⚡ POWERGRIDIQ · EVIDENCE PACK

CAISO (California)

The evidence behind the PGIQ Rating, exactly as printed on powergridiq.com/rating/caiso, with every section open. As of June 2026.

Back to the report

Realized cost band

What a large electricity user pays for power here on one declared case, 100 MW contracted demand, 95% load factor, HV service, per megawatt-hour. Not the wholesale price and not the sticker tariff: energy plus the grid, delivery and other charges that land on the bill. It is a range, because real contracts vary, and it is labelled by how it was built.

Recurring cost, delivered

$95 to $155 per MWh

Midpoint about $120 per MWh

How this band was built

triangulated

From 3 public fragments

What builds the $120 midpoint

Illustrative allocation of the compiled midpoint. Component lines are not separately sourced and should not be interpreted as observed tariff charges.
$42
$48
$22
Wholesale energy$42
Non-bypassable & policy charges (PCIA, wildfire)$48
Delivery & network$22
Rule 30 transmission & other$8
All-in delivered$120 /MWh
How the $120/MWh figure is built up, component by component, for 100 MW contracted demand, 95% load factor, HV service. The allocation is our estimate; the total is the midpoint of the compiled band (triangulated). Recurring cost only: customer-funded connection capital is a separate one-off and is not included. California's non-bypassable charges, including the Power Charge Indifference Adjustment, plus wildfire and policy costs, and under the new Rule 30 the upfront transmission cost for a large load, push the delivered cost far above the wholesale price. Anchored to published figures (CPUC on data-center cost allocation). How this is built →
What the classes mean →

Where the cost lands

$120
Low $95Midpoint $120High $155
A band, not a single price: the cheaper end is a well-structured contract on favourable terms, the higher end a less optimised one. The midpoint is our best central read.
What is in the number: Wholesale energy near $42 per MWh, plus California's heavy non-energy charges: non-bypassable charges, the Power Charge Indifference Adjustment, wildfire and policy costs, and, under the new Rule 30, upfront transmission cost for a large load. The delivered cost runs far above the wholesale price.

California's wholesale price badly understates the delivered cost. A large load carries some of the highest non-bypassable and delivery charges in the United States, so an all-in figure of roughly $95 to $155 per MWh is realistic, well above the $42 wholesale reading. On this basis California is an expensive market for a new large load, not a cheap one.

This market's band is free here; the ranked cross-market table with every market's precise midpoint is the Analyst Desk. See the ranked view.

Basis: Triangulated (built from several public data fragments cross-checked against each other, rather than one single measured figure). In US dollars per MWh delivered to a large high-load-factor load, excluding refundable taxes. Sources: CPUC on data-center cost allocation · CAISO large loads and Rule 30.

Interconnection queue

These are generation and storage interconnection queues. They show how congested the interconnection system is. They do not measure how long a new large load waits, and their withdrawal rates are not load withdrawal rates. At the end of 2025, generation and storage projects totalling about 2,060 GW were actively waiting in United States queues, down 10% from a year earlier. Of the capacity that entered between 2000 and 2020, about 75% withdrew before connecting and only about 13% reached operation by end-2025. The typical project built in 2025 waited about 61 months from request to operation (Lawrence Berkeley National Laboratory, Queued Up 2026). Refresh cadence by layer. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Each figure is labelled measured or modelled.

Active queue depth

191 GW

Typical wait

60 months

The full queue analysis for this market, which covers the share of projects that give up and leave the queue (the withdrawal rate), how much of the queue is data centers, and the sources, is part of the Analyst Desk (queue detail). API plans get the headline wait and its source; the depth and typical wait above are free. These are generation and storage queue figures: they show interconnection-system congestion, not a typical large-load connection wait.

The five pillars behind the tier

A
A
C
M
C
The pillar signature: Access, Availability, Cost, Momentum, Carbon, taller is stronger. The same shape repeats across every market so peers compare at a glance.
Access30%45

Constrained access: deep cluster-study queue, storage-heavy backlog.

Availability25%48

Tight availability: the evening net-load ramp as solar fades.

Cost25%68

High cost.

Momentum15%70

High momentum: the established Silicon Valley cluster.

Carbon5%68

Carbon moderate (~230 g), solar-and-gas with heavy storage.

Default weights, which lean toward cost and access rather than carbon: Access 30 · Availability 25 · Cost 25 · Momentum 15 · Carbon 5. Momentum reflects the data-center build already underway, not just stated intentions.

Reliability overlay

Reliability adjustment: the five-pillar score of 56 is reduced to 49, a deduction of 7 points, reflecting the delivery-reliability and firm-supply risks flagged below. Reliability is reported as five separate layers, never as one combined label, because they answer different questions and a strong answer on one does not cover a gap in another: what has actually failed on the bulk system, what a forward assessment expects of firm supply, how the local network performs, what your contract actually promises, and what your site is designed to ride through. Any one of them can cap the tier.

