{"id":"austria","rid":"AT","name":"Austria","flag":"🇦🇹","group":"europe","type":"market","parent":null,"regions":null,"tier_range":null,"tier":3,"tier_name":"Workable","score":58,"pillar_score":58,"pillar_tier":3,"pillar_tier_name":"Workable","reliability":{"assessed":true,"level":"none","dock":0,"provisional":false,"confidence":"Low","delivery_transmission":{"level":"none","measure":"modelled","note":"Modelled read: hydro-rich, well interconnected and reliable."},"delivery_distribution":{"level":"none"},"forward_capacity":{"level":"none"},"read":"No reliability flags found","level_means":"reviewed; no reliability flags found in the record we examined"},"reliability_dock":0,"regulatory_momentum":null,"scheduled_changes":null,"queue":null,"friction":null,"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":null,"territory_count":0},"reliability_metrics":{"saidi_min":37.72,"saidi_year":"2022","forward_adequacy":null,"measure":"historical utility-territory delivery performance","standard":null,"standard_note":null,"evidence_role":"market_context","by_serving_utility":[],"evidence_role_basis":"E-Control national average across Austrian DSOs"},"forward_cost":null,"tariff":null,"realized_cost":null,"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":null,"partial_cost_verified":null,"cost_pillar_calculation":null,"evidence":{"source_reliability":"High","coverage":"Partial","coverage_dimensions":1,"last_reviewed":"June 2026","measured_layers":1,"data_layers":1,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability","method":"measured","vintage":"2022","freshness":"Aging","source_url":"https://www.ceer.eu/wp-content/uploads/2024/11/E-Control-annual-activity-report-2024.pdf"}]},"outlook":"Stable","confidence":"Med","under_review":false,"thesis":"Clean (hydro-led) and stable, but mid-scale and mid-cost; workable rather than a magnet.","pillars":{"access":58,"availability":58,"cost":64,"momentum":35,"carbon":88},"pillar_rationale":{"access":"Workable access.","availability":"Moderate availability (hydro-led).","cost":"Mid-range cost.","momentum":"Limited momentum.","carbon":"Clean (~90 g), hydro."},"offtake_opportunity_index":60,"demand_hunger":33,"build_feasibility":58,"supplier_signals":{"bess_arbitrage_usd_mwh":37,"bess_arbitrage_pct":60,"solar_capture_pct":93,"wind_capture_pct":101},"outlook_drivers":{"upgrade":["Hydro-backed clean supply attracts firm tenants.","Regional interconnection helps."],"downgrade":["Mid cost and scale.","Limited ecosystem."]},"risks":["Scale and ecosystem.","Cost."],"peers":{"like":"Switzerland (clean, small, mid-cost)","ahead":"on carbon","behind":"on scale"},"sources":[{"label":"ENTSO-E","url":"https://www.entsoe.eu/"}],"latest_action":{"date":"June 2026","type":"New rating","note":"New rating: Tier 3 Workable assigned.","trigger":null},"grid":{"price_usd_mwh":62,"carbon_intensity_g":85,"renewable_pct":87,"renewable_generation_share_pct":87,"low_carbon_generation_share_pct":87,"fuel_mix":{"hydro":62,"wind":10,"solar":8,"gas":12,"biofuel":7,"coal":1},"demand_mw":6500,"capacity_mw":15000,"imports_mw":3000,"exports_mw":2000,"firm_capacity_mw":null,"firm_capacity_availability":"insufficient_evidence","firm_capacity_basis":null,"est_peak_mw":9230,"firm_headroom_mw":null,"firm_headroom_availability":"dependency_unavailable","peak_stress_pct":null,"peak_stress_availability":"dependency_unavailable","adequacy_required_input":"capacity_mix_mw with a declared basis, or an official dependable or accredited capacity from the operator","price_cycle":"hydro","price_basis":"not_reviewed","price_absent_reason":null,"price_source":"modelled-baseline","price_as_of":null,"price_vintage":"undated_modelled_baseline","price_is_live":false,"carbon_intensity_unit":"gCO2eq/kWh","carbon_measurement_boundary":"operational_combustion","carbon_calculation_method":"structural_estimate","carbon_emission_factor_source":null,"carbon_basis_withdrawn":true,"carbon_imports_treatment":"not_accounted","carbon_provenance_state":"structural","carbon_decision_eligibility":"insufficient_evidence","carbon_confidence":"low","source":"modelled-baseline"},"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"not_assessed","overall_permits":"Not assessed. Treat as an open diligence item; absence of a finding is not evidence of low risk.","insufficient_evidence":true,"unassessed_required_fields":["cost","connection"],"project_ready":false,"blocking_fields":["cost","connection","reliability"],"fields":{"cost":"not_assessed","connection":"not_assessed","reliability":"M2 Compiled","carbon":"M2 Compiled","regulatory":"not_assessed","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","carbon"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: cost, connection, local capacity"}},"reliability_layers":{"bulk_historical":{"state":"held","method":"modelled"},"forward_adequacy":{"state":"unknown","method":null},"local_delivery":{"state":"held","method":"measured"},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2027-07-15","report_url":"https://powergridiq.com/rating/austria","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"insufficient_evidence","label":"Insufficient evidence","means":"No band is published because the available evidence does not support one.","reproducible":false},"component":null,"cost_pillar":{"state":"analyst_assessment","label":"Analyst assessment","means":"The score is a judgement recorded with a written cost-specific rationale. It is not calculated from a formula and does not claim to be.","reproducible":false},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."}}