity:june-2026","claim_type":"estimate","status":"active","subject":{"market_id":"us-southeast","geography_id":"pgiq:geo:us-southeast"},"predicate":"average_operational_carbon_intensity","value":{"base":280},"unit":"gCO2eq/kWh","definition":"Estimated average operational grid emissions intensity in gCO2e per kWh, for a declared geography, period and system boundary, using direct operational emission factors. The generation-versus-consumption basis, imports, delivery losses, temporal granularity, factor set, factor vintage and uncertainty are disclosed or marked unknown. Permitted for location-based grid comparison only. It is not a marginal-emissions estimate, a lifecycle assessment, a procurement claim, or by itself a market-based Scope 2 result.","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"modelled","method_source_label":null,"confidence":{"source_quality":"stated generation mix","coverage":"market-level annual average","model_uncertainty":"average, not marginal or lifecycle","opinion_confidence":"n/a"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"carbon basis","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Average operational intensity from the stated generation mix. Not marginal, lifecycle or market-based Scope 2.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:9fa17d6142a335dcce935fe5f85c0ff31063b0a2e94b414fa36e359054d037ff"},{"claim_id":"pgiq:claim:us-southeast:regulatory_momentum:june-2026","claim_type":"opinion","status":"active","subject":{"market_id":"us-southeast","geography_id":"pgiq:geo:us-southeast"},"predicate":"regulatory_momentum","value":{"base":"mixed","direction":"improving"},"unit":null,"definition":"direction and steadiness of the rules governing large-load connection (stroke-of-pen risk)","project_archetype":null,"as_of":"June 2026","valid_for":{"start":"June 2026","end":null},"method":"expert_judgment","method_source_label":null,"confidence":{"source_quality":"cited dated developments","coverage":"market-level","model_uncertainty":"n/a","opinion_confidence":"Med"},"sources":[{"publisher":"PGIQ methodology","title":"PGIQ methodology","url":"https://powergridiq.com/methodology","published_at":null,"retrieved_at":"June 2026","locator":"regulatory momentum","quote_or_field":null,"license":"public source, cited under fair use","redistribution_rights":"link and quote with attribution; no bulk redistribution"}],"transform":null,"contradictions":[],"supersedes":null,"note":"Georgia's PSC now requires any new load of 100 MW or more to sign a customized contract with financial guarantees, terms up to 15 years and minimum payments (in force since 1 February 2025), and in December 2025 approved roughly 10 GW of new generation, about 80 percent to serve data centres, with cost protections for residential customers. Access is managed and selective but genuinely open. WHAT WOULD CHANGE IT: The customized-contract regime and the April 2026 Customer Identified Resource programme delivering firm, predictable connection at scale.","schema_version":"1.0","methodology_version":"pgiq-rating-v2","definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","content_hash":"sha256:d6e17c5a6ce34906c544dcde3ee3829326d20ccf30a6758a02fd869ef1eafe6f"}],"gaps":[{"predicate":"recurring_power_cost","requires":"recurring cost for the declared archetype","state":"not_assessed","reason":"no compiled cost band for this market yet (check administered_large_user_tariff: where a regulated tariff exists it is the price actually paid)","blocks_project_case":true},{"predicate":"local_deliverability","requires":"capacity at the substation you would connect to","state":"not_assessed","reason":"no operator publication of area or substation capacity found for this market","blocks_project_case":true}],"note":"A gap is not evidence that the risk is absent. It means we have not assessed it."}