{"id":"finland","rid":"FI","name":"Finland","flag":"🇫🇮","group":"europe","type":"market","parent":null,"regions":null,"tier_range":null,"tier":2,"tier_name":"Strong","score":69,"pillar_score":69,"pillar_tier":2,"pillar_tier_name":"Strong","reliability":{"assessed":true,"level":"none","dock":0,"provisional":false,"confidence":"Med-High","delivery_transmission":{"level":"none","measure":"measured","note":"Since Olkiluoto 3 (about 1.6 GW) reached regular output in 2023, national resource-adequacy assessments show no concern against the reliability standard (LOLE 2.1 hours/year), and OL3's early-years reliability was high in international comparison.","sources":[{"label":"Finnish EPR starts supplying electricity (WNN)","url":"https://world-nuclear-news.org/Articles/Finnish-EPR-starts-supplying-electricity"}]},"delivery_distribution":{"level":"none"},"forward_capacity":{"level":"none"},"read":"No reliability flags found","level_means":"reviewed; no reliability flags found in the record we examined"},"reliability_dock":0,"regulatory_momentum":{"level":"mixed","direction":"worsening","why":"From 1 July 2026 Finland moves data-centre electricity from the lower tax category II to the general category I, raising the power tax by about 2.19 cents per kWh, and Fingrid is restricting new connections in some areas until 2027 while it consults on the KJV2026 demand-connection code (draft 12 June 2026). A replacement incentive for value-added data centres is due in autumn 2026.","what_would_change_it":"The autumn 2026 incentive scheme and Fingrid's capacity build offsetting the tax rise for large, heat-integrated loads.","scope":"The regulatory and permitting environment for connecting a new large load. An opinion on a dated record, not a measurement.","vocabulary_version":"regulatory-momentum-1.0","beyond_the_grid":{"text":"Finland leads on turning data-centre waste heat into district heating: Fortum captures heat from large Espoo-area sites to supply about 40 percent of its regional demand, a real offset to siting friction.","sources":[{"label":"AFRY","url":"https://afry.com/en/project/capturing-data-center-waste-heat-fortums-district-heating-in-finland"}]}},"scheduled_changes":null,"queue":null,"friction":{"level":"Low","wait":"1-3 years","measure":"proxy","has_detail":true},"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":"triangulated","territory_count":0},"reliability_metrics":null,"forward_cost":null,"tariff":null,"realized_cost":{"low_usd_per_mwh":42,"mid_usd_per_mwh":58,"high_usd_per_mwh":78,"aggregation":"band","estimate_usd_per_mwh":null,"estimate_kind_note":null,"total_derivation":"compiled_band_allocated_across_categories","total_derivation_note":"The band is the compiled result and the component lines apportion its midpoint, which is why they sum exactly.","tariff_basis":null,"scenarios":null,"confidence":"triangulated","public_fragments":2,"contributed_points":0,"basis":"USD per MWh recurring, delivered to the standard 100 MW high-load-factor case, excluding customer-funded connection capital and excluding refundable taxes","cost_components":[{"name":"Wholesale energy","usd_per_mwh":38,"source":null,"provenance":{"provenance_state":"estimated_allocation","provenance_state_label":"Estimated allocation","provenance_state_means":"Apportioned from a compiled total or midpoint by analyst judgement. Not independently calculated, and not corroborated by anything outside the band it came from.","derivation":"allocation_of_compiled_midpoint","derivation_note":"This line apportions the compiled midpoint. Its value was not separately observed.","source_of_band_not_line":"EU electricity price components (Eurostat)","source_url_of_band_not_line":"https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics","band_as_of":"2026","customer_applicability":"100 MW contracted demand, 95% load factor, HV service","band_confidence":"triangulated","as_of":"2026","method":"analyst apportionment of the compiled midpoint across categories","confidence":"allocation","confidence_note":"Apportioned from the compiled delivered-cost midpoint by analyst judgement. Not separately observed.","covers_categories":["energy"],"corroborated_by":null,"state_vocabulary_version":"provenance-state-1.0","what_would_upgrade_it":"A separately sourced figure for this category with its own date, method and confidence. Until then the band's provenance establishes the total only, not this line.","version":"line-provenance-1.1"},"evidence":"estimated_allocation"},{"name":"Network charges","usd_per_mwh":15,"source":null,"provenance":{"provenance_state":"estimated_allocation","provenance_state_label":"Estimated allocation","provenance_state_means":"Apportioned from a compiled total or midpoint by analyst judgement. Not independently calculated, and not corroborated by anything outside the band it came from.","derivation":"allocation_of_compiled_midpoint","derivation_note":"This line apportions the compiled midpoint. Its value was not separately observed.","source_of_band_not_line":"EU electricity price components (Eurostat)","source_url_of_band_not_line":"https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics","band_as_of":"2026","customer_applicability":"100 MW contracted demand, 95% load factor, HV service","band_confidence":"triangulated","as_of":"2026","method":"analyst