{"id":"newfoundland","rid":"NL","name":"Newfoundland & Labrador","flag":"🇨🇦","group":"canada","type":"market","parent":null,"regions":null,"tier_range":null,"tier":3,"tier_name":"Workable","score":58,"pillar_score":61,"pillar_tier":3,"pillar_tier_name":"Workable","tier_cap":null,"reliability":{"assessed":true,"level":"watch","dock":3,"provisional":false,"confidence":"Low","delivery_transmission":{"level":"none"},"delivery_distribution":{"level":"none"},"forward_capacity":{"level":"watch","measure":"modelled","note":"Modelled read: hydro-heavy but small and isolated, with a Muskrat Falls commissioning history."},"read":"Minor flags found","level_means":"reviewed; flags found"},"reliability_dock":3,"regulatory_momentum":null,"scheduled_changes":[{"date":"End 2026","event":"Definitive binding agreements on Churchill Falls and Gull Island targeted","why":"The 17 Aug 2026 agreement is non-binding. Execution is what triggers the Major Projects Office referral, the federal loan guarantee for Gull Island and the provincial electricity rebate.","source":{"label":"VOCM","url":"https://vocm.com/2026/08/17/cf-deal-draft/"}},{"date":"By Oct 2026","event":"Quebec general election, a live risk to the counterparty's position","why":"The Parti Quebecois government, sworn in on 21 Oct 2026, says it will review the agreement and bring it to the National Assembly. A change of government in Quebec before binding agreements are signed is the single largest execution risk to the deal.","source":{"label":"VOCM","url":"https://vocm.com/2026/08/18/307309/"}},{"date":"On binding agreements","event":"$1 billion federal commitment to a Labrador West transmission line","why":"Stated as necessary to open new mining and industrial projects in the Labrador Trough. This, not Gull Island, is the near-term item that would change what a large load can actually connect to in Labrador.","source":{"label":"Government of Newfoundland and Labrador","url":"https://www.gov.nl.ca/releases/2026/exec/0817n01/"}},{"date":"Through the early 2040s","event":"Gull Island and associated build, on Ottawa's own GDP timeline","why":"The 14,000 MW figure is a multi-decade construction programme, not near-term supply. A load siting in the next few years should price the existing system, not the announcement.","source":{"label":"Prime Minister of Canada","url":"https://www.pm.gc.ca/en/news/news-releases/2026/08/17/prime-minister-carney-announces-largest-clean-energy-investment-north"}},{"date":"No date set","event":"CFX feasibility study on expanding the Churchill Falls plant","why":"The expansion was removed from the agreement and has no commercial arrangements; treat it as optionality, not capacity.","source":{"label":"VOCM","url":"https://vocm.com/2026/08/17/cf-deal-draft/"}}],"queue":null,"friction":null,"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":null,"territory_count":0},"reliability_metrics":null,"forward_cost":null,"tariff":null,"realized_cost":null,"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":{"publisher":"Environment and Climate Change Canada","publication":"National Inventory Report 1990-2024: Greenhouse Gas Sources and Sinks in Canada","table":"A7-2","jurisdiction":"Newfoundland and Labrador","year":"2024","preliminary":true,"unit":"gCO2eq/kWh","boundary":"operational_combustion","boundary_label":"generation_intensity","boundary_quote":"A “generation intensity” indicator is derived to reflect the GHG emissions intensity of electricity as it is delivered to the electricity grid.","generation_intensity":16.042,"consumption_intensity_not_adopted":17.043,"why_consumption_not_adopted":"SF6 is not combustion, and the denominator is not generation. This is a wider boundary than operational_combustion. Publishing it as if it were operational would repeat the mixed-boundary defect corrected on 8 September.","scope_excludes":"autoproducers (main activity producers only)","licence":"Open Government Licence - Canada","url":"https://data-donnees.ec.gc.ca/data/substances/monitor/canada-s-official-greenhouse-gas-inventory/C-Tables-Electricity-Canada-Provinces-Territories/","read_on":"2026-09-09","published_value":16,"published_value_basis":"official_inventory_rounded","official_value":16,"difference_published_minus_official":0,"which_one_is_served_by_this_api":"official_value_rounded","adoption_status":"adopted","adopted_on":"2026-09-28","why_not_adopted":null,"what_this_means_for_the_rating":"Nothing either way. carbon_intensity_g is not an input to the PGIQ Rating -- the carbon pillar is a separate, assessed field -- so neither the published value nor the official one moves a tier, score, pillar or outlook.","caveats":["Annex 7 states: \"The analysis in this section only includes main activity producers.