{"id":"japan-west","rid":"JP-W","name":"Japan West (Osaka, 60Hz)","flag":"🇯🇵","group":"asia","type":"market","parent":"japan","regions":null,"tier_range":null,"tier":3,"tier_name":"Workable","score":53,"pillar_score":53,"pillar_tier":3,"pillar_tier_name":"Workable","tier_cap":null,"reliability":{"assessed":true,"level":"none","dock":0,"provisional":false,"confidence":"Med-High","delivery_transmission":{"level":"none","measure":"event-based","note":"The 60Hz west runs restarted nuclear baseload (Takahama, Ohi, Mihama) and curtails surplus renewables, so forward firm capacity is comfortable; the main national issue is price, not reliability.","sources":[{"label":"Kansai nuclear restarts and curtailment (IEEFA)","url":"https://ieefa.org/resources/japans-energy-security-response-creating-renewables-blind-spot"}]},"delivery_distribution":{"level":"none"},"forward_capacity":{"level":"none"},"read":"No reliability flags found","level_means":"reviewed; no reliability flags found in the record we examined"},"reliability_dock":0,"regulatory_momentum":null,"scheduled_changes":null,"queue":null,"friction":{"level":"High","wait":"4-8 years","measure":"proxy","has_detail":true},"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":"modelled","territory_count":0},"reliability_metrics":{"saidi_min":24,"saidi_year":"FY2024","forward_adequacy":null,"measure":"historical utility-territory delivery performance","standard":null,"standard_note":null,"evidence_role":"market_context","by_serving_utility":[],"evidence_role_basis":"national average across Japan's regional utilities","figures":{"saidi_min":{"value":24,"unit":"minutes per customer per year","as_of":"2026-06","source":{"name":"Utility reliability filings (SAIDI)","url":"https://powergridiq.com/methodology"},"method":"published","confidence":"Med","stable_id":"pgiq:japan-west:saidi_min:2026-06","report_url":"https://powergridiq.com/rating/japan-west"}}},"forward_cost":null,"tariff":null,"realized_cost":{"low_usd_per_mwh":125,"mid_usd_per_mwh":150,"high_usd_per_mwh":175,"aggregation":"band","estimate_usd_per_mwh":null,"estimate_kind_note":null,"total_derivation":"compiled_band_allocated_across_categories","total_derivation_note":"The band is the compiled result and the component lines apportion its midpoint, which is why they sum exactly.","tariff_basis":null,"scenarios":null,"confidence":"modelled","public_fragments":2,"contributed_points":0,"basis":"USD per MWh recurring, delivered to the standard 100 MW high-load-factor case, excluding customer-funded connection capital and excluding refundable taxes","cost_components":[{"name":"Generation (nuclear + LNG)","usd_per_mwh":105,"source":null,"provenance":{"provenance_state":"estimated_allocation","provenance_state_label":"Estimated allocation","provenance_state_means":"Apportioned from a compiled total or midpoint by analyst judgement. Not independently calculated, and not corroborated by anything outside the band it came from.","derivation":"allocation_of_compiled_midpoint","derivation_note":"This line apportions the compiled midpoint. Its value was not separately observed.","source_of_band_not_line":"Japan business electricity price (GlobalPetrolPrices, Dec 2025)","source_url_of_band_not_line":"https://www.globalpetrolprices.com/Japan/electricity_prices/","band_as_of":"2026","customer_applicability":"100 MW contracted demand, 95% load factor, HV service","band_confidence":"modelled","as_of":"2026","method":"analyst apportionment of the compiled midpoint across categories","confidence":"allocation","confidence_note":"Apportioned from the compiled delivered-cost midpoint by analyst judgement. Not separately observed.","covers_categories":null,"corroborated_by":null,"state_vocabulary_version":"provenance-state-1.0","what_would_upgrade_it":"A separately sourced figure for this category with its own date, method and confidence. Until then the band's provenance establishes the total only, not this line.","version":"line-provenance-1.1"},"evidence":"estimated_allocation"},{"name":"Transmission & distribution","usd_per_mwh":30,"source":null,"provenance":{"provenance_state":"estimated_allocation","provenance_state_label":"Estimated allocation","provenance_state_means":"Apportioned from a compiled total or midpoint by analyst judgement. Not independently calculated, and not corroborated by anything outside the band it came from.","derivation":"allocation_of_compiled_midpoint","derivation_note":"This line apportions the compiled midpoint. Its value was not separately observed.","source_of_band_not_line":"Japan business electricity price (GlobalPetrolPrices, Dec 2025)","source_url_of_band_not_line":"https://www.globalpetrolprices.com/Japan/electricity_prices/","band_as_of":"2026","customer_applicability":"100 MW contracted demand, 95% load factor, HV service","band_confidence":"modelled","as_of":"2026","method":"analyst apportionment of the compiled midpoint across categories, covering transmission, distribution in one line","confidence":"bundled_allocation","confidence_note":"Apportioned, and covering more than one cost category in a single line. Neither the total nor the split within it was separately observed.","covers_categories":["transmission","distribution"],"corroborated_by":null,"state_vocabulary_version":"provenance-state-1.0","what_would_upgrade_it":"A