{"contract_version":"power-feasibility-contract-0.2","request":{"required_mw":100,"target_cod":null,"target_cod_months":null,"max_months_applied":null,"max_cost_usd_per_mwh":null,"min_tier":5,"min_carbon_pillar":null,"group":"us"},"constraints":{"max_cost_usd_per_mwh":null,"max_months_to_connect":null,"min_tier":5,"min_carbon_pillar":null,"group":"us"},"summary":"11 of 11 evaluated markets plausibly satisfy your requirement.","caveats":[{"code":"mw_capability_not_assessed","dimension":"mw_capability","text":"Your 100 MW requirement was recorded but NOT tested. PowerGridIQ holds no local connectable-capacity evidence for any market, so no market here has been confirmed able to serve that load. Treat every verdict as conditional on a separate capacity enquiry to the operator."}],"count":11,"entitled":false,"results":[{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"ercot-central","name":"ERCOT Central (Houston & DFW)","flag":"🇺🇸","group":"us","tier":2,"tier_name":"Strong","score":70,"outlook":"Positive","carbon_pillar":45,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/ercot-central","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Wholesale energy","usd_per_mwh":null,"share_pct":72.2,"evidence":"estimated_allocation"},{"name":"Transmission & delivery (4CP)","usd_per_mwh":null,"share_pct":20.8,"evidence":"estimated_allocation"},{"name":"Ancillary services","usd_per_mwh":null,"share_pct":6.9,"evidence":"estimated_allocation"}],"largest_line":"Wholesale energy","arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","bundled":["Transmission & delivery (4CP)"],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of its midpoint, not separately observed figures.","capacity_cross_check":null},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"55-95 USD/MWh"},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"pacific-northwest","name":"Pacific Northwest","flag":"🇺🇸","group":"us","tier":2,"tier_name":"Strong","score":69,"outlook":"Negative","carbon_pillar":88,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":"4-5 years","report_url":"https://powergridiq.com/rating/pacific-northwest","cost_availability":{"label":"Customer-specific cost","means":"Cost here is set by a bilateral arrangement rather than a posted rate, so no standardized band can represent it.","user_action":"Engage the utility directly. No published band is coming, and waiting for one loses time.","class":"customer_specific","band_published":false},"cost_evidence_state":{"state":"inapplicable","answerable":false,"label":"Inapplicable evidence","means":"The evidence we hold cites a tariff or service the standard archetype cannot purchase. It may be accurate about some other customer and still say nothing about this one.","remedy":"Obtain evidence for a service the archetype could actually contract. The existing figures cannot be repaired by recalculation.","also_holds":["applicable_evidence_incomplete"],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"withdrawn","text":"The published band was derived from the Bonneville Power Administration priority-firm rate, which a new large load cannot obtain: federal hydro allocations are largely committed and a new customer would pay a market premium above the federal rate. A tariff the standard archetype cannot purchase may not set a delivered-cost band."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"4-5 years"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"desert-southwest","name":"Desert Southwest (Phoenix)","flag":"🇺🇸","group":"us","tier":2,"tier_name":"Strong","score":69,"outlook":"Positive","carbon_pillar":70,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":"4-5 years","report_url":"https://powergridiq.com/rating/desert-southwest","cost_availability":{"label":"Cost contingent or evolving","means":"The inputs exist but the applicable economics are unsettled: a rate case, a cost review or a market redesign is open and may move them materially.","user_action":"Treat cost as unresolved and track the named proceeding. Do not plan against a figure that a pending decision may change.","class":"contingent_evolving","band_published":false},"cost_evidence_state":{"state":"inapplicable","answerable":false,"label":"Inapplicable evidence","means":"The evidence we hold cites a tariff or service the standard archetype cannot purchase. It may be accurate about some other customer and still say nothing about this one.","remedy":"Obtain evidence for a service the archetype could actually contract. The existing figures cannot be repaired by recalculation.","also_holds":["applicable_evidence_incomplete"],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"withdrawn","text":"The published band blended an effective regulated rate with APS's PROPOSED extra-large-load class of roughly +45%, which the Arizona Corporation Commission has not decided: the rate-case hearing closed 7 July 2026 and the Commission's vote is due by 31 December 2026. A pending proceeding may not set a current delivered cost. The band's primary source was also an ACC large-load workshop rather than a tariff."