\" Autoproducers -- industrial sites generating for their own use, such as pulp mills and refinery cogeneration -- are excluded from both the emissions and the generation. A grid average that included them would differ, and in a province with heavy industrial self-generation it would differ materially.","The 2024 column carries footnote a, \"Preliminary data\". It is the current official figure and it is expected to be revised in a later submission.","Annex 7 footnote 1: Statistics Canada occasionally revises historic data, which can change values across the whole series, not just the latest year. A figure adopted from this table is a figure that will move."],"observed_generation_mix_2024":{"gas_pct":0,"coal_pct":0,"all_combustion_pct":1.87,"total_generation_gwh":41517.352,"basis":"share of electricity GENERATED, main activity producers, ECCC Annex 7","stated_fuel_mix_on_this_record_is":"a different and unsourced quantity. It is not known to be a generation share, and where the two can be compared they differ in both directions."}},"partial_cost_verified":null,"cost_pillar_calculation":null,"evidence":{"source_reliability":"Low","coverage":"Partial","coverage_dimensions":1,"last_reviewed":"23 Oct 2026","measured_layers":0,"data_layers":1,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability review","method":"modelled","vintage":"2025","freshness":"Fresh","source_url":null}]},"outlook":"Stable","confidence":"Med","under_review":false,"thesis":"The headline hydro surplus is misleading: Churchill Falls output is largely contracted and exported, the island grid is separate and remote, and Muskrat Falls has been troubled. Deliverable power for a new island load is limited despite the paper surplus.","pillars":{"access":52,"availability":55,"cost":93,"momentum":22,"carbon":99},"pillar_rationale":{"access":"Limited access: remote, separate island grid; Labrador hydro is contracted/exported.","availability":"Constrained deliverable availability despite a large paper surplus.","cost":"Analyst assessment (no comparable delivered-cost band yet): Cheap power.","momentum":"Little momentum.","carbon":"Near-zero operational carbon (~10 g), hydro."},"reads":{"build":"Build score 52/100","sell":"Offtake grade C (index 49/100)","plan":"Load pressure: Light","monitor":null},"offtake_opportunity_index":49,"demand_hunger":27,"build_feasibility":52,"supplier_signals":{"bess_arbitrage_usd_mwh":5,"bess_arbitrage_pct":60,"solar_capture_pct":90,"wind_capture_pct":101},"outlook_drivers":{"upgrade":["Churchill Falls contract changes free deliverable surplus (post-2041).","Grid and transmission investment improves deliverability."],"downgrade":["Continued contracted/exported hydro.","Island-grid reliability issues."]},"risks":["Contracted hydro and deliverability.","Remoteness and island-grid constraints."],"peers":{"like":"remote hydro provinces","ahead":"on raw clean power","behind":"on deliverable access"},"sources":[{"label":"CER provincial data","url":"https://www.cer-rec.gc.ca/"}],"latest_action":{"date":"Oct 2026","type":"Affirmed","note":"Affirmed, no change, 23 Oct 2026. The agreement remains non-binding and no definitive agreement has been signed. Quebec's incoming Parti Quebecois government has said it will review the deal and take it to the National Assembly rather than scrap it. Gull Island is planned for the next decade, outside the outlook window, so under our outlook guard rules a non-binding announcement does not move the tier or the outlook. Revisit when definitive agreements are executed.","trigger":"Churchill Falls and Gull Island Definitive Cooperation and Implementation Agreement, 17 Aug 2026 (non-binding); House of Assembly resolution, 17 Sep 2026; Quebec general election, 5 Oct 2026"},"grid":{"price_usd_mwh":8,"carbon_intensity_g":16,"renewable_pct":98,"renewable_generation_share_pct":98,"low_carbon_generation_share_pct":98,"fuel_mix":{"hydro":92,"wind":4,"gas":2,"biofuel":2},"demand_mw":1700,"capacity_mw":8800,"imports_mw":50,"exports_mw":900,"firm_capacity_mw":null,"firm_capacity_availability":"insufficient_evidence","firm_capacity_basis":null,"est_peak_mw":2414,"firm_headroom_mw":null,"firm_headroom_availability":"dependency_unavailable","peak_stress_pct":null,"peak_stress_availability":"dependency_unavailable","adequacy_required_input":"capacity_mix_mw with a declared basis, or an official dependable or accredited capacity from the operator","price_cycle":"hydro","price_basis":"not_reviewed","price_absent_reason":null,"price_source":"modelled-baseline","price_as_of":null,"price_vintage":"undated_modelled_baseline","price_is_live":false,"carbon_intensity_unit":"gCO2eq/kWh","carbon_measurement_boundary":"operational_combustion","carbon_calculation_method":"official_inventory_generation_intensity","carbon_emission_factor_source":null,"carbon_basis_withdrawn":false,"carbon_imports_treatment":"not_accounted","carbon_provenance_state":"observed","carbon_decision_eligibility":"production_cohort_only","carbon_confidence":"high","source":"modelled-baseline","carbon_evidence_state":"official_production_intensity","carbon_emission_factor_note":null,"carbon_source_authority":"Environment and Climate Change Canada","carbon_source_document":"National Inventory Report 1990-2024: Greenhouse Gas Sources and Sinks in Canada, Annex 7 - Electricity in Canada: Summary and Intensity Tables","carbon_source_url":"https://open.canada.ca/data/en/dataset/779c7bcf-4982-47eb-af1b-a33618a05e5b","carbon_reference_year":2024,"carbon_reference_year_note":"preliminary