{"id":"uae","rid":"AE","name":"United Arab Emirates","flag":"🇦🇪","group":"middle_east","type":"market","parent":null,"regions":null,"tier_range":null,"tier":1,"tier_name":"Prime","score":74,"pillar_score":77,"pillar_tier":1,"pillar_tier_name":"Prime","tier_cap":null,"reliability":{"assessed":true,"level":"watch","dock":3,"provisional":false,"confidence":"Med","delivery_transmission":{"level":"none"},"delivery_distribution":{"level":"none","measure":"measured","note":"World-leading delivery reliability in the main load centre: DEWA (Dubai) reported customer minutes lost of 0.82 minutes per year in 2025, a global record, versus roughly 15 minutes at leading EU utilities.","sources":[{"label":"DEWA world-record CML (Arabian Business)","url":"https://www.arabianbusiness.com/business/energy/dewa-sets-world-record-with-0-82-minutes-lowest-annual-power-outage-in-dubai"}]},"forward_capacity":{"level":"watch","measure":"modelled","note":"Firm baseload is strong (Barakah nuclear supplies about 25% of national electricity, roughly 5.6 GW), but extreme-heat cooling demand drives high summer peaks; capacity is expanding to match.","sources":[{"label":"Barakah at ~25% of UAE electricity (World Nuclear Assoc.)","url":"https://world-nuclear.org/information-library/country-profiles/countries-t-z/united-arab-emirates"}]},"read":"Minor flags found","level_means":"reviewed; flags found"},"reliability_dock":3,"regulatory_momentum":null,"scheduled_changes":[{"date":"2026","event":"First 200 MW of the Stargate UAE campus targeted for energization","why":"The initial tranche of the 5 GW Abu Dhabi build; confirms the pace of the Tier 1 momentum.","source":{"label":"OpenAI","url":"https://openai.com/index/introducing-stargate-uae/"}}],"queue":null,"friction":{"level":"Low","wait":"1-3 years","measure":"proxy","has_detail":true},"connection_pathway":null,"service_evidence":{"contractual_service_held":false,"local_capacity_state":"not_assessed","local_capacity_depth":0,"cost_basis":"modelled","territory_count":0},"reliability_metrics":null,"forward_cost":null,"tariff":{"usd_per_kwh":0.08,"native":"about 26 to 32 fils per kWh","basis":"administered, EtihadWE large-load and data-centre incentive rate","figures":{"usd_per_kwh":{"value":0.08,"unit":"USD/kWh (published tariff)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"published","confidence":"Med","stable_id":"pgiq:uae:usd_per_kwh:2026-06","report_url":"https://powergridiq.com/rating/uae"}}},"realized_cost":{"low_usd_per_mwh":50,"mid_usd_per_mwh":65,"high_usd_per_mwh":85,"aggregation":"band","estimate_usd_per_mwh":null,"estimate_kind_note":null,"total_derivation":"compiled_band_allocated_across_categories","total_derivation_note":"The band is the compiled result and the component lines apportion its midpoint, which is why they sum exactly.","tariff_basis":null,"scenarios":null,"confidence":"modelled","public_fragments":2,"contributed_points":0,"basis":"USD per MWh recurring, delivered to the standard 100 MW high-load-factor case, excluding customer-funded connection capital and excluding refundable taxes","figures":{"low_usd_per_mwh":{"value":50,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"modelled","stable_id":"pgiq:uae:low_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/uae"},"mid_usd_per_mwh":{"value":65,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"modelled","stable_id":"pgiq:uae:mid_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/uae"},"high_usd_per_mwh":{"value":85,"unit":"USD/MWh (delivered, 100 MW at 95% load factor, HV)","as_of":"2026-06","source":{"name":"PowerGridIQ cost engine","url":"https://powergridiq.com/cost-methodology"},"method":"estimated","confidence":"modelled","stable_id":"pgiq:uae:high_usd_per_mwh:2026-06","report_url":"https://powergridiq.com/rating/uae"}}},"cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"jurisdiction_evidence":null,"cost_structure":null,"cost_withdrawn":null,"cost_correction":null,"carbon_correction":null,"carbon_official_reference":null,"partial_cost_verified":null,"cost_pillar_calculation":{"method":"cost-rescore-1.1","rubric_version":"cost-rescore-1.1","rule":"Cost pillar = 90 at $50/MWh, 35 at $150/MWh, straight