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"4-5 years"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"ercot-west","name":"ERCOT West (West Texas & Panhandle)","flag":"🇺🇸","group":"us","tier":2,"tier_name":"Strong","score":68,"outlook":"Positive","carbon_pillar":70,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":null,"report_url":"https://powergridiq.com/rating/ercot-west","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Wholesale energy","usd_per_mwh":null,"share_pct":63.6,"evidence":"estimated_allocation"},{"name":"Transmission & delivery (4CP)","usd_per_mwh":null,"share_pct":27.3,"evidence":"estimated_allocation"},{"name":"Ancillary services","usd_per_mwh":null,"share_pct":9.1,"evidence":"estimated_allocation"}],"largest_line":"Wholesale energy","arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","bundled":["Transmission & delivery (4CP)"],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of its midpoint, not separately observed figures.","capacity_cross_check":null},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"42-80 USD/MWh"},"wait_months":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"us-southeast","name":"US Southeast (Atlanta)","flag":"🇺🇸","group":"us","tier":2,"tier_name":"Strong","score":65,"outlook":"Positive","carbon_pillar":60,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":"4-5 years","report_url":"https://powergridiq.com/rating/us-southeast","cost_availability":{"label":"Availability varies by jurisdiction","means":"The jurisdictions inside this region hold different cost-evidence states, in some cases opposite ones. No single regional availability is published, because any one of them would be false somewhere in the footprint.","user_action":"Identify the jurisdiction the site sits in and read that record. Do not apply one jurisdiction's conclusion to the region.","class":"varies_by_jurisdiction","by_jurisdiction":{"georgia":{"name":"Georgia","availability":"customer_specific","evidence_state":"structurally_unavailable"},"north_carolina":{"name":"North Carolina","availability":"contingent_evolving","evidence_state":"contingent_evolving"}},"band_published":false},"cost_evidence_state":{"state":"structurally_unavailable","answerable":false,"label":"Structurally unavailable","means":"No public evidence can establish this cost, because the archetype is contract-served in this market rather than tariff-served. There is no posted figure to find.","remedy":"Filed or executed contract terms, or a published contract-based rate. Searching for a tariff schedule will not close it.","also_holds":["inapplicable","applicable_evidence_incomplete"],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"withdrawn","text":"The band was anchored on a regulated bundled industrial tariff that a new 100 MW load cannot take: Georgia closed its standard schedules to new large loads on 1 February 2025 and requires an individually negotiated contract instead. The band's primary source was also EIA industrial monthly pricing, which may serve only as a lagged validation layer and not as the headline large-load price."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"4-5 years"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"spp","name":"SPP (Southwest Power Pool)","flag":"🇺🇸","group":"us","tier":2,"tier_name":"Strong","score":63,"outlook":"Positive","carbon_pillar":58,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":"4-5 years","report_url":"https://powergridiq.com/rating/spp","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Wholesale energy","usd_per_mwh":null,"share_pct":55.6,"evidence":"estimated_allocation"},{"name":"Transmission & delivery","usd_per_mwh":null,"share_pct":37,"evidence":"estimated_allocation"},{"name":"Ancillary & other","usd_per_mwh":null,"share_pct":7.4,"evidence":"estimated_allocation"}],"largest_line":"Wholesale energy","arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","bundled":["Transmission & delivery"],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of its midpoint, not separately observed figures.","capacity_cross_check":null},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"42-68 USD/MWh"},"wait_months":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"4-5 years"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"miso","name":"MISO (Midwest)","flag":"🇺🇸","group":"us","tier":2,"tier_name":"Strong","score":57,"outlook":"Positive","carbon_pillar":52,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":"4-5 years","report_url":"https://powergridiq.com/rating/miso","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Wholesale energy","usd_per_mwh":null,"share_pct":58.3,"evidence":"estimated_allocation"},{"name":"Transmission & delivery","usd_per_mwh":null,"share_pct":25,"evidence":"estimated_allocation"},{"name":"Capacity (Planning Resource Auction)","usd_per_mwh":null,"share_pct":10,"evidence":"independently_corroborated"},{"name":"Ancillary & other","usd_per_mwh":null,"share_pct":6.7,"evidence":"estimated_allocation"}],"largest_line":"Wholesale energy","arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","bundled":["Transmission & delivery"],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of its midpoint, not separately observed figures.","capacity_cross_check":{"sourced_floor_usd_per_mwh":5.53,"observation":"MISO Planning Resource Auction 2026/27, annualized; North/Central zones","period":"2026/27 planning year","is_floor":true,"agreement":"consistent","note":"No reserve-margin or peak-contribution gross-up is applied, because no cited multiplier is held for this market. The figure is therefore a FLOOR: the archetype's actual capacity obligation is at least this and probably higher."