in the source; revised in the next inventory","carbon_correction":"carbon-correction-2.0-eccc-sourced","figures":{"price_usd_mwh":{"value":8,"unit":"USD/MWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:newfoundland:price_usd_mwh:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"carbon_intensity_g":{"value":16,"unit":"gCO2/kWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:newfoundland:carbon_intensity_g:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"renewable_pct":{"value":98,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:newfoundland:renewable_pct:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"renewable_generation_share_pct":{"value":98,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:newfoundland:renewable_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"low_carbon_generation_share_pct":{"value":98,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:newfoundland:low_carbon_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"demand_mw":{"value":1700,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:newfoundland:demand_mw:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"capacity_mw":{"value":8800,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:newfoundland:capacity_mw:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"imports_mw":{"value":50,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:newfoundland:imports_mw:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"exports_mw":{"value":900,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:newfoundland:exports_mw:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"est_peak_mw":{"value":2414,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:newfoundland:est_peak_mw:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"firm_headroom_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:newfoundland:firm_headroom_mw:2026-06","report_url":"https://powergridiq.com/rating/newfoundland","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."},"peak_stress_pct":{"value":null,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:newfoundland:peak_stress_pct:2026-06","report_url":"https://powergridiq.com/rating/newfoundland","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."}}},"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"not_assessed","overall_permits":"Not assessed. Treat as an open diligence item; absence of a finding is not evidence of low risk.","insufficient_evidence":true,"unassessed_required_fields":["cost","connection"],"project_ready":false,"blocking_fields":["cost","connection","reliability"],"fields":{"cost":"not_assessed","connection":"not_assessed","reliability":"M2 Compiled","carbon":"M2 Compiled","regulatory":"not_assessed","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","carbon"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: cost, connection, local capacity"}},"reliability_layers":{"bulk_historical":{"state":"unknown","method":null},"forward_adequacy":{"state":"held","method":"modelled"},"local_delivery":{"state":"unknown","method":null},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2027-05-15","report_url":"https://powergridiq.com/rating/newfoundland","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"insufficient_evidence","label":"Insufficient evidence","means":"No band is published because the available evidence does not support one.","reproducible":false},"component":null,"cost_pillar":{"state":"analyst_assessment","label":"Analyst assessment","means":"The score is a judgement recorded with a written cost-specific rationale. It is not calculated from a formula and does not claim to be.","reproducible":false},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:newfoundland:tier:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"score":{"value":58,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:newfoundland:score:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"pillar_score":{"value":61,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:newfoundland:pillar_score:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"pillar_tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:newfoundland:pillar_tier:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"reliability_dock":{"value":3,"unit":"points_deducted","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:newfoundland:reliability_dock:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"offtake_opportunity_index":{"value":49,"unit":"index_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"derived","confidence":"Med","stable_id":"pgiq:newfoundland:offtake_opportunity_index:2026-06","report_url":"https://powergridiq.com/rating/newfoundland"},"realized_cost":{"value":null,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"applicable_evidence_incomplete","confidence":"Med","stable_id":"pgiq:newfoundland:realized_cost:2026-06","report_url":"https://powergridiq.com/rating/newfoundland","absence":"insufficient_evidence","reason_text":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours."}},"figure_contract_version":"1.0"}