Austria
The evidence behind the PGIQ Rating, exactly as printed on powergridiq.com/rating/austria, with every section open. As of June 2026.
The five pillars behind the tier
Workable access.
Moderate availability (hydro-led).
Mid-range cost.
Limited momentum.
Clean (~90 g), hydro.
Reliability overlay
Historical bulk-system performance: No reliability flags found
Modelled read: hydro-rich, well interconnected and reliable.
modelled
Historical utility-territory delivery performance: No reliability flags found
Average customer interruption (SAIDI) of 37.72 minutes per year in 2022, excluding major event days as filed.
measured · E-Control (via CEER)
Forward resource adequacy (assessed): No adequacy flags
Contractual service terms: not assessed
We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.
Designed site resilience: not applicable at market level
Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.
Reliability metrics
Delivery reliability (measured)
The average customer loses about 37.72 minutes of power per year (2022). This is the standard regulator outage measure (SAIDI); lower means a more reliable grid.
Averaged across several territories. No single customer experiences this figure. The per-territory table in the reliability overlay above gives each operator’s own filed record, which is what a site-specific read needs.
Source: E-Control (via CEER)
Supply relief outlook
What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.
Outlook drivers
↑ Upgrade triggers
- Hydro-backed clean supply attracts firm tenants.
- Regional interconnection helps.
↓ Downgrade triggers
- Mid cost and scale.
- Limited ecosystem.
Rating history
Data provenance and freshness
| Pillar | Evidence grade | What that means |
|---|---|---|
| Cost | Not assessed | We hold no evidence for this yet |
| Connection | Not assessed | We hold no evidence for this yet |
| Reliability | Market-level (M2) | Good for comparing markets, not for a site |
| Carbon | Market-level (M2) | Good for comparing markets, not for a site |
| Regulatory | Not assessed | We hold no evidence for this yet |
| Local capacity | Not assessed | We hold no substation-level evidence |
Source strength
High
All 1 data layers are directly measured
Coverage
Partial
1 of 3 dimensions: reliability, connection, cost
Last reviewed
June 2026
per-layer vintages below
| Layer | Method | Vintage | Freshness | Source |
|---|---|---|---|---|
| PGIQ Rating opinion | opinion | June 2026 | Current | PGIQ methodology |
| Reliability | measured | 2022 | Aging | E-Control (via CEER) |
Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.
What this market can and cannot answer yet
What is established
- Historical utility-territory delivery performance 37.72 minutes per year (2022)
- Historical bulk-system performance (modelled)
What is open
- Forward resource adequacy (assessed)
- Contractual service terms (would change the answer)
- Designed site resilience
- Cost evidence (would change the answer)
- Connection evidence (would change the answer)
- Regulatory evidence
- Substation-level capacity evidence
How service and connection are organized
Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.
Credible ranges today
- No cost or schedule range is compiled for this market.
What could disqualify this market
- Scale and ecosystem.
- Cost.
Questions to put to the utility
- What would a 100 MW load at a 95% load factor, on high-voltage service, pay per MWh all in, under the tariff it would actually be served on? Needed for a project caseWhy it is open: no compiled cost band for this market yet.
- How long is it from a complete application being accepted to full firm energization of the MW we need, and which milestones (initial, phased, temporary or conditional energization) would come first? Needed for a project caseWhy it is open: no countable queue or operator-published process for this market.
- Are the connection rules for large loads changing? What has been proposed or decided, and when does it take effect?Why it is open: no dated regulatory read compiled for this market yet.
- What firm capacity is available at the substation we would connect to, and when? Needed for a project caseWhy it is open: no operator publication of area or substation capacity found for this market.
The same list as JSON: /api/v1/markets/austria/gaps