{"id":"manitoba","rid":"MB","name":"Manitoba","flag":"🇨🇦","group":"canada","type":"market","parent":null,"regions":null,"tier_range":null,"tier":2,"tier_name":"Strong","score":70,"pillar_score":73,"pillar_tier":2,"pillar_tier_name":"Strong","tier_cap":null,"reliability":{"assessed":true,"level":"watch","dock":3,"provisional":false,"confidence":"Med","delivery_transmission":{"level":"none"},"delivery_distribution":{"level":"none"},"forward_capacity":{"level":"watch","measure":"modelled","note":"Manitoba Hydro is about 97% hydro, cheap and clean, but that deep hydro dependence carries a drought-year adequacy exposure similar to British Columbia."},"read":"Minor flags found","level_means":"reviewed; flags found"},"reliability_dock":3,"regulatory_momentum":null,"scheduled_changes":null,"queue":null,"friction":null,"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":null,"territory_count":0},"reliability_metrics":null,"forward_cost":null,"tariff":{"usd_per_kwh":0.035,"native":"about 4 to 5 cents CAD per kWh","basis":"regulated, Manitoba Hydro large-industrial rate","figures":{"usd_per_kwh":{"value":0.035,"unit":"USD/kWh (published tariff)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"published","confidence":"High","stable_id":"pgiq:manitoba:usd_per_kwh:2026-06","report_url":"https://powergridiq.com/rating/manitoba"}}},"realized_cost":null,"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":{"publisher":"Environment and Climate Change Canada","publication":"National Inventory Report 1990-2024: Greenhouse Gas Sources and Sinks in Canada","table":"A7-8","jurisdiction":"Manitoba","year":"2024","preliminary":true,"unit":"gCO2eq/kWh","boundary":"operational_combustion","boundary_label":"generation_intensity","boundary_quote":"A “generation intensity” indicator is derived to reflect the GHG emissions intensity of electricity as it is delivered to the electricity grid.","generation_intensity":2.704,"consumption_intensity_not_adopted":3.045,"why_consumption_not_adopted":"SF6 is not combustion, and the denominator is not generation. This is a wider boundary than operational_combustion. Publishing it as if it were operational would repeat the mixed-boundary defect corrected on 8 September.","scope_excludes":"autoproducers (main activity producers only)","licence":"Open Government Licence - Canada","url":"https://data-donnees.ec.gc.ca/data/substances/monitor/canada-s-official-greenhouse-gas-inventory/C-Tables-Electricity-Canada-Provinces-Territories/","read_on":"2026-09-09","published_value":3,"published_value_basis":"official_inventory_rounded","official_value":2.7,"difference_published_minus_official":0.3,"which_one_is_served_by_this_api":"official_value_rounded","adoption_status":"adopted","adopted_on":"2026-09-28","why_not_adopted":null,"what_this_means_for_the_rating":"Nothing either way. carbon_intensity_g is not an input to the PGIQ Rating -- the carbon pillar is a separate, assessed field -- so neither the published value nor the official one moves a tier, score, pillar or outlook.","caveats":["Annex 7 states: \"The analysis in this section only includes main activity producers.\" Autoproducers -- industrial sites generating for their own use, such as pulp mills and refinery cogeneration -- are excluded from both the emissions and the generation. A grid average that included them would differ, and in a province with heavy industrial self-generation it would differ materially.","The 2024 column carries footnote a, \"Preliminary data\". It is the current official figure and it is expected to be revised in a later submission.","Annex 7 footnote 1: Statistics Canada occasionally revises historic data, which can change values across the whole series, not just the latest year. A figure adopted from this table is a figure that will move."],"observed_generation_mix_2024":{"gas_pct":0.25,"coal_pct":0,"all_combustion_pct":0.31,"total_generation_gwh":30468.303,"basis":"share of electricity GENERATED, main activity producers, ECCC Annex 7","stated_fuel_mix_on_this_record_is":"a different and unsourced quantity. It is not known to be a generation share, and where the two can be compared they differ in both directions."