{"id":"taiwan","rid":"TW","name":"Taiwan","flag":"🇹🇼","group":"asia","type":"market","parent":null,"regions":null,"tier_range":null,"tier":4,"tier_name":"Constrained","score":40,"pillar_score":44,"pillar_tier":4,"pillar_tier_name":"Constrained","tier_cap":null,"reliability":{"assessed":true,"level":"watch","dock":4,"provisional":false,"confidence":"Low","delivery_transmission":{"level":"watch","measure":"modelled","note":"Modelled read: a tight island grid with priority industrial load and recent large outages (2021-2022) and thin reserve."},"delivery_distribution":{"level":"none"},"forward_capacity":{"level":"none"},"read":"Minor flags found","level_means":"reviewed; flags found"},"reliability_dock":4,"regulatory_momentum":null,"scheduled_changes":null,"queue":null,"friction":{"level":"Severe","wait":"3-5 years","measure":"proxy","has_detail":true},"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":"administered","territory_count":0},"reliability_metrics":null,"forward_cost":null,"tariff":{"usd_per_kwh":0.133,"native":"NT$4.27 per kWh","basis":"administered, Taipower industrial rate","figures":{"usd_per_kwh":{"value":0.133,"unit":"USD/kWh (published tariff)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"published","confidence":"Med","stable_id":"pgiq:taiwan:usd_per_kwh:2026-06","report_url":"https://powergridiq.com/rating/taiwan"}}},"realized_cost":{"low_usd_per_mwh":128,"mid_usd_per_mwh":133,"high_usd_per_mwh":140,"aggregation":"band","estimate_usd_per_mwh":null,"estimate_kind_note":null,"total_derivation":"compiled_band_allocated_across_categories","total_derivation_note":"The band is the compiled result and the component lines apportion its midpoint, which is why they sum exactly.","tariff_basis":null,"scenarios":null,"confidence":"administered","public_fragments":1,"contributed_points":0,"basis":"USD per MWh recurring, delivered to the standard 100 MW high-load-factor case, excluding customer-funded connection capital and excluding refundable taxes","figures":{"low_usd_per_mwh":{"value":128,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"administered","stable_id":"pgiq:taiwan:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"mid_usd_per_mwh":{"value":133,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"administered","stable_id":"pgiq:taiwan:mid_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"high_usd_per_mwh":{"value":140,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"administered","stable_id":"pgiq:taiwan:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/taiwan"}}},"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":null,"partial_cost_verified":null,"cost_pillar_calculation":{"method":"cost-rescore-1.1","rubric_version":"cost-rescore-1.1","rule":"Cost pillar = 90 at $50/MWh, 35 at $150/MWh, straight line, kept within 35-95, scored on the band midpoint.","input_usd_per_mwh":133,"input_mid_usd_per_mwh":133,"level_score":44.35,"direction":"stable","direction_adjustment":0,"observability":"estimated_allocation","observability_adjustment":0,"cost_pillar":44,"arithmetic":"44.35 +0 +0 = 44","band_low_usd_per_mwh":128,"band_high_usd_per_mwh":140,"score_at_band_low":47,"score_at_band_high":41,"previous_cost_pillar":25},"evidence":{"source_reliability":"Moderate","coverage":"Full","coverage_dimensions":3,"last_reviewed":"June 2026","measured_layers":2,"data_layers":4,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability review","method":"modelled","vintage":"2025","freshness":"Fresh","source_url":null},{"layer":"Connection friction","method":"proxy","vintage":"2025/26","freshness":"Fresh","source_url":"https://caprifoundation.org/the-energy-paradox-of-taiwans-sovereign-ai-ambition/"},{"layer":"Large-user tariff","method":"administered","vintage":"2025/26","freshness":"Fresh","source_url":"https://www.taipeitimes.com/News/front/archives/2026/03/28/2003854601"},{"layer":"Realized cost","method":"measured","vintage":"2026","freshness":"Fresh","source_url":"https://www.taipeitimes.com/News/front/archives/2026/03/28/2003854601"}]},"outlook":"Stable","confidence":"Med","under_review":false,"thesis":"A tight grid with TSMC as priority load, expensive power and limited room for new hyperscale.","pillars":{"access":45,"availability":40,"cost":44,"momentum":45,"carbon":43},"pillar_rationale":{"access":"Constrained access; TSMC competes for power.","availability":"Tight availability on an island grid.","cost":"Scored from what a 100 MW load actually pays here once grid fees, taxes and other charges are added, not from the wholesale price: about $133 per MWh (band $128 to $140). On the PGIQ cost scale ($50 per MWh scores 90, $150 per MWh scores 35) that gives 44. At the cheap end of the band it would score 47; at the dear end, 41.","momentum":"Moderate momentum.","carbon":"Carbon moderate-high (~400 g)."},"reads":{"build":"Build score 22/100","sell":"Offtake grade C (index 41/100)","plan":"Load pressure: Rising","monitor":"Grid strength: Watch (48/100)"},"offtake_opportunity_index":41,"demand_hunger":50,"build_feasibility":22,"supplier_signals":{"bess_arbitrage_usd_mwh":59,"bess_arbitrage_pct":62,"solar_capture_pct":108,"wind_capture_pct":99},"outlook_drivers":{"upgrade":["Renewables and LNG build add supply.","Grid reinforcement."],"downgrade":["TSMC priority and island constraints.","Cost."]