{"id":"hong-kong","rid":"HK","name":"Hong Kong","flag":"🇭🇰","group":"asia","type":"market","parent":null,"regions":null,"tier_range":null,"tier":3,"tier_name":"Workable","score":49,"pillar_score":49,"pillar_tier":4,"pillar_tier_name":"Constrained","tier_cap":null,"reliability":{"assessed":true,"level":"none","dock":0,"provisional":false,"confidence":"Med-High","delivery_transmission":{"level":"none"},"delivery_distribution":{"level":"none","measure":"measured","note":"Strong local delivery record on the utility's own published measure: CLP reports about 99.999% supply reliability, roughly 2.6 minutes of unplanned outage a year, on a small, dense system. This describes distribution performance, not the terms of a firm service contract.","sources":[{"label":"CLP supply reliability and power quality","url":"https://www.clp.com.hk/en/about-clp/power-transmission-distribution/supply-reliability-power-quality"}]},"forward_capacity":{"level":"none"},"read":"No reliability flags found","level_means":"reviewed; no reliability flags found in the record we examined"},"reliability_dock":0,"regulatory_momentum":null,"scheduled_changes":null,"queue":null,"friction":{"level":"Moderate","wait":"2-3 years","measure":"proxy","has_detail":true},"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":"administered","territory_count":0},"reliability_metrics":null,"forward_cost":null,"tariff":null,"realized_cost":{"low_usd_per_mwh":170,"mid_usd_per_mwh":188,"high_usd_per_mwh":210,"aggregation":"band","estimate_usd_per_mwh":null,"estimate_kind_note":null,"total_derivation":"compiled_band_allocated_across_categories","total_derivation_note":"The band is the compiled result and the component lines apportion its midpoint, which is why they sum exactly.","tariff_basis":null,"scenarios":null,"confidence":"administered","public_fragments":1,"contributed_points":0,"basis":"USD per MWh recurring, delivered to the standard 100 MW high-load-factor case, excluding customer-funded connection capital and excluding refundable taxes","figures":{"low_usd_per_mwh":{"value":170,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"administered","stable_id":"pgiq:hong-kong:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/hong-kong"},"mid_usd_per_mwh":{"value":188,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"administered","stable_id":"pgiq:hong-kong:mid_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/hong-kong"},"high_usd_per_mwh":{"value":210,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"administered","stable_id":"pgiq:hong-kong:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/hong-kong"}}},"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":null,"partial_cost_verified":null,"cost_pillar_calculation":{"method":"cost-rescore-1.1","rubric_version":"cost-rescore-1.1","rule":"Cost pillar = 90 at $50/MWh, 35 at $150/MWh, straight line, kept within 35-95, scored on the band midpoint.","input_usd_per_mwh":188,"input_mid_usd_per_mwh":188,"level_score":35,"direction":"stable","direction_adjustment":0,"observability":"estimated_allocation","observability_adjustment":0,"cost_pillar":35,"arithmetic":"35.0 +0 +0 = 35","band_low_usd_per_mwh":170,"band_high_usd_per_mwh":210,"score_at_band_low":35,"score_at_band_high":35,"previous_cost_pillar":25},"evidence":{"source_reliability":"Moderate","coverage":"Full","coverage_dimensions":3,"last_reviewed":"June 2026","measured_layers":2,"data_layers":3,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability review","method":"measured","vintage":"2025","freshness":"Fresh","source_url":"https://www.clp.com.hk/en/about-clp/power-transmission-distribution/supply-reliability-power-quality"},{"layer":"Connection friction","method":"proxy","vintage":"2025/26","freshness":"Fresh","source_url":"https://www.datacentre.gov.hk/en/accommodating_data_centres/power_supply.html"},{"layer":"Realized cost","method":"measured","vintage":"2026","freshness":"Fresh","source_url":"https://www.news.gov.hk/eng/2025/11/20251118/20251118_171441_586.html"}]},"outlook":"Stable","confidence":"Med-High","under_review":false,"thesis":"A government-supported finance and cloud data hub with a strong measured delivery record, but among the most expensive power anywhere, on a small, land-constrained system, which keeps it a friction market for a new large load.","pillars":{"access":42,"availability":55,"cost":35,"momentum":58,"carbon":40},"pillar_rationale":{"access":"Constrained access: severe land scarcity and a small system, though the government facilitates data centres and is upgrading the Northern Metropolis grid for AI density.","availability":"Strong local delivery record: CLP reports about 99.999% supply reliability, roughly 2.6 minutes of unplanned outage a year, on a ~7.2 GW system.","cost":"Scored from what a 100 MW load actually pays here once grid fees, taxes and other charges are added, not from the wholesale price: about $188 per MWh (band $170 to $210). On the PGIQ cost scale ($50 per MWh scores 90, $150 per MWh scores 35) that gives 35. At the cheap end of the band it would score 35; at the dear end, 35.","momentum":"Moderate momentum: an established banking and cloud hub plus a government AI Supercomputing Centre, but a small overall market.","carbon":"Moderate-high carbon: gas and coal, with imported nuclear from Daya Bay."