{"id":"portugal","rid":"PT","name":"Portugal","flag":"🇵🇹","group":"europe","type":"market","parent":null,"regions":null,"tier_range":null,"tier":3,"tier_name":"Workable","score":57,"pillar_score":64,"pillar_tier":2,"pillar_tier_name":"Strong","tier_cap":null,"reliability":{"assessed":true,"level":"elevated","dock":7,"provisional":false,"confidence":"High","delivery_transmission":{"level":"elevated","measure":"event-based","note":"Swept up in the April 28, 2025 Iberian blackout, which cut power across mainland Portugal for about ten hours when the Spanish grid collapsed, since Portugal is tightly coupled to the Spanish system.","sources":[{"label":"2025 Iberian blackout, ENTSO-E expert panel","url":"https://www.entsoe.eu/news/2025/10/03/28-april-blackout-in-spain-and-portugal-expert-panel-releases-comprehensive-factual-report/"}]},"delivery_distribution":{"level":"none"},"forward_capacity":{"level":"watch","measure":"modelled","note":"Reliability is tied to the Spanish system and to the shared reforms following the 2025 event."},"read":"Reliability flags found","level_means":"reviewed; flags found"},"reliability_dock":7,"regulatory_momentum":null,"scheduled_changes":null,"queue":null,"friction":null,"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":null,"territory_count":0},"reliability_metrics":null,"forward_cost":null,"tariff":null,"realized_cost":null,"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":null,"partial_cost_verified":null,"cost_pillar_calculation":null,"evidence":{"source_reliability":"Moderate","coverage":"Partial","coverage_dimensions":1,"last_reviewed":"June 2026","measured_layers":0,"data_layers":1,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability review","method":"historical","vintage":"2025","freshness":"Fresh","source_url":"https://www.entsoe.eu/news/2025/10/03/28-april-blackout-in-spain-and-portugal-expert-panel-releases-comprehensive-factual-report/"}]},"outlook":"Positive","confidence":"Med","under_review":false,"thesis":"Cheap renewables and an open, welcoming market with a marquee build (Start Campus at Sines). A real riser on the Iberian peninsula.","pillars":{"access":68,"availability":68,"cost":62,"momentum":50,"carbon":78},"pillar_rationale":{"access":"Open and welcoming; a major Sines campus anchors the market.","availability":"Good availability with strong renewables.","cost":"Analyst assessment (no comparable delivered-cost band yet): Competitive cost.","momentum":"Building momentum.","carbon":"Clean-ish (~130-150 g)."},"reads":{"build":"Build score 68/100","sell":"Offtake grade A (index 78/100)","plan":"Load pressure: Rising","monitor":null},"offtake_opportunity_index":78,"demand_hunger":42,"build_feasibility":68,"supplier_signals":{"bess_arbitrage_usd_mwh":40,"bess_arbitrage_pct":62,"solar_capture_pct":94,"wind_capture_pct":101},"outlook_drivers":{"upgrade":["Sines and follow-on projects scale.","Atlantic cable connectivity attracts tenants."],"downgrade":["Small-market scale.","Connection constraints."]},"risks":["Scale.","Connection capacity."],"peers":{"like":"Spain (cheap Iberian solar)","ahead":"on openness","behind":"Spain on scale"},"sources":[{"label":"Europe data-center market","url":"https://www.cushmanwakefield.com/en/insights/emea-data-centre-update"}],"latest_action":{"date":"Oct 2026","type":"Downgrade","note":"Tier 2 Strong to Tier 3 Workable under the published tier rules: a PGIQ Rating of 57 sits in the Tier 3 band. No pillar evidence changed; markets with the same score now sit in the same tier.","trigger":"Tier rules published with the Oct 2026 ratings release (equal scores, equal tiers)"},"grid":{"price_usd_mwh":65,"carbon_intensity_g":125,"renewable_pct":76,"renewable_generation_share_pct":76,"low_carbon_generation_share_pct":76,"fuel_mix":{"hydro":28,"wind":27,"solar":14,"gas":22,"biofuel":7,"coal":2},"demand_mw":7200,"capacity_mw":22000,"imports_mw":1000,"exports_mw":2000,"firm_capacity_mw":null,"firm_capacity_availability":"insufficient_evidence","firm_capacity_basis":null,"est_peak_mw":10224,"firm_headroom_mw":null,"firm_headroom_availability":"dependency_unavailable","peak_stress_pct":null,"peak_stress_availability":"dependency_unavailable","adequacy_required_input":"capacity_mix_mw with a declared basis, or an official dependable or accredited capacity from the