{"id":"greece","rid":"GR","name":"Greece","flag":"🇬🇷","group":"europe","type":"market","parent":null,"regions":null,"tier_range":null,"tier":4,"tier_name":"Constrained","score":44,"pillar_score":47,"pillar_tier":4,"pillar_tier_name":"Constrained","tier_cap":null,"reliability":{"assessed":true,"level":"watch","dock":3,"provisional":false,"confidence":"Low","delivery_transmission":{"level":"none"},"delivery_distribution":{"level":"none"},"forward_capacity":{"level":"watch","measure":"modelled","note":"Modelled read: island interconnections and thermal reliance."},"read":"Minor flags found","level_means":"reviewed; flags found"},"reliability_dock":3,"regulatory_momentum":null,"scheduled_changes":null,"queue":null,"friction":null,"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":null,"territory_count":0},"reliability_metrics":null,"forward_cost":null,"tariff":null,"realized_cost":null,"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":null,"partial_cost_verified":null,"cost_pillar_calculation":null,"evidence":{"source_reliability":"Low","coverage":"Partial","coverage_dimensions":1,"last_reviewed":"June 2026","measured_layers":0,"data_layers":1,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability review","method":"modelled","vintage":"2025","freshness":"Fresh","source_url":null}]},"outlook":"Positive","confidence":"Med","under_review":false,"thesis":"Improving via submarine cables and solar, but expensive and small today.","pillars":{"access":55,"availability":55,"cost":40,"momentum":30,"carbon":53},"pillar_rationale":{"access":"Workable access; cable connectivity improving.","availability":"Moderate availability.","cost":"Analyst assessment (no comparable delivered-cost band yet): High cost.","momentum":"Limited momentum.","carbon":"Moderate carbon (~330 g)."},"reads":{"build":"Build score 55/100","sell":"Offtake grade B (index 68/100)","plan":"Load pressure: Light","monitor":null},"offtake_opportunity_index":68,"demand_hunger":42,"build_feasibility":55,"supplier_signals":{"bess_arbitrage_usd_mwh":56,"bess_arbitrage_pct":62,"solar_capture_pct":86,"wind_capture_pct":103},"outlook_drivers":{"upgrade":["Submarine cables make Greece a connectivity bridge.","Solar lowers cost and carbon."],"downgrade":["High cost.","Small scale."]},"risks":["Cost.","Scale."],"peers":{"like":"emerging Mediterranean markets","ahead":"on connectivity potential","behind":"on cost"},"sources":[{"label":"ENTSO-E","url":"https://www.entsoe.eu/"}],"latest_action":{"date":"June 2026","type":"New rating","note":"New rating: Tier 4 Constrained assigned.","trigger":null},"grid":{"price_usd_mwh":90,"carbon_intensity_g":264,"renewable_pct":44,"renewable_generation_share_pct":44,"low_carbon_generation_share_pct":44,"fuel_mix":{"gas":42,"wind":19,"solar":17,"hydro":6,"coal":6,"oil":6,"biofuel":2,"other":2},"demand_mw":7200,"capacity_mw":20000,"imports_mw":1000,"exports_mw":500,"firm_capacity_mw":null,"firm_capacity_availability":"insufficient_evidence","firm_capacity_basis":null,"est_peak_mw":10224,"firm_headroom_mw":null,"firm_headroom_availability":"dependency_unavailable","peak_stress_pct":null,"peak_stress_availability":"dependency_unavailable","adequacy_required_input":"capacity_mix_mw with a declared basis, or an official dependable or accredited capacity from the operator","price_cycle":"solar","price_basis":"not_reviewed","price_absent_reason":null,"price_source":"modelled-baseline","price_as_of":null,"price_vintage":"undated_modelled_baseline","price_is_live":false,"carbon_intensity_unit":"gCO2eq/kWh","carbon_measurement_boundary":"operational_combustion","carbon_calculation_method":"structural_estimate","carbon_emission_factor_source":null,"carbon_basis_withdrawn":true,"carbon_imports_treatment":"not_accounted","carbon_provenance_state":"structural","carbon_decision_eligibility":"insufficient_evidence","carbon_confidence":"low","source":"modelled-baseline","figures":{"price_usd_mwh":{"value":90,"unit":"USD/MWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:greece:price_usd_mwh:2026-06","report_url":"https://powergridiq.com/rating/greece"},"carbon_intensity_g":{"value":264,"unit":"gCO2/kWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:greece:carbon_intensity_g:2026-06","report_url":"https://powergridiq.com/rating/greece"},"renewable_pct":{"value":44,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:greece:renewable_pct:2026-06","report_url":"https://powergridiq.com/rating