apportionment of the compiled midpoint across categories, covering transmission, distribution in one line","confidence":"bundled_allocation","confidence_note":"Apportioned, and covering more than one cost category in a single line. Neither the total nor the split within it was separately observed.","covers_categories":["transmission","distribution"],"corroborated_by":null,"state_vocabulary_version":"provenance-state-1.0","what_would_upgrade_it":"A separately sourced figure for this category with its own date, method and confidence. Until then the band's provenance establishes the total only, not this line.","version":"line-provenance-1.1"},"evidence":"estimated_allocation"},{"name":"Taxes & levies","usd_per_mwh":5,"source":null,"provenance":{"provenance_state":"estimated_allocation","provenance_state_label":"Estimated allocation","provenance_state_means":"Apportioned from a compiled total or midpoint by analyst judgement. Not independently calculated, and not corroborated by anything outside the band it came from.","derivation":"allocation_of_compiled_midpoint","derivation_note":"This line apportions the compiled midpoint. Its value was not separately observed.","source_of_band_not_line":"EU electricity price components (Eurostat)","source_url_of_band_not_line":"https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics","band_as_of":"2026","customer_applicability":"100 MW contracted demand, 95% load factor, HV service","band_confidence":"triangulated","as_of":"2026","method":"analyst apportionment of the compiled midpoint across categories","confidence":"allocation","confidence_note":"Apportioned from the compiled delivered-cost midpoint by analyst judgement. Not separately observed.","covers_categories":["taxes"],"corroborated_by":null,"state_vocabulary_version":"provenance-state-1.0","what_would_upgrade_it":"A separately sourced figure for this category with its own date, method and confidence. Until then the band's provenance establishes the total only, not this line.","version":"line-provenance-1.1"},"evidence":"estimated_allocation"}],"component_status":{"arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","independently_sourced_lines":0,"total_lines":3,"bundled":[],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of its midpoint, not separately observed figures.","provenance_summary":{"by_state":{"estimated_allocation":3},"usd_by_state":{"estimated_allocation":58},"evidenced_share_pct":0,"lines_awaiting_evidence":["Wholesale energy","Network charges","Taxes & levies"],"what_would_close_them":"A separately sourced or tariff-derived figure for each category, with its own date, method and confidence. Until then the band's provenance establishes the total only, not these lines.","version":"provenance-state-1.0"},"category_coverage":{"energy":{"status":"estimated","line":"Wholesale energy","missing_evidence":"An independently sourced wholesale or tariff energy figure with its own date, method and confidence."},"capacity":{"status":"unavailable","missing_evidence":"No capacity or resource adequacy figure is held for this market."},"transmission":{"status":"bundled","line":"Network charges","combined_with":["distribution"],"line_is_sourced":false,"line_provenance_state":"estimated_allocation","source":null,"source_url":null,"effective":null,"formula":null,"missing_evidence":"A separate transmission figure, or a sourced apportionment of the Network charges line."},"distribution":{"status":"bundled","line":"Network charges","combined_with":["transmission"],"line_is_sourced":false,"line_provenance_state":"estimated_allocation","source":null,"source_url":null,"effective":null,"formula":null,"missing_evidence":"A separate distribution figure, or a sourced apportionment of the Network charges line."},"demand_charges":{"status":"unavailable","missing_evidence":"No demand charges figure is held for this market."},"ancillary":{"status":"unavailable","missing_evidence":"No ancillary services and uplift figure is held for this market."},"riders":{"status":"unavailable","missing_evidence":"No riders and unavoidable regulatory charges figure is held for this market."},"carbon":{"status":"unavailable","missing_evidence":"No carbon-related charges figure is held for this market."},"taxes":{"status":"estimated","line":"Taxes & levies","missing_evidence":"An independently sourced recurring taxes figure with its own date, method and confidence."},"connection_capital":{"status":"not_applicable","reason":"Outside the recurring $/MWh boundary by definition."}},"category_vocabulary_version":"cost-categories-1.0","capacity_cross_check":null,"method_version":"cost-components-1.0"},"component_source":["EU electricity price components (Eurostat)","https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics"]},"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":null,"partial_cost_verified":null,"cost_pillar_calculation":null,"evidence":{"source_reliability":"Moderate","coverage":"Full","coverage_dimensions":3,"last_reviewed":"June 2026","measured_layers":1,"data_layers":3,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability review","method":"measured","vintage":"2025","freshness":"Fresh","source_url":"https://world-nuclear-news.org/Articles/Finnish-EPR-starts-supplying-electricity"},{"layer":"Connection