operator","price_cycle":"other","price_basis":"not_reviewed","price_absent_reason":null,"price_source":"modelled-baseline","price_as_of":null,"price_vintage":"undated_modelled_baseline","price_is_live":false,"carbon_intensity_unit":"gCO2eq/kWh","carbon_measurement_boundary":"operational_combustion","carbon_calculation_method":"structural_estimate","carbon_emission_factor_source":null,"carbon_basis_withdrawn":true,"carbon_imports_treatment":"not_accounted","carbon_provenance_state":"structural","carbon_decision_eligibility":"insufficient_evidence","carbon_confidence":"low","source":"modelled-baseline","figures":{"price_usd_mwh":{"value":65,"unit":"USD/MWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:portugal:price_usd_mwh:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"carbon_intensity_g":{"value":125,"unit":"gCO2/kWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:portugal:carbon_intensity_g:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"renewable_pct":{"value":76,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:portugal:renewable_pct:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"renewable_generation_share_pct":{"value":76,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:portugal:renewable_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"low_carbon_generation_share_pct":{"value":76,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:portugal:low_carbon_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"demand_mw":{"value":7200,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:portugal:demand_mw:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"capacity_mw":{"value":22000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:portugal:capacity_mw:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"imports_mw":{"value":1000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:portugal:imports_mw:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"exports_mw":{"value":2000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:portugal:exports_mw:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"est_peak_mw":{"value":10224,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:portugal:est_peak_mw:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"firm_headroom_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:portugal:firm_headroom_mw:2026-06","report_url":"https://powergridiq.com/rating/portugal","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."},"peak_stress_pct":{"value":null,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:portugal:peak_stress_pct:2026-06","report_url":"https://powergridiq.com/rating/portugal","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."}}},"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"not_assessed","overall_permits":"Not assessed. Treat as an open diligence item; absence of a finding is not evidence of low risk.","insufficient_evidence":true,"unassessed_required_fields":["cost","connection"],"project_ready":false,"blocking_fields":["cost","connection","reliability"],"fields":{"cost":"not_assessed","connection":"not_assessed","reliability":"M2 Compiled","carbon":"M2 Compiled","regulatory":"not_assessed","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","carbon"],"insufficient_evidence":true,"why":"not assessed here: cost, connection"},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: cost, connection, local capacity"}},"reliability_layers":{"bulk_historical":{"state":"held","method":"event-based"},"forward_adequacy":{"state":"held","method":"modelled"},"local_delivery":{"state":"unknown","method":null},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2027-05-15","report_url":"https://powergridiq.com/rating/portugal","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"insufficient_evidence","label":"Insufficient evidence","means":"No band is published because the available evidence does not support one.","reproducible":false},"component":null,"cost_pillar":{"state":"analyst_assessment","label":"Analyst assessment","means":"The score is a judgement recorded with a written cost-specific rationale. It is not calculated from a formula and does not claim to be.","reproducible":false},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:portugal:tier:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"score":{"value":57,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:portugal:score:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"pillar_score":{"value":64,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:portugal:pillar_score:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"pillar_tier":{"value":2,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:portugal:pillar_tier:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"reliability_dock":{"value":7,"unit":"points_deducted","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:portugal:reliability_dock:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"offtake_opportunity_index":{"value":78,"unit":"index_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"derived","confidence":"Med","stable_id":"pgiq:portugal:offtake_opportunity_index:2026-06","report_url":"https://powergridiq.com/rating/portugal"},"realized_cost":{"value":null,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"applicable_evidence_incomplete","confidence":"Med","stable_id":"pgiq:portugal:realized_cost:2026-06","report_url":"https://powergridiq.com/rating/portugal","absence":"insufficient_evidence","reason_text":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours."}},"figure_contract_version":"1.0"}