separately sourced figure for this category with its own date, method and confidence. Until then the band's provenance establishes the total only, not this line.","version":"line-provenance-1.1"},"evidence":"estimated_allocation"},{"name":"Fuel-cost adjustment & renewable levy","usd_per_mwh":15,"source":null,"provenance":{"provenance_state":"estimated_allocation","provenance_state_label":"Estimated allocation","provenance_state_means":"Apportioned from a compiled total or midpoint by analyst judgement. Not independently calculated, and not corroborated by anything outside the band it came from.","derivation":"allocation_of_compiled_midpoint","derivation_note":"This line apportions the compiled midpoint. Its value was not separately observed.","source_of_band_not_line":"Japan business electricity price (GlobalPetrolPrices, Dec 2025)","source_url_of_band_not_line":"https://www.globalpetrolprices.com/Japan/electricity_prices/","band_as_of":"2026","customer_applicability":"100 MW contracted demand, 95% load factor, HV service","band_confidence":"modelled","as_of":"2026","method":"analyst apportionment of the compiled midpoint across categories","confidence":"allocation","confidence_note":"Apportioned from the compiled delivered-cost midpoint by analyst judgement. Not separately observed.","covers_categories":null,"corroborated_by":null,"state_vocabulary_version":"provenance-state-1.0","what_would_upgrade_it":"A separately sourced figure for this category with its own date, method and confidence. Until then the band's provenance establishes the total only, not this line.","version":"line-provenance-1.1"},"evidence":"estimated_allocation"}],"component_status":{"arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","independently_sourced_lines":0,"total_lines":3,"bundled":[],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of its midpoint, not separately observed figures.","provenance_summary":{"by_state":{"estimated_allocation":3},"usd_by_state":{"estimated_allocation":150},"evidenced_share_pct":0,"lines_awaiting_evidence":["Generation (nuclear + LNG)","Transmission & distribution","Fuel-cost adjustment & renewable levy"],"what_would_close_them":"A separately sourced or tariff-derived figure for each category, with its own date, method and confidence. Until then the band's provenance establishes the total only, not these lines.","version":"provenance-state-1.0"},"category_coverage":{"energy":{"status":"unavailable","missing_evidence":"No wholesale or tariff energy figure is held for this market."},"capacity":{"status":"unavailable","missing_evidence":"No capacity or resource adequacy figure is held for this market."},"transmission":{"status":"bundled","line":"Transmission & distribution","combined_with":["distribution"],"line_is_sourced":false,"line_provenance_state":"estimated_allocation","source":null,"source_url":null,"effective":null,"formula":null,"missing_evidence":"A separate transmission figure, or a sourced apportionment of the Transmission & distribution line."},"distribution":{"status":"bundled","line":"Transmission & distribution","combined_with":["transmission"],"line_is_sourced":false,"line_provenance_state":"estimated_allocation","source":null,"source_url":null,"effective":null,"formula":null,"missing_evidence":"A separate distribution figure, or a sourced apportionment of the Transmission & distribution line."},"demand_charges":{"status":"unavailable","missing_evidence":"No demand charges figure is held for this market."},"ancillary":{"status":"unavailable","missing_evidence":"No ancillary services and uplift figure is held for this market."},"riders":{"status":"unavailable","missing_evidence":"No riders and unavoidable regulatory charges figure is held for this market."},"carbon":{"status":"unavailable","missing_evidence":"No carbon-related charges figure is held for this market."},"taxes":{"status":"unavailable","missing_evidence":"No recurring taxes figure is held for this market."},"connection_capital":{"status":"not_applicable","reason":"Outside the recurring $/MWh boundary by definition."}},"category_vocabulary_version":"cost-categories-1.0","capacity_cross_check":null,"method_version":"cost-components-1.0"},"component_source":["Japan business electricity price (GlobalPetrolPrices, Dec 2025)","https://www.globalpetrolprices.com/Japan/electricity_prices/"],"figures":{"low_usd_per_mwh":{"value":125,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"modelled","stable_id":"pgiq:japan-west:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"mid_usd_per_mwh":{"value":150,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"modelled","stable_id":"pgiq:japan-west:mid_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"high_usd_per_mwh":{"value":175,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"modelled","stable_id":"pgiq:japan-west:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/japan-west"}}},"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":null,"partial_cost_verified":null,"cost_pillar_calculation":{"method":"cost-rescore-1.1","rubric_version":"cost-rescore-1.1","rule":"Cost pillar = 90 at $50/MWh, 35 at $150/MWh, straight line, kept within 35-95, scored on the band