}},"partial_cost_verified":null,"cost_pillar_calculation":null,"evidence":{"source_reliability":"Moderate","coverage":"Partial","coverage_dimensions":1,"last_reviewed":"June 2026","measured_layers":1,"data_layers":2,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability review","method":"modelled","vintage":"2025","freshness":"Fresh","source_url":null},{"layer":"Large-user tariff","method":"administered","vintage":"2026","freshness":"Fresh","source_url":"https://www.hydro.mb.ca/accounts_and_services/rates/"}]},"outlook":"Stable","confidence":"High","under_review":false,"thesis":"The cheapest power on the board and an open, clean grid. The limit is size: a small system can only absorb so much 100 MW-plus load, and large-load demand here is still early.","pillars":{"access":68,"availability":70,"cost":98,"momentum":35,"carbon":99},"pillar_rationale":{"access":"Open access: Manitoba Hydro welcomes large load.","availability":"Good margin on paper, but a small absolute system.","cost":"Analyst assessment (no comparable delivered-cost band yet): The cheapest power of any market here.","momentum":"Nascent momentum.","carbon":"Near-zero operational carbon (~4 g), hydro."},"reads":{"build":"Build score 68/100","sell":"Offtake grade C (index 54/100)","plan":"Load pressure: Light","monitor":null},"offtake_opportunity_index":54,"demand_hunger":24,"build_feasibility":68,"supplier_signals":{"bess_arbitrage_usd_mwh":3,"bess_arbitrage_pct":60,"solar_capture_pct":90,"wind_capture_pct":101},"outlook_drivers":{"upgrade":["Early data-center wins prove the market.","Surplus hydro keeps prices low."],"downgrade":["Small-system ceiling for hyperscale.","Remote location limits ecosystem."]},"risks":["Scale ceiling.","Thin ecosystem and remoteness."],"peers":{"like":"British Columbia (cheap clean hydro)","ahead":"on price","behind":"on scale and ecosystem"},"sources":[{"label":"Manitoba Hydro / CER","url":"https://www.cer-rec.gc.ca/"}],"latest_action":{"date":"June 2026","type":"New rating","note":"New rating: Tier 2 Strong assigned.","trigger":null},"grid":{"price_usd_mwh":5,"carbon_intensity_g":3,"renewable_pct":99,"renewable_generation_share_pct":99,"low_carbon_generation_share_pct":99,"fuel_mix":{"hydro":96,"wind":3,"gas":1},"demand_mw":3600,"capacity_mw":8500,"imports_mw":200,"exports_mw":1200,"firm_capacity_mw":null,"firm_capacity_availability":"insufficient_evidence","firm_capacity_basis":null,"est_peak_mw":5112,"firm_headroom_mw":null,"firm_headroom_availability":"dependency_unavailable","peak_stress_pct":null,"peak_stress_availability":"dependency_unavailable","adequacy_required_input":"capacity_mix_mw with a declared basis, or an official dependable or accredited capacity from the operator","price_cycle":"hydro","price_basis":"not_reviewed","price_absent_reason":null,"price_source":"modelled-baseline","price_as_of":null,"price_vintage":"undated_modelled_baseline","price_is_live":false,"carbon_intensity_unit":"gCO2eq/kWh","carbon_measurement_boundary":"operational_combustion","carbon_calculation_method":"official_inventory_generation_intensity","carbon_emission_factor_source":null,"carbon_basis_withdrawn":false,"carbon_imports_treatment":"not_accounted","carbon_provenance_state":"observed","carbon_decision_eligibility":"production_cohort_only","carbon_confidence":"high","source":"modelled-baseline","carbon_evidence_state":"official_production_intensity","carbon_emission_factor_note":null,"carbon_source_authority":"Environment and Climate Change Canada","carbon_source_document":"National Inventory Report 1990-2024: Greenhouse Gas Sources and Sinks in Canada, Annex 7 - Electricity in Canada: Summary and Intensity Tables","carbon_source_url":"https://open.canada.ca/data/en/dataset/779c7bcf-4982-47eb-af1b-a33618a05e5b","carbon_reference_year":2024,"carbon_reference_year_note":"preliminary in the source; revised in the next inventory","carbon_correction":"carbon-correction-2.0-eccc-sourced","figures":{"price_usd_mwh":{"value":5,"unit":"USD/MWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"High","stable_id":"pgiq:manitoba:price_usd_mwh:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"carbon_intensity_g":{"value":3,"unit":"gCO2/kWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"High","stable_id":"pgiq:manitoba:carbon_intensity_g:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"renewable_pct":{"value":99,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"High","stable_id":"pgiq:manitoba:renewable_pct:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"renewable_generation_share_pct":{"value":99,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"High","stable_id":"pgiq:manitoba:renewable_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"low_carbon_generation_share