friction","method":"proxy","vintage":"2025/26","freshness":"Fresh","source_url":"https://www.argusmedia.com/en/news-and-insights/latest-market-news/2806298-nordic-data-centres-to-support-power-demand-growth"},{"layer":"Realized cost","method":"triangulated","vintage":"2026","freshness":"Fresh","source_url":"https://ec.europa.eu/eurostat/statistics-explained/index.php?title=Electricity_price_statistics"}]},"outlook":"Positive","confidence":"Med-High","under_review":false,"thesis":"Cheap, clean and openly courting hyperscalers (Microsoft). A welcoming Nordic market with firm nuclear and abundant wind.","pillars":{"access":72,"availability":70,"cost":68,"momentum":55,"carbon":90},"pillar_rationale":{"access":"Open and welcoming to data centers.","availability":"Good availability (nuclear plus wind plus imports).","cost":"Competitive cost.","momentum":"Real momentum (Microsoft-anchored).","carbon":"Very clean (~20-70 g)."},"offtake_opportunity_index":71,"demand_hunger":34,"build_feasibility":73,"supplier_signals":{"bess_arbitrage_usd_mwh":15,"bess_arbitrage_pct":40,"solar_capture_pct":98,"wind_capture_pct":100},"outlook_drivers":{"upgrade":["Hyperscaler build scales.","Heat-reuse incentives add value."],"downgrade":["Cold-snap peaks and import dependence.","Small-market scale limits."]},"risks":["Winter peak and import reliance.","Scale."],"peers":{"like":"Sweden (clean, open Nordic)","ahead":"on openness","behind":"on scale"},"sources":[{"label":"Nordic data-center market","url":"https://www.mordorintelligence.com/industry-reports/nordic-data-center-market"}],"latest_action":{"date":"June 2026","type":"New rating","note":"New rating: Tier 2 Strong assigned.","trigger":null},"grid":{"price_usd_mwh":38,"carbon_intensity_g":50,"renewable_pct":52,"renewable_generation_share_pct":52,"low_carbon_generation_share_pct":94,"fuel_mix":{"nuclear":42,"hydro":20,"wind":18,"biofuel":13,"gas":4,"coal":2,"solar":1},"demand_mw":8200,"capacity_mw":20000,"imports_mw":2000,"exports_mw":1000,"firm_capacity_mw":null,"firm_capacity_availability":"insufficient_evidence","firm_capacity_basis":null,"est_peak_mw":11644,"firm_headroom_mw":null,"firm_headroom_availability":"dependency_unavailable","peak_stress_pct":null,"peak_stress_availability":"dependency_unavailable","adequacy_required_input":"capacity_mix_mw with a declared basis, or an official dependable or accredited capacity from the operator","price_cycle":"nuclear","price_basis":"not_reviewed","price_absent_reason":null,"price_source":"modelled-baseline","price_as_of":null,"price_vintage":"undated_modelled_baseline","price_is_live":false,"carbon_intensity_unit":"gCO2eq/kWh","carbon_measurement_boundary":"operational_combustion","carbon_calculation_method":"structural_estimate","carbon_emission_factor_source":null,"carbon_basis_withdrawn":true,"carbon_imports_treatment":"not_accounted","carbon_provenance_state":"structural","carbon_decision_eligibility":"insufficient_evidence","carbon_confidence":"low","source":"modelled-baseline"},"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"M1 Broad","overall_permits":"Directional only: supports discovery, comparison and monitoring, not a project decision.","insufficient_evidence":false,"unassessed_required_fields":[],"project_ready":false,"blocking_fields":["connection","reliability"],"fields":{"cost":"M3 Project-ready","connection":"M1 Broad","reliability":"M2 Compiled","carbon":"M2 Compiled","regulatory":"M2 Compiled","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["connection"],"insufficient_evidence":false,"why":""},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["connection","reliability"],"insufficient_evidence":false,"why":""},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["connection","reliability"],"insufficient_evidence":false,"why":""},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["connection","reliability","carbon"],"insufficient_evidence":false,"why":""},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: local capacity"}},"reliability_layers":{"bulk_historical":{"state":"held","method":"measured"},"forward_adequacy":{"state":"unknown","method":null},"local_delivery":{"state":"unknown","method":null},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2027-03-15","report_url":"https://powergridiq.com/rating/finland","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"independently_compiled","label":"Independently compiled","means":"The band is assembled from multiple sourced, dated and applicable published figures. It is not a single benchmark and it is not a tariff reconstruction.","reproducible":"partially"},"component":{"total_lines":3,"reproducible_lines":0,"states":["estimated_allocation"],"all_lines_are_estimated_allocations":true,"independently_reproducible":false,"illustrative":true,"notice":"Illustrative allocation of the compiled midpoint. Component lines are not separately sourced and should not be interpreted as observed tariff charges.","notice_short":"Illustrative allocation — lines not separately sourced","vocabulary_version":"evidence-layers-1.0"},"cost_pillar":{"state":"analyst_assessment","label":"Analyst assessment","means":"The score is a judgement recorded with a written cost-specific rationale. It is not calculated from a formula and does not claim to be.","reproducible":false},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."}}