midpoint.","input_usd_per_mwh":150,"input_mid_usd_per_mwh":150,"level_score":35,"direction":"stable","direction_adjustment":0,"observability":"estimated_allocation","observability_adjustment":0,"cost_pillar":35,"arithmetic":"35.0 +0 +0 = 35","band_low_usd_per_mwh":125,"band_high_usd_per_mwh":175,"score_at_band_low":49,"score_at_band_high":35,"previous_cost_pillar":28},"evidence":{"source_reliability":"Limited","coverage":"Full","coverage_dimensions":3,"last_reviewed":"June 2026","measured_layers":1,"data_layers":3,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability","method":"measured","vintage":"FY2024","freshness":"Fresh","source_url":"https://www.occto.or.jp"},{"layer":"Connection friction","method":"proxy","vintage":"2025/26","freshness":"Fresh","source_url":"https://asia.nikkei.com/business/energy/japan-s-utilities-pour-billions-into-power-grid-amid-data-center-growth"},{"layer":"Realized cost","method":"modelled","vintage":"2026","freshness":"Fresh","source_url":"https://www.globalpetrolprices.com/Japan/electricity_prices/"}]},"outlook":"Positive","confidence":"Med","under_review":false,"thesis":"The 60Hz western grid (Kansai/KEPCO and Chubu) is the more comfortable half: restarted nuclear provides firm, cleaner baseload, so much so that Kansai now curtails surplus renewables. Osaka is a real and growing hub.","pillars":{"access":58,"availability":62,"cost":35,"momentum":60,"carbon":45},"pillar_rationale":{"access":"Workable access; Osaka is Japan's second data-center hub and growing.","availability":"Stronger availability: Takahama, Ohi and Mihama nuclear restarts give firm baseload, with renewable curtailment when several units run.","cost":"Scored from what a 100 MW load actually pays here once grid fees, taxes and other charges are added, not from the wholesale price: about $150 per MWh (band $125 to $175). On the PGIQ cost scale ($50 per MWh scores 90, $150 per MWh scores 35) that gives 35. At the cheap end of the band it would score 49; at the dear end, 35.","momentum":"Solid momentum: Osaka build is real if behind Tokyo.","carbon":"Cleaner power: restarted nuclear lowers western carbon relative to the east."},"reads":{"build":"Build score 42/100","sell":"Offtake grade B (index 61/100)","plan":"Load pressure: Light","monitor":"Grid strength: Adequate (63/100)"},"offtake_opportunity_index":61,"demand_hunger":47,"build_feasibility":42,"supplier_signals":{"bess_arbitrage_usd_mwh":50,"bess_arbitrage_pct":62,"solar_capture_pct":106,"wind_capture_pct":99},"outlook_drivers":{"upgrade":["Continued nuclear restarts deepen firm, low-carbon baseload.","Osaka build accelerates."],"downgrade":["High national power cost persists.","A nuclear outage tightens the balance."]},"risks":["Cost.","Reliance on continued nuclear operation."],"peers":{"like":"nuclear-backed firm grids","ahead":"eastern Japan on availability and carbon","behind":"Tokyo on revealed build"},"sources":[{"label":"Kansai nuclear restarts and renewable curtailment (IEEFA)","url":"https://ieefa.org/resources/japans-energy-security-response-creating-renewables-blind-spot"}],"latest_action":{"date":"Oct 2026","type":"Affirmed","note":"Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 51 to 53. Tier 3 Workable unchanged.","trigger":"Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release","release":"ratings-release-2026-cost"},"grid":{"price_usd_mwh":80,"carbon_intensity_g":340,"renewable_pct":25,"renewable_generation_share_pct":25,"low_carbon_generation_share_pct":50,"fuel_mix":{"nuclear":25,"gas":33,"coal":15,"solar":11,"hydro":10,"oil":2,"biofuel":2,"wind":2},"demand_mw":35000,"capacity_mw":72000,"imports_mw":null,"exports_mw":null,"imports_state":"not_held","exports_state":"not_held","cross_border_note":"Trades with eastern Japan through the 50/60 Hz frequency converters; the internal flow is not held.","firm_capacity_mw":null,"firm_capacity_availability":"insufficient_evidence","firm_capacity_basis":null,"est_peak_mw":51800,"firm_headroom_mw":null,"firm_headroom_availability":"dependency_unavailable","peak_stress_pct":null,"peak_stress_availability":"dependency_unavailable","adequacy_required_input":"capacity_mix_mw with a declared basis, or an official dependable or accredited capacity from the operator","price_cycle":"other","price_basis":"not_reviewed","price_absent_reason":null,"price_source":"modelled-baseline","price_as_of":null,"price_vintage":"undated_modelled_baseline","price_is_live":false,"carbon_intensity_unit":"gCO2eq/kWh","carbon_measurement_boundary":"operational_combustion","carbon_calculation_method":"structural_estimate","carbon_emission_factor_source":null,"carbon_basis_withdrawn":true,"carbon_imports_treatment":"not_accounted","carbon_provenance_state":"structural","carbon_decision_eligibility":"insufficient_evidence","carbon_confidence":"low","source":"modelled-baseline","figures":{"price_usd_mwh":{"value":80,"unit":"USD/MWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:japan-west:price_usd_mwh:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"carbon_intensity_g":{"value":340,"unit":"gCO2/kWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:japan-west:carbon_intensity_g:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"renewable_pct":{"value":25,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:japan-west:renewable_pct:