_pct":{"value":99,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"High","stable_id":"pgiq:manitoba:low_carbon_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"demand_mw":{"value":3600,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"High","stable_id":"pgiq:manitoba:demand_mw:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"capacity_mw":{"value":8500,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"High","stable_id":"pgiq:manitoba:capacity_mw:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"imports_mw":{"value":200,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"High","stable_id":"pgiq:manitoba:imports_mw:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"exports_mw":{"value":1200,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"High","stable_id":"pgiq:manitoba:exports_mw:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"est_peak_mw":{"value":5112,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"High","stable_id":"pgiq:manitoba:est_peak_mw:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"firm_headroom_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"High","stable_id":"pgiq:manitoba:firm_headroom_mw:2026-06","report_url":"https://powergridiq.com/rating/manitoba","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."},"peak_stress_pct":{"value":null,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"High","stable_id":"pgiq:manitoba:peak_stress_pct:2026-06","report_url":"https://powergridiq.com/rating/manitoba","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."}}},"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"not_assessed","overall_permits":"Not assessed. Treat as an open diligence item; absence of a finding is not evidence of low risk.","insufficient_evidence":true,"unassessed_required_fields":["cost","connection"],"project_ready":false,"blocking_fields":["cost","connection","reliability"],"fields":{"cost":"not_assessed","connection":"not_assessed","reliability":"M2 Compiled","carbon":"M2 Compiled","regulatory":"not_assessed","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","carbon"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: cost, connection, local capacity"}},"reliability_layers":{"bulk_historical":{"state":"unknown","method":null},"forward_adequacy":{"state":"held","method":"modelled"},"local_delivery":{"state":"unknown","method":null},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2027-05-15","report_url":"https://powergridiq.com/rating/manitoba","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"insufficient_evidence","label":"Insufficient evidence","means":"No band is published because the available evidence does not support one.","reproducible":false},"component":null,"cost_pillar":{"state":"analyst_assessment","label":"Analyst assessment","means":"The score is a judgement recorded with a written cost-specific rationale. It is not calculated from a formula and does not claim to be.","reproducible":false},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"High","stable_id":"pgiq:manitoba:tier:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"score":{"value":70,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"High","stable_id":"pgiq:manitoba:score:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"pillar_score":{"value":73,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"High","stable_id":"pgiq:manitoba:pillar_score:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"pillar_tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"High","stable_id":"pgiq:manitoba:pillar_tier:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"reliability_dock":{"value":3,"unit":"points_deducted","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"High","stable_id":"pgiq:manitoba:reliability_dock:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"offtake_opportunity_index":{"value":54,"unit":"index_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"derived","confidence":"High","stable_id":"pgiq:manitoba:offtake_opportunity_index:2026-06","report_url":"https://powergridiq.com/rating/manitoba"},"realized_cost":{"value":null,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"applicable_evidence_incomplete","confidence":"High","stable_id":"pgiq:manitoba:realized_cost:2026-06","report_url":"https://powergridiq.com/rating/manitoba","absence":"insufficient_evidence","reason_text":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours."}},"figure_contract_version":"1.0"}