{"contract_version":"power-feasibility-contract-0.2","request":{"required_mw":100,"target_cod":null,"target_cod_months":null,"max_months_applied":null,"max_cost_usd_per_mwh":null,"min_tier":5,"min_carbon_pillar":null,"group":"canada"},"constraints":{"max_cost_usd_per_mwh":null,"max_months_to_connect":null,"min_tier":5,"min_carbon_pillar":null,"group":"canada"},"summary":"9 of 9 evaluated markets plausibly satisfy your requirement.","caveats":[{"code":"mw_capability_not_assessed","dimension":"mw_capability","text":"Your 100 MW requirement was recorded but NOT tested. PowerGridIQ holds no local connectable-capacity evidence for any market, so no market here has been confirmed able to serve that load. Treat every verdict as conditional on a separate capacity enquiry to the operator."}],"count":9,"entitled":false,"results":[{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"british-columbia","name":"British Columbia","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":70,"outlook":"Positive","carbon_pillar":null,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/british-columbia","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}},"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:british-columbia:tier:undated","report_url":"https://powergridiq.com/rating/british-columbia"},"score":{"value":70,"unit":"points_0_100","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:british-columbia:score:undated","report_url":"https://powergridiq.com/rating/british-columbia"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"manitoba","name":"Manitoba","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":70,"outlook":"Stable","carbon_pillar":null,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/manitoba","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}},"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:manitoba:tier:undated","report_url":"https://powergridiq.com/rating/manitoba"},"score":{"value":70,"unit":"points_0_100","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:manitoba:score:undated","report_url":"https://powergridiq.com/rating/manitoba"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"quebec","name":"Quebec","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":67,"outlook":"Positive","carbon_pillar":null,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/quebec","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Not in the cross-market cost comparison: Quebec's cost review closed Affirmed, no change, on 31 Oct 2026; its band is held out of the comparison until the Régie decides R-4333-2026. Read this market's own report for what it does publish; do not rank it against compared markets.","class":"standardized_observable","band_published":true},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"Quebec's cost review closed Affirmed, no change, on 31 Oct 2026; its band is held out of the comparison until the Régie decides R-4333-2026."},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No component breakdown is published for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"55-115 USD/MWh"},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}},"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:quebec:tier:undated","report_url":"https://powergridiq.com/rating/quebec"},"score":{"value":67,"unit":"points_0_100","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:quebec:score:undated","report_url":"https://powergridiq.com/rating/quebec"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"alberta","name":"Alberta","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":61,"outlook":"Positive","carbon_pillar":null,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/alberta","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"in_cost_comparison":{"value":true,"reason_code":null,"reason_text":null},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Wholesale pool energy","usd_per_mwh":null,"share_pct":68.8,"evidence":"estimated_allocation"},{"name":"Transmission & distribution","usd_per_mwh":null,"share_pct":27.5,"evidence":"estimated_allocation"},{"name":"Riders & other","usd_per_mwh":null,"share_pct":3.8,"evidence":"estimated_allocation"}],"largest_line":"Wholesale pool energy","arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","bundled":[],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of it, shown here as shares, not separately observed figures. Each line's dollar value is on the market's own record at /api/v1/ratings/{id}.","capacity_cross_check":null},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"60-110 USD/MWh"},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}},"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:alberta:tier:undated","report_url":"https://powergridiq.com/rating/alberta"},"score":{"value":61,"unit":"points_0_100","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:alberta:score:undated","report_url":"https://powergridiq.com/rating/alberta"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"ontario","name":"Ontario","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":60,"outlook":"Negative","carbon_pillar":null,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/ontario","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"in_cost_comparison":{"value":true,"reason_code":null,"reason_text":null},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Wholesale