/greece"},"renewable_generation_share_pct":{"value":44,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:greece:renewable_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/greece"},"low_carbon_generation_share_pct":{"value":44,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:greece:low_carbon_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/greece"},"demand_mw":{"value":7200,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:greece:demand_mw:2026-06","report_url":"https://powergridiq.com/rating/greece"},"capacity_mw":{"value":20000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:greece:capacity_mw:2026-06","report_url":"https://powergridiq.com/rating/greece"},"imports_mw":{"value":1000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:greece:imports_mw:2026-06","report_url":"https://powergridiq.com/rating/greece"},"exports_mw":{"value":500,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:greece:exports_mw:2026-06","report_url":"https://powergridiq.com/rating/greece"},"est_peak_mw":{"value":10224,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:greece:est_peak_mw:2026-06","report_url":"https://powergridiq.com/rating/greece"},"firm_headroom_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:greece:firm_headroom_mw:2026-06","report_url":"https://powergridiq.com/rating/greece","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."},"peak_stress_pct":{"value":null,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:greece:peak_stress_pct:2026-06","report_url":"https://powergridiq.com/rating/greece","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."}}},"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"not_assessed","overall_permits":"Not assessed. Treat as an open diligence item; absence of a finding is not evidence of low risk.","insufficient_evidence":true,"unassessed_required_fields":["cost","connection"],"project_ready":false,"blocking_fields":["cost","connection","reliability"],"fields":{"cost":"not_assessed","connection":"not_assessed","reliability":"M2 Compiled","carbon":"M2 Compiled","regulatory":"not_assessed","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","carbon"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: cost, connection, local capacity"}},"reliability_layers":{"bulk_historical":{"state":"unknown","method":null},"forward_adequacy":{"state":"held","method":"modelled"},"local_delivery":{"state":"unknown","method":null},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2027-08-15","report_url":"https://powergridiq.com/rating/greece","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"insufficient_evidence","label":"Insufficient evidence","means":"No band is published because the available evidence does not support one.","reproducible":false},"component":null,"cost_pillar":{"state":"analyst_assessment","label":"Analyst assessment","means":"The score is a judgement recorded with a written cost-specific rationale. It is not calculated from a formula and does not claim to be.","reproducible":false},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:greece:tier:2026-06","report_url":"https://powergridiq.com/rating/greece"},"score":{"value":44,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:greece:score:2026-06","report_url":"https://powergridiq.com/rating/greece"},"pillar_score":{"value":47,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:greece:pillar_score:2026-06","report_url":"https://powergridiq.com/rating/greece"},"pillar_tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:greece:pillar_tier:2026-06","report_url":"https://powergridiq.com/rating/greece"},"reliability_dock":{"value":3,"unit":"points_deducted","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:greece:reliability_dock:2026-06","report_url":"https://powergridiq.com/rating/greece"},"offtake_opportunity_index":{"value":68,"unit":"index_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"derived","confidence":"Med","stable_id":"pgiq:greece:offtake_opportunity_index:2026-06","report_url":"https://powergridiq.com/rating/greece"},"realized_cost":{"value":null,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"applicable_evidence_incomplete","confidence":"Med","stable_id":"pgiq:greece:realized_cost:2026-06","report_url":"https://powergridiq.com/rating/greece","absence":"insufficient_evidence","reason_text":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours."}},"figure_contract_version":"1.0"}