},"reads":{"build":"Build score 65/100","sell":"Offtake grade A (index 85/100)","plan":"Load pressure: Light","monitor":"Grid strength: Robust (70/100)"},"offtake_opportunity_index":85,"demand_hunger":51,"build_feasibility":65,"supplier_signals":null,"outlook_drivers":{"upgrade":["Northern Metropolis grid upgrades unlock AI-density sites.","More gas and imported low-carbon power lower the grid average."],"downgrade":["Land scarcity and high cost cap large new builds.","Tariffs stay among the highest in the region."]},"risks":["Very high power cost.","Land and space scarcity on a small system."],"peers":{"like":"Singapore and Taiwan (pricey, constrained hubs)","ahead":"on reliability","behind":"on cost and scale"},"sources":[{"label":"CLP and HK Electric 2026 tariffs (HK Government)","url":"https://www.news.gov.hk/eng/2025/11/20251118/20251118_171441_586.html"},{"label":"CLP supply reliability about 99.999%","url":"https://www.clp.com.hk/en/about-clp/power-transmission-distribution/supply-reliability-power-quality"},{"label":"Developing data centres in Hong Kong (HK Government)","url":"https://www.datacentre.gov.hk/en/accommodating_data_centres/power_supply.html"}],"latest_action":{"date":"Oct 2026","type":"Upgrade","note":"Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 46 to 49. Tier 4 Constrained to Tier 3 Workable.","trigger":"Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release","release":"ratings-release-2026-cost"},"grid":null,"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"M1 Broad","overall_permits":"Directional only: supports discovery, comparison and monitoring, not a project decision.","insufficient_evidence":false,"unassessed_required_fields":[],"project_ready":false,"blocking_fields":["cost","connection","reliability"],"fields":{"cost":"M2 Compiled","connection":"M1 Broad","reliability":"M1 Broad","carbon":"M2 Compiled","regulatory":"not_assessed","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection"],"insufficient_evidence":false,"why":""},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":false,"why":""},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":false,"why":""},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability","carbon"],"insufficient_evidence":false,"why":""},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: local capacity"}},"reliability_layers":{"bulk_historical":{"state":"unknown","method":null},"forward_adequacy":{"state":"unknown","method":null},"local_delivery":{"state":"unknown","method":null},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2026-12-15","report_url":"https://powergridiq.com/rating/hong-kong","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"estimated","label":"Estimated","means":"The band is an analyst estimate against a stated reasoning, not a sourced figure.","reproducible":false},"component":null,"cost_pillar":{"state":"rubric_derived","label":"Rubric derived","means":"The score is reproduced from a declared rubric, stored inputs and a published formula, and a gate asserts the published score and the rubric agree.","reproducible":true},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."},"in_cost_comparison":{"value":true,"reason_code":null,"reason_text":null},"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med-High","stable_id":"pgiq:hong-kong:tier:2026-06","report_url":"https://powergridiq.com/rating/hong-kong"},"score":{"value":49,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med-High","stable_id":"pgiq:hong-kong:score:2026-06","report_url":"https://powergridiq.com/rating/hong-kong"},"pillar_score":{"value":49,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med-High","stable_id":"pgiq:hong-kong:pillar_score:2026-06","report_url":"https://powergridiq.com/rating/hong-kong"},"pillar_tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med-High","stable_id":"pgiq:hong-kong:pillar_tier:2026-06","report_url":"https://powergridiq.com/rating/hong-kong"},"reliability_dock":{"value":0,"unit":"points_deducted","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med-High","stable_id":"pgiq:hong-kong:reliability_dock:2026-06","report_url":"https://powergridiq.com/rating/hong-kong"},"offtake_opportunity_index":{"value":85,"unit":"index_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"derived","confidence":"Med-High","stable_id":"pgiq:hong-kong:offtake_opportunity_index:2026-06","report_url":"https://powergridiq.com/rating/hong-kong"}},"figure_contract_version":"1.0"}