line, kept within 35-95, scored on the band midpoint.","input_usd_per_mwh":65,"input_mid_usd_per_mwh":65,"level_score":81.75,"direction":"stable","direction_adjustment":0,"observability":"estimated_allocation","observability_adjustment":0,"cost_pillar":82,"arithmetic":"81.75 +0 +0 = 82","band_low_usd_per_mwh":50,"band_high_usd_per_mwh":85,"score_at_band_low":90,"score_at_band_high":71,"previous_cost_pillar":90},"evidence":{"source_reliability":"Moderate","coverage":"Full","coverage_dimensions":3,"last_reviewed":"23 Oct 2026","measured_layers":2,"data_layers":4,"layers":[{"layer":"PGIQ Rating opinion","method":"opinion","vintage":"June 2026","freshness":"Current","source_url":"https://powergridiq.com/methodology"},{"layer":"Reliability review","method":"measured","vintage":"2025","freshness":"Fresh","source_url":"https://www.arabianbusiness.com/business/energy/dewa-sets-world-record-with-0-82-minutes-lowest-annual-power-outage-in-dubai"},{"layer":"Connection friction","method":"proxy","vintage":"2025/26","freshness":"Fresh","source_url":"https://www.globalpetrolprices.com/United-Arab-Emirates/electricity_prices/"},{"layer":"Large-user tariff","method":"administered","vintage":"2026","freshness":"Fresh","source_url":"https://etihadwe.ae/en/About/Pages/Tariff.aspx"},{"layer":"Realized cost","method":"modelled","vintage":"2026","freshness":"Fresh","source_url":"https://www.globalpetrolprices.com/United-Arab-Emirates/electricity_prices/"}]},"outlook":"Positive","confidence":"Med","under_review":false,"thesis":"Among the strongest markets anywhere for a large new load: some of the cheapest power on the board, state-backed fast connection, and a wave of AI investment. The one caveat is carbon. A buyer who weights carbon heavily would rank the UAE lower, because the grid runs on gas.","pillars":{"access":82,"availability":70,"cost":82,"momentum":80,"carbon":42},"pillar_rationale":{"access":"State-backed and fast: national champions (G42, Khazna) and a coordinated build mean connection is quick by global standards.","availability":"Adequate and adding: capacity is expanding fast, and Barakah nuclear (~23% of generation) adds firm, low-carbon baseload.","cost":"Scored from what a 100 MW load actually pays here once grid fees, taxes and other charges are added, not from the wholesale price: about $65 per MWh (band $50 to $85). On the PGIQ cost scale ($50 per MWh scores 90, $150 per MWh scores 35) that gives 82. At the cheap end of the band it would score 90; at the dear end, 71.","momentum":"AI-driven momentum: 358 MW operational heading toward ~950 MW by 2028, a ~1.4 GW pipeline including Stargate-class projects.","carbon":"Carbon is moderate (~380 g) thanks to nuclear and solar, but still gas-led; this is the pillar that moves the rating under a carbon lens."},"reads":{"build":"Build score 85/100","sell":"Offtake grade A (index 85/100)","plan":"Load pressure: Rising","monitor":"Grid strength: Adequate (67/100)"},"offtake_opportunity_index":85,"demand_hunger":39,"build_feasibility":85,"supplier_signals":{"bess_arbitrage_usd_mwh":11,"bess_arbitrage_pct":62,"solar_capture_pct":110,"wind_capture_pct":98},"outlook_drivers":{"upgrade":["AI pipeline converts from announced to operational at scale.","Continued nuclear and solar growth keeps lowering grid carbon."],"downgrade":["A carbon-constrained buyer base (EU-tied, hyperscaler RE mandates) reweights away from the region.","Water and cooling constraints in extreme heat."]},"risks":["Carbon profile for RE-mandated tenants.","Concentration in a few state-led developers."],"peers":{"like":"Saudi Arabia (state-backed, cheap, carbon-heavy)","ahead":"ERCOT on carbon-light fundamentals","behind":"Quebec on clean power"},"sources":[{"label":"UAE nuclear share, The National","url":"https://www.thenationalnews.com/news/2025/08/12/uaes-nuclear-contribution-to-electricity-from-zero-to-23/"},{"label":"UAE data-center expansion, DCD","url":"https://www.datacenterdynamics.com/en/news/microsoft-and-g42-expand-data-center-capacity-plans-in-uae-by-200mw/"}],"latest_action":{"date":"Oct 2026","type":"Affirmed","note":"Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 76 to 74. Tier 1 Prime