energy (HOEP)","usd_per_mwh":null,"share_pct":23.1,"evidence":"estimated_allocation"},{"name":"Global Adjustment","usd_per_mwh":null,"share_pct":61.5,"evidence":"estimated_allocation"},{"name":"Network & delivery","usd_per_mwh":null,"share_pct":11.5,"evidence":"estimated_allocation"},{"name":"Other & regulatory","usd_per_mwh":null,"share_pct":3.8,"evidence":"estimated_allocation"}],"largest_line":"Global Adjustment","arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","bundled":[],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of it, shown here as shares, not separately observed figures. Each line's dollar value is on the market's own record at /api/v1/ratings/{id}.","capacity_cross_check":null},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"55-100 USD/MWh"},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}},"figures":{"tier":{"value":2,"unit":"tier_1_best_to_5","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:ontario:tier:undated","report_url":"https://powergridiq.com/rating/ontario"},"score":{"value":60,"unit":"points_0_100","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:ontario:score:undated","report_url":"https://powergridiq.com/rating/ontario"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"newfoundland","name":"Newfoundland & Labrador","flag":"🇨🇦","group":"canada","tier":3,"tier_name":"Workable","score":58,"outlook":"Stable","carbon_pillar":null,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/newfoundland","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}},"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:newfoundland:tier:undated","report_url":"https://powergridiq.com/rating/newfoundland"},"score":{"value":58,"unit":"points_0_100","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:newfoundland:score:undated","report_url":"https://powergridiq.com/rating/newfoundland"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"new-brunswick","name":"New Brunswick","flag":"🇨🇦","group":"canada","tier":3,"tier_name":"Workable","score":50,"outlook":"Stable","carbon_pillar":null,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/new-brunswick","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}},"figures":{"tier":{"value":3,"unit":"tier_1_best_to_5","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:new-brunswick:tier:undated","report_url":"https://powergridiq.com/rating/new-brunswick"},"score":{"value":50,"unit":"points_0_100","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:new-brunswick:score:undated","report_url":"https://powergridiq.com/rating/new-brunswick"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"saskatchewan","name":"Saskatchewan","flag":"🇨🇦","group":"canada","tier":4,"tier_name":"Constrained","score":45,"outlook":"Stable","carbon_pillar":null,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/saskatchewan","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}},"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:saskatchewan:tier:undated","report_url":"https://powergridiq.com/rating/saskatchewan"},"score":{"value":45,"unit":"points_0_100","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:saskatchewan:score:undated","report_url":"https://powergridiq.com/rating/saskatchewan"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"nova-scotia","name":"Nova Scotia","flag":"🇨🇦","group":"canada","tier":4,"tier_name":"Constrained","score":37,"outlook":"Stable","carbon_pillar":null,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/nova-scotia","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"in_cost_comparison":{"value":false,"reason_code":"applicable_evidence_incomplete","reason_text":"No delivered-cost band has been compiled for these markets yet."},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"No published band","means":"No delivered-cost band is published for this market yet. The archetype can buy the service; the work outstanding is ours.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}},"figures":{"tier":{"value":4,"unit":"tier_1_best_to_5","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:nova-scotia:tier:undated","report_url":"https://powergridiq.com/rating/nova-scotia"},"score":{"value":37,"unit":"points_0_100","as_of":null,"source":{"name":"PowerGridIQ Rating","url":"https://powergridiq.com/methodology"},"method":"rated","confidence":null,"stable_id":"pgiq:nova-scotia:score:undated","report_url":"https://powergridiq.com/rating/nova-scotia"}}}],"evaluated_count":9,"rejected_count":0,"insufficient_evidence_count":0,"rejected":[],"insufficient_evidence":[],"rejection_reasons":{},"note":"Every market in scope is evaluated and carries a verdict: qualifies, does_not_qualify or insufficient_evidence, each with a decisive reason. `results` is the qualifying set; rejected markets are reported rather than omitted. The verdict and its reason are free and every constraint is evaluated server-side against the true figure; only the precise cost midpoints and waits in months across the screened set are the Analyst Desk (add an Analyst Desk key). Any one market's own midpoint and wait in months are free at /api/v1/ratings/{id}.","figure_contract_version":"1.0"}