}},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"48-78 USD/MWh"},"wait_months":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"4-5 years"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"northern-virginia","name":"Northern Virginia (PJM)","flag":"🇺🇸","group":"us","tier":2,"tier_name":"Strong","score":52,"outlook":"Negative","carbon_pillar":58,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":"5+ years","report_url":"https://powergridiq.com/rating/northern-virginia","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","scheduled":{"current_state":"standardized_observable","current_cost_observability":"Observable and published. Schedule GS-4, filed 2025-12-09 and effective 2026-01-01, is a bundled cost-of-service tariff that a 100 MW transmission-voltage load takes today. The delivered cost is built from that schedule, the fifteen riders in the current Exhibit of Applicable Riders and applicable Virginia taxes, and published as a point estimate rather than a band.","scheduled_state":"scheduled_change","effective_date":"2027-01-01","decision_status":"final","action":"plan_against","instrument":"Rate Schedule GS-5","authority":"Virginia State Corporation Commission","proceeding":"PUR-2025-00058, final order November 2025 (Dominion biennial review)","source_url":"https://www.scc.virginia.gov/about-the-scc/newsreleases/release/scc-issues-order-on-dev-biennial-review-2025/scc-rules-in-dev-biennial-review-case.html","applicable_threshold":"25 MW or more on a contiguous site AND a load factor of at least 75%. Mandatory for qualifying NEW customers, not elective.","archetype_qualifies":true,"future_cost_observability":"Partial. The rate CLASS, its effective date and its contractual rules are final. The $/kW and $/kWh charges the archetype would pay are not yet established here, so a delivered-cost band cannot be built from this alone.","remaining_unknowns":["GS-5 rate levels for the archetype's voltage and demand.","How the 14-year contract term and exit fees price into a siting decision.","Whether the GS-5 rebuild, when its rates are set, reproduces the GS-4 result or moves it."],"terms_binding_the_archetype":false,"terms_note":"Minimum charges of 85% of contracted distribution and transmission demand and 60% of generation demand do not bind a 95% load factor archetype, whose actual demand sits above every floor. The 14-year term, collateral and exit fees are real commitments and are not a $/MWh figure.","user_instruction":"The proceeding is concluded. GS-5 begins 1 January 2027. Projects expected to take service under the new regime should plan against its mandatory contract and minimum-payment requirements now.","version":"scheduled-change-1.0"},"band_published":true},"cost_evidence_state":{"state":"publication_grade","answerable":true,"label":"Publication grade","means":"Every publication gate is clear: applicability, cost boundary, components with their own provenance, reconciliation and evidence depth.","remedy":null,"also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Schedule GS-4 base, transmission voltage","usd_per_mwh":null,"share_pct":25.2,"evidence":"independently_sourced"},{"name":"Riders, fifteen filed sheets","usd_per_mwh":null,"share_pct":73,"evidence":"independently_sourced"},{"name":"State and local taxes","usd_per_mwh":null,"share_pct":1.6,"evidence":"independently_sourced"},{"name":"Reactive demand (rkVA at 0.95 power factor)","usd_per_mwh":null,"share_pct":0.2,"evidence":"independently_sourced"}],"largest_line":"Riders, fifteen filed sheets","arithmetic_integrity":true,"evidence_reconciliation":"independently_reconciled","bundled":[],"text":"Every component line is read from a named filed rate document and carries its own source. The total is their sum, not an allocation across a compiled band.","capacity_cross_check":null},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk"},"wait_months":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"5+ years"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"caiso","name":"CAISO (California)","flag":"🇺🇸","group":"us","tier":3,"tier_name":"Workable","score":49,"outlook":"Negative","carbon_pillar":68,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":"5+ years","report_url":"https://powergridiq.com/rating/caiso","cost_availability":{"label":"Cost contingent or evolving","means":"The inputs exist but the applicable economics are unsettled: a rate case, a cost review or a market redesign is open and may move them materially.","user_action":"Treat cost as unresolved and track the named proceeding. Do not plan against a figure that a pending decision may change.","class":"contingent_evolving","band_published":true},"cost_evidence_state":{"state":"methodology_unresolved","answerable":"conditionally","label":"Methodology unresolved","means":"The underlying observations exist and are cited, but the correct conversion or treatment for the archetype is not yet established, so the resulting figure is not settled.","remedy":"Resolve the methodology from first principles, then populate. Not a data-collection problem.","also_holds":["applicable_evidence_incomplete"],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":false,"reason":"withheld","text":"The Cost pillar is under review. Realized-cost review of California non-bypassable and delivery charges, Jul 2026. The delivered band is the thing under review, so it stays suppressed."