unchanged.","trigger":"Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release","release":"ratings-release-2026-cost"},"grid":{"price_usd_mwh":18,"carbon_intensity_g":400,"renewable_pct":7,"renewable_generation_share_pct":7,"low_carbon_generation_share_pct":27,"fuel_mix":{"gas":71,"nuclear":20,"solar":7,"oil":2},"demand_mw":22000,"capacity_mw":35000,"imports_mw":200,"exports_mw":null,"exports_state":"not_held","cross_border_note":"Member of the GCC Interconnection (GCCIA) and linked to Oman. The modelled import figure stands; exports are not held.","firm_capacity_mw":null,"firm_capacity_availability":"insufficient_evidence","firm_capacity_basis":null,"est_peak_mw":31240,"firm_headroom_mw":null,"firm_headroom_availability":"dependency_unavailable","peak_stress_pct":null,"peak_stress_availability":"dependency_unavailable","adequacy_required_input":"capacity_mix_mw with a declared basis, or an official dependable or accredited capacity from the operator","price_cycle":"other","price_basis":"not_reviewed","price_absent_reason":null,"price_source":"modelled-baseline","price_as_of":null,"price_vintage":"undated_modelled_baseline","price_is_live":false,"carbon_intensity_unit":"gCO2eq/kWh","carbon_measurement_boundary":"operational_combustion","carbon_calculation_method":"structural_estimate","carbon_emission_factor_source":null,"carbon_basis_withdrawn":true,"carbon_imports_treatment":"not_accounted","carbon_provenance_state":"structural","carbon_decision_eligibility":"insufficient_evidence","carbon_confidence":"low","source":"modelled-baseline","figures":{"price_usd_mwh":{"value":18,"unit":"USD/MWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:uae:price_usd_mwh:2026-06","report_url":"https://powergridiq.com/rating/uae"},"carbon_intensity_g":{"value":400,"unit":"gCO2/kWh","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:uae:carbon_intensity_g:2026-06","report_url":"https://powergridiq.com/rating/uae"},"renewable_pct":{"value":7,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:uae:renewable_pct:2026-06","report_url":"https://powergridiq.com/rating/uae"},"renewable_generation_share_pct":{"value":7,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:uae:renewable_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/uae"},"low_carbon_generation_share_pct":{"value":27,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:uae:low_carbon_generation_share_pct:2026-06","report_url":"https://powergridiq.com/rating/uae"},"demand_mw":{"value":22000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:uae:demand_mw:2026-06","report_url":"https://powergridiq.com/rating/uae"},"capacity_mw":{"value":35000,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:uae:capacity_mw:2026-06","report_url":"https://powergridiq.com/rating/uae"},"imports_mw":{"value":200,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:uae:imports_mw:2026-06","report_url":"https://powergridiq.com/rating/uae"},"exports_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"modelled","confidence":"Med","stable_id":"pgiq:uae:exports_mw:2026-06","report_url":"https://powergridiq.com/rating/uae","absence":"not_collected","reason_text":"Member of the GCC Interconnection (GCCIA) and linked to Oman. The modelled import figure stands; exports are not held."},"est_peak_mw":{"value":31240,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:uae:est_peak_mw:2026-06","report_url":"https://powergridiq.com/rating/uae"},"firm_headroom_mw":{"value":null,"unit":"MW","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:uae:firm_headroom_mw:2026-06","report_url":"https://powergridiq.com/rating/uae","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."},"peak_stress_pct":{"value":null,"unit":"percent","as_of":"2026-06","source":{"name":"PowerGridIQ grid baseline and operator feeds","url":"https://powergridiq.com/data-quality"},"method":"derived","confidence":"Med","stable_id":"pgiq:uae:peak_stress_pct:2026-06","report_url":"https://powergridiq.com/rating/uae","absence":"insufficient_evidence","reason_text":"Not enough evidence to publish a value."