{"contract_version":"power-feasibility-contract-0.2","request":{"required_mw":100,"target_cod":null,"target_cod_months":null,"max_months_applied":null,"max_cost_usd_per_mwh":null,"min_tier":5,"min_carbon_pillar":null,"group":"canada"},"constraints":{"max_cost_usd_per_mwh":null,"max_months_to_connect":null,"min_tier":5,"min_carbon_pillar":null,"group":"canada"},"summary":"9 of 9 evaluated markets plausibly satisfy your requirement.","caveats":[{"code":"mw_capability_not_assessed","dimension":"mw_capability","text":"Your 100 MW requirement was recorded but NOT tested. PowerGridIQ holds no local connectable-capacity evidence for any market, so no market here has been confirmed able to serve that load. Treat every verdict as conditional on a separate capacity enquiry to the operator."}],"count":9,"entitled":false,"results":[{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"british-columbia","name":"British Columbia","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":70,"outlook":"Positive","carbon_pillar":99,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/british-columbia","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"manitoba","name":"Manitoba","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":70,"outlook":"Stable","carbon_pillar":99,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/manitoba","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"quebec","name":"Quebec","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":67,"outlook":"Positive","carbon_pillar":100,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/quebec","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No component breakdown is published for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"55-115 USD/MWh"},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"ontario","name":"Ontario","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":64,"outlook":"Negative","carbon_pillar":88,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/ontario","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Wholesale energy (HOEP)","usd_per_mwh":null,"share_pct":23.1,"evidence":"estimated_allocation"},{"name":"Global Adjustment","usd_per_mwh":null,"share_pct":61.5,"evidence":"estimated_allocation"},{"name":"Network & delivery","usd_per_mwh":null,"share_pct":11.5,"evidence":"estimated_allocation"},{"name":"Other & regulatory","usd_per_mwh":null,"share_pct":3.8,"evidence":"estimated_allocation"}],"largest_line":"Global Adjustment","arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","bundled":[],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of its midpoint, not separately observed figures.","capacity_cross_check":null},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"55-100 USD/MWh"},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"alberta","name":"Alberta","flag":"🇨🇦","group":"canada","tier":2,"tier_name":"Strong","score":59,"outlook":"Positive","carbon_pillar":62,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/alberta","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Wholesale pool energy","usd_per_mwh":null,"share_pct":68.8,"evidence":"estimated_allocation"},{"name":"Transmission & distribution","usd_per_mwh":null,"share_pct":27.5,"evidence":"estimated_allocation"},{"name":"Riders & other","usd_per_mwh":null,"share_pct":3.8,"evidence":"estimated_allocation"}],"largest_line":"Wholesale pool energy","arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","bundled":[],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of its midpoint, not separately observed figures.","capacity_cross_check":null},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"60-110 USD/MWh"},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"newfoundland","name":"Newfoundland & Labrador","flag":"🇨🇦","group":"canada","tier":3,"tier_name":"Workable","score":58,"outlook":"Stable","carbon_pillar":99,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/newfoundland","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"new-brunswick","name":"New Brunswick","flag":"🇨🇦","group":"canada","tier":3,"tier_name":"Workable","score":50,"outlook":"Stable","carbon_pillar":57,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/new-brunswick","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"saskatchewan","name":"Saskatchewan","flag":"🇨🇦","group":"canada","tier":4,"tier_name":"Constrained","score":45,"outlook":"Stable","carbon_pillar":11,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/saskatchewan","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"nova-scotia","name":"Nova Scotia","flag":"🇨🇦","group":"canada","tier":4,"tier_name":"Constrained","score":37,"outlook":"Stable","carbon_pillar":16,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/nova-scotia","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype, but PowerGridIQ does not publish one for this market yet.","user_action":"There is no band to use here today. The inputs are observable, so this is our work to finish rather than evidence you need to gather -- do not engage the utility on our behalf, and do not treat the absence as a finding about the market. Read cost_evidence_state.remedy for what is outstanding.","class":"standardized_observable","band_published":false},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"not_collected","text":"No delivered-cost record exists for this market."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}}],"evaluated_count":9,"rejected_count":0,"insufficient_evidence_count":0,"rejected":[],"insufficient_evidence":[],"rejection_reasons":{},"note":"Every market in scope is evaluated and carries a verdict: qualifies, does_not_qualify or insufficient_evidence, each with a decisive reason. `results` is the qualifying set; rejected markets are reported rather than omitted. The verdict and its reason are free and every constraint is evaluated server-side against the true figure; only the precise cost midpoints and wait in months are the Analyst Desk (add an Analyst or Pro key)."}