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"95-155 USD/MWh"},"wait_months":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"5+ years"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"nyiso","name":"NYISO (New York)","flag":"🇺🇸","group":"us","tier":3,"tier_name":"Workable","score":48,"outlook":"Negative","carbon_pillar":73,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":"4-5 years","report_url":"https://powergridiq.com/rating/nyiso","cost_availability":{"label":"Standardized cost observable","means":"A comparable recurring-cost band can be built from observable, applicable inputs for the standard archetype.","user_action":"Use the band, with its stated confidence and boundary.","class":"standardized_observable","band_published":true},"cost_evidence_state":{"state":"applicable_evidence_incomplete","answerable":"conditionally","label":"Applicable, evidence incomplete","means":"The archetype can buy the service and the band is sound, but some published figures do not yet carry their own source, date, method and confidence.","remedy":"Finish the per-line provenance. No new access or negotiation is required.","also_holds":[],"vocabulary_version":"evidence-state-1.0"},"cost_breakdown":{"available":true,"lines":[{"name":"Wholesale energy","usd_per_mwh":null,"share_pct":54.7,"evidence":"estimated_allocation"},{"name":"Installed capacity (ICAP)","usd_per_mwh":null,"share_pct":18.9,"evidence":"estimated_allocation"},{"name":"Delivery & network","usd_per_mwh":null,"share_pct":23.2,"evidence":"estimated_allocation"},{"name":"Ancillary & other","usd_per_mwh":null,"share_pct":3.2,"evidence":"estimated_allocation"}],"largest_line":"Wholesale energy","arithmetic_integrity":true,"evidence_reconciliation":"not_independently_reconciled","bundled":[],"text":"The delivered-cost band is the compiled result. The component lines are an estimated allocation of its midpoint, not separately observed figures.","capacity_cross_check":null},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"70-140 USD/MWh"},"wait_months":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"4-5 years"}}},{"verdict":"qualifies","decisive_reason":null,"constraint_trace":[{"dimension":"evidence","outcome":"not_tested"},{"dimension":"time","outcome":"not_tested"},{"dimension":"cost","outcome":"not_tested"},{"dimension":"carbon","outcome":"not_tested"},{"dimension":"mw_capability","outcome":"not_assessed","reason_code":"mw_capability_not_assessed","observed":null,"required":100,"unit":"MW","advisory":true,"note":"PowerGridIQ holds no local connectable-capacity evidence for any market. This dimension was not tested and did not affect the verdict."}],"id":"isone","name":"ISO New England","flag":"🇺🇸","group":"us","tier":3,"tier_name":"Workable","score":48,"outlook":"Stable","carbon_pillar":63,"cost_mid_usd_per_mwh":null,"wait_months":null,"wait_band":"4-5 years","report_url":"https://powergridiq.com/rating/isone","cost_availability":{"label":"Availability varies by jurisdiction","means":"The jurisdictions inside this region hold different cost-evidence states, in some cases opposite ones. No single regional availability is published, because any one of them would be false somewhere in the footprint.","user_action":"Identify the jurisdiction the site sits in and read that record. Do not apply one jurisdiction's conclusion to the region.","class":"varies_by_jurisdiction","band_published":true},"cost_evidence_state":{"label":"Observable in part; complete cost fragmented by jurisdiction","means":"Part of the cost is established from a filed, applicable tariff and is published. The remainder is set by many serving utilities across several jurisdictions, so no single figure exists at this market's geographic scope. The gap is not missing research; it is a scope the evidence cannot span.","remedy":"Narrow to one serving utility and interconnection point, then apply that utility's local transmission and distribution tariff. No region-wide document will close it, because no regional body sets these charges.","answerable":"partially","state":"scope_fragmented","also_holds":[],"vocabulary_version":"evidence-state-1.1"},"cost_breakdown":{"available":false,"reason":"withdrawn","text":"A single delivered-cost estimate cannot be defended at ISO-NE-wide scope. The regional transmission layer is uniform and verifiable, but local transmission, distribution and retail demand charges are set by 32 serving utilities across six states and five regulators. The superseded values are recorded in the correction record, not here."},"fields":{"cost_mid_usd_per_mwh":{"value":null,"known":false,"reason":"not_collected","reason_text":"No record exists yet. Research unlocks it."},"wait_months":{"value":null,"known":true,"withheld":"entitlement","entitlement_required":"desk","reason_text":"PowerGridIQ holds this value. It is included with the access tier named in entitlement_required.","upgrade_url":"https://powergridiq.com/pricing#desk","available_band":"4-5 years"}}}],"evaluated_count":11,"rejected_count":0,"insufficient_evidence_count":0,"rejected":[],"insufficient_evidence":[],"rejection_reasons":{},"note":"Every market in scope is evaluated and carries a verdict: qualifies, does_not_qualify or insufficient_evidence, each with a decisive reason. `results` is the qualifying set; rejected markets are reported rather than omitted. The verdict and its reason are free and every constraint is evaluated server-side against the true figure; only the precise cost midpoints and wait in months are the Analyst Desk (add an Analyst or Pro key)."}