}}},"evidence_depth":{"use_case":"project_case","use_case_label":"Standardized Project Case","overall":"M1 Broad","overall_permits":"Directional only: supports discovery, comparison and monitoring, not a project decision.","insufficient_evidence":false,"unassessed_required_fields":[],"project_ready":false,"blocking_fields":["cost","connection","reliability"],"fields":{"cost":"M1 Broad","connection":"M1 Broad","reliability":"M2 Compiled","carbon":"M2 Compiled","regulatory":"not_assessed","local_capacity":"not_assessed"},"by_use_case":{"discovery":{"label":"Discovery and monitoring","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection"],"insufficient_evidence":false,"why":""},"market_comparison":{"label":"Market comparison","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":false,"why":""},"project_case":{"label":"Standardized Project Case","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability"],"insufficient_evidence":false,"why":""},"project_case_carbon":{"label":"Project Case with a carbon requirement","matrix_version":"1.0","tier":"M1 Broad","ready":false,"blocking_fields":["cost","connection","reliability","carbon"],"insufficient_evidence":false,"why":""},"site_diligence":{"label":"Conditional site diligence","matrix_version":"1.0","tier":"not_assessed","ready":false,"blocking_fields":["cost","connection","reliability","local_capacity"],"insufficient_evidence":true,"why":"not assessed here: local capacity"}},"reliability_layers":{"bulk_historical":{"state":"unknown","method":null},"forward_adequacy":{"state":"held","method":"modelled"},"local_delivery":{"state":"unknown","method":null},"contractual_service":{"state":"unknown","method":null},"designed_site_resilience":{"state":"unknown","method":null}},"definition_version":"carbon_scope@1.0;connection_process@1.0;cost_archetype@1.0;evidence_tiers@1.0;reliability_layers@1.0","scale":"M1 broad / M2 compiled / M3 project-ready / M4 local; cumulative, so each tier includes the ones below it. Assigned per field from held evidence with provenance. Not a rating strength, confidence score or feasibility conclusion."},"next_review":"2027-11-15","report_url":"https://powergridiq.com/rating/uae","as_of":"June 2026","evidence_layers":{"version":"evidence-layers-1.0","band":{"state":"independently_compiled","label":"Independently compiled","means":"The band is assembled from multiple sourced, dated and applicable published figures. It is not a single benchmark and it is not a tariff reconstruction.","reproducible":"partially"},"component":null,"cost_pillar":{"state":"rubric_derived","label":"Rubric derived","means":"The score is reproduced from a declared rubric, stored inputs and a published formula, and a gate asserts the published score and the rubric agree.","reproducible":true},"layers_are_independent":"Band, component and cost-pillar evidence are separate judgments. A market may have a sound, applicable band and an illustrative component breakdown at the same time. Do not read a component-evidence limitation as a statement about the band."},"in_cost_comparison":{"value":true,"reason_code":null,"reason_text":null},"figures":{"tier":{"value":1,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:uae:tier:2026-06","report_url":"https://powergridiq.com/rating/uae"},"score":{"value":74,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:uae:score:2026-06","report_url":"https://powergridiq.com/rating/uae"},"pillar_score":{"value":77,"unit":"points_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:uae:pillar_score:2026-06","report_url":"https://powergridiq.com/rating/uae"},"pillar_tier":{"value":1,"unit":"tier_1_best_to_5","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:uae:pillar_tier:2026-06","report_url":"https://powergridiq.com/rating/uae"},"reliability_dock":{"value":3,"unit":"points_deducted","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":"Med","stable_id":"pgiq:uae:reliability_dock:2026-06","report_url":"https://powergridiq.com/rating/uae"},"offtake_opportunity_index":{"value":85,"unit":"index_0_100","as_of":"2026-06","source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"derived","confidence":"Med","stable_id":"pgiq:uae:offtake_opportunity_index:2026-06","report_url":"https://powergridiq.com/rating/uae"}},"figure_contract_version":"1.0"}