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"renewable_generation_share_pct":{"value":25,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:japan-west:renewable_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"low_carbon_generation_share_pct":{"value":50,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:japan-west:low_carbon_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"demand_mw":{"value":35000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:japan-west:demand_mw:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"capacity_mw":{"value":72000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:japan-west:capacity_mw:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"imports_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:japan-west:imports_mw:2026-06","report_url":"https://powergridiq.com/rating/japan-west","absence":"not_collected","reason_text":"Trades with eastern Japan through the 50/60 Hz frequency converters; the internal flow is not held."},"exports_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:japan-west:exports_mw:2026-06","report_url":"https://powergridiq.com/rating/japan-west","absence":"not_collected","reason_text":"Trades with eastern Japan through the 50/60 Hz frequency converters; the internal flow is not held."},"est_peak_mw":{"value":51800,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:japan-west:est_peak_mw:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"firm_headroom_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:japan-west:firm_headroom_mw:2026-06","report_url":"https://powergridiq.com/rating/japan-west","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."},"peak_stress_pct":{"value":null,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:japan-west:peak_stress_pct:2026-06","report_url":"https://powergridiq.com/rating/japan-west","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."}}},"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"M1 Broad","overall_permits":"Directional only: supports discovery, comparison and monitoring, not a project decision.","insufficient_evidence":false,"unassessed_required_fields":[],"project_ready":false,"blocking_fields":["cost","connection","reliability"],"fields":{"cost":"M1 Broad","connection":"M1 Broad","reliability":"M2 Compiled","carbon":"M2 Compiled","regulatory":"not_assessed","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection"],"insufficient_evidence":false,"why":""},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":false,"why":""},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":false,"why":""},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability","carbon"],"insufficient_evidence":false,"why":""},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: local capacity"}},"reliability_layers":{"bulk_historical":{"state":"held","method":"event-based"},"forward_adequacy":{"state":"unknown","method":null},"local_delivery":{"state":"held","method":"measured"},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2027-06-15","report_url":"https://powergridiq.com/rating/japan-west","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"independently_compiled","label":"Independently compiled","means":"The band is assembled from multiple sourced, dated and applicable published figures. It is not a single benchmark and it is not a tariff reconstruction.","reproducible":"partially"},"component":{"total_lines":3,"reproducible_lines":0,"states":["estimated_allocation"],"all_lines_are_estimated_allocations":true,"independently_reproducible":false,"illustrative":true,"notice":"Illustrative allocation of the compiled midpoint. Component lines are not separately sourced and should not be interpreted as observed tariff charges.","notice_short":"Illustrative allocation — lines not separately sourced","vocabulary_version":"evidence-layers-1.0"},"cost_pillar":{"state":"rubric_derived","label":"Rubric derived","means":"The score is reproduced from a declared rubric, stored inputs and a published formula, and a gate asserts the published score and the rubric agree.","reproducible":true},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."},"in_cost_comparison":{"value":true,"reason_code":null,"reason_text":null},"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:japan-west:tier:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"score":{"value":53,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:japan-west:score:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"pillar_score":{"value":53,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:japan-west:pillar_score:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"pillar_tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:japan-west:pillar_tier:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"reliability_dock":{"value":0,"unit":"points_deducted","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:japan-west:reliability_dock:2026-06","report_url":"https://powergridiq.com/rating/japan-west"},"offtake_opportunity_index":{"value":61,"unit":"index_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"derived","confidence":"Med","stable_id":"pgiq:japan-west:offtake_opportunity_index:2026-06","report_url":"https://powergridiq.com/rating/japan-west"}},"figure_contract_version":"1.0"}