},"risks":["Supply adequacy and TSMC competition.","Geopolitics."],"peers":{"like":"tight island grids","ahead":"on tech ecosystem","behind":"on availability"},"sources":[{"label":"Regional grid data","url":"https://www.iea.org/"}],"latest_action":{"date":"Oct 2026","type":"Affirmed","note":"Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 35 to 40. Tier 4 Constrained unchanged.","trigger":"Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release","release":"ratings-release-2026-cost"},"grid":{"price_usd_mwh":95,"carbon_intensity_g":570,"renewable_pct":14,"renewable_generation_share_pct":14,"low_carbon_generation_share_pct":14,"fuel_mix":{"gas":48,"coal":34,"solar":5,"wind":4,"hydro":3,"biofuel":2,"oil":2,"storage":2},"demand_mw":33000,"capacity_mw":62000,"imports_mw":0,"exports_mw":0,"imports_state":"isolated","exports_state":"isolated","cross_border_note":"No international interconnection: Taiwan's grid is electrically isolated.","cross_border_link":"none","firm_capacity_mw":null,"firm_capacity_availability":"insufficient_evidence","firm_capacity_basis":null,"est_peak_mw":46860,"firm_headroom_mw":null,"firm_headroom_availability":"dependency_unavailable","peak_stress_pct":null,"peak_stress_availability":"dependency_unavailable","adequacy_required_input":"capacity_mix_mw with a declared basis, or an official dependable or accredited capacity from the operator","price_cycle":"other","price_basis":"not_reviewed","price_absent_reason":null,"price_source":"modelled-baseline","price_as_of":null,"price_vintage":"undated_modelled_baseline","price_is_live":false,"carbon_intensity_unit":"gCO2eq/kWh","carbon_measurement_boundary":"operational_combustion","carbon_calculation_method":"structural_estimate","carbon_emission_factor_source":null,"carbon_basis_withdrawn":true,"carbon_imports_treatment":"not_accounted","carbon_provenance_state":"structural","carbon_decision_eligibility":"insufficient_evidence","carbon_confidence":"low","source":"modelled-baseline","figures":{"price_usd_mwh":{"value":95,"unit":"USD/MWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:taiwan:price_usd_mwh:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"carbon_intensity_g":{"value":570,"unit":"gCO2/kWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:taiwan:carbon_intensity_g:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"renewable_pct":{"value":14,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:taiwan:renewable_pct:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"renewable_generation_share_pct":{"value":14,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:taiwan:renewable_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"low_carbon_generation_share_pct":{"value":14,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:taiwan:low_carbon_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"demand_mw":{"value":33000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:taiwan:demand_mw:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"capacity_mw":{"value":62000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:taiwan:capacity_mw:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"imports_mw":{"value":0,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:taiwan:imports_mw:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"exports_mw":{"value":0,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:taiwan:exports_mw:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"est_peak_mw":{"value":46860,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:taiwan:est_peak_mw:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"firm_headroom_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:taiwan:firm_headroom_mw:2026-06","report_url":"https://powergridiq.com/rating/taiwan","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."},"peak_stress_pct":{"value":null,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:taiwan:peak_stress_pct:2026-06","report_url":"https://powergridiq.com/rating/taiwan","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."}}},"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"M1 Broad","overall_permits":"Directional only: supports discovery, comparison and monitoring, not a project decision.","insufficient_evidence":false,"unassessed_required_fields":[],"project_ready":false,"blocking_fields":["cost","connection","reliability"],"fields":{"cost":"M2 Compiled","connection":"M1 Broad","reliability":"M2 Compiled","carbon":"M2 Compiled","regulatory":"not_assessed","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection"],"insufficient_evidence":false,"why":""},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":false,"why":""},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":false,"why":""},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability","carbon"],"insufficient_evidence":false,"why":""},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: local capacity"}},"reliability_layers":{"bulk_historical":{"state":"held","method":"modelled"},"forward_adequacy":{"state":"unknown","method":null},"local_delivery":{"state":"unknown","method":null},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2027-09-15","report_url":"https://powergridiq.com/rating/taiwan","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"estimated","label":"Estimated","means":"The band is an analyst estimate against a stated reasoning, not a sourced figure.","reproducible":false},"component":null,"cost_pillar":{"state":"rubric_derived","label":"Rubric derived","means":"The score is reproduced from a declared rubric, stored inputs and a published formula, and a gate asserts the published score and the rubric agree.","reproducible":true},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."},"in_cost_comparison":{"value":true,"reason_code":null,"reason_text":null},"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:taiwan:tier:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"score":{"value":40,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:taiwan:score:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"pillar_score":{"value":44,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:taiwan:pillar_score:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"pillar_tier":{"value":4,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:taiwan:pillar_tier:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"reliability_dock":{"value":4,"unit":"points_deducted","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:taiwan:reliability_dock:2026-06","report_url":"https://powergridiq.com/rating/taiwan"},"offtake_opportunity_index":{"value":41,"unit":"index_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"derived","confidence":"Med","stable_id":"pgiq:taiwan:offtake_opportunity_index:2026-06","report_url":"https://powergridiq.com/rating/taiwan"}},"figure_contract_version":"1.0"}