Historical bulk-system performance: Reliability flags found

ISO-ordered rotating outages during the August 2020 heat wave (about 492,000 customers cut on Aug 14) show supply-shortfall load-shedding risk at peak.

What this means: A large new load should expect genuine exposure to forced power cuts (curtailment), price spikes, and delays in getting connected, and should design in backup power or firm supply contracts.

event-based · CAISO rotating outages fact sheet

Historical utility-territory delivery performance: Reliability flags found

Average customer interruption (SAIDI) of 177.06 minutes per year in 2024, excluding major event days as filed. Public Safety Power Shutoffs: utilities proactively de-energize lines during wildfire-risk weather, so a load can lose grid power for reasons unrelated to its own site.

What this means: A large new load should expect genuine exposure to forced power cuts (curtailment), price spikes, and delays in getting connected, and should design in backup power or firm supply contracts.

event-based · CPUC Public Safety Power Shutoffs · EIA Form 861, Schedules 3B and 3C (annual electric power industry report) (IEEE 1366 major-event treatment, customer-weighted blend of 4 of 4 territories, 100% of customers, regional context only)

A blend, not your supplier. This figure covers several distribution operators, so it describes an average customer rather than the operator that would serve your site. It is good for comparing markets and watching them move, it tops out at Comparable (M2), and it cannot carry a Project Case. major event days identified by IEEE 1366 (2.5-beta method). It is a territory-wide history and is silent on: performance at a specific substation or feeder; transmission-level service, which is a different product from distribution service; the industrial or large-load customer class specifically; N-1 or other redundancy architecture at the supplying substation; contractual curtailment rights the utility may hold over the load; power quality and momentary interruptions, which this metric excludes by construction; on-site UPS, storage or generation; forward adequacy: it is a record of what happened, not a forecast.

The territories inside this market

The market figure above is an average across these territories. A project sits in one of them, not in the average. Each row is that operator’s own filed record; once a candidate site is matched to a territory, that row is the evidence that applies to it.

Territory operatorSAIDI min/yrCustomersMajor-event method
Pacific Gas & Electric Co. (CA)275.65,795,693IEEE 1366
Southern California Edison Co (CA)100.255,316,264IEEE 1366
San Diego Gas & Electric Co (CA)71.131,527,274IEEE 1366
City of Santa Clara - (CA) (CA)161.7360,620IEEE 1366

Filed to EIA Form 861 for 2024, excluding major event days. Territory-wide averages: see the layer note above for what they do not establish.

Forward resource adequacy (assessed): Adequacy flagged

NERC's 2024 assessment rates California elevated-risk, with extreme heat likely to cause reserve shortfalls.

What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.

assessed · NERC 2024 Long-Term Reliability Assessment

Contractual service terms: not assessed

We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.

Ask the utility for the tariff or service agreement terms before relying on firm supply.

Designed site resilience: not applicable at market level

Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.

Confidence: High. Each input is labelled as measured, modelled, or drawn from a specific event, and is framed as a risk to a prospective large new load, not as a verdict on any utility or grid operator. Forward adequacy is an assessment of what is expected, not a measurement of what has happened; it is a forecast and is labelled as one.

Reliability metrics

Delivery reliability (measured)

The average customer loses about 177.06 minutes of power per year (2024). This is the standard regulator outage measure (SAIDI); lower means a more reliable grid.

Averaged across 4 territories. No single customer experiences this figure. The per-territory table in the reliability overlay above gives each operator’s own filed record, which is what a site-specific read needs.

Source: EIA Form 861, Schedules 3B and 3C (annual electric power industry report) (IEEE 1366 major-event treatment, customer-weighted blend of 4 of 4 territories, 100% of customers, regional context only)

Hard, cited measures behind the reliability overlay above: the regulator outage series (SAIDI, measured, published with a lag) and the forward resource-adequacy assessment (a measured forecast). Framed as risk to a prospective large new load, not a verdict on any utility.

Supply relief outlook

Will the power crunch ease before your load energizes? This nets the demand racing for capacity against the new supply likely to arrive and the old supply leaving. A cross-side read, using the same data a seller sees the other way.
Balanced
Demand pressure
Fast load growth competing for the same capacity.
New supply in motion
About 38.2 GW of the generation and storage queue is likely to reach operation after historical withdrawal.
Can new supply arrive
Regulatory momentum mixed, stable.
Future firm supply
Future firm supply: adequacy flagged.

What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.

Regulatory momentum

The regulatory and permitting environment is increasingly the binding variable for a new large load.
Mixed→ stable

Why: FERC's 18 June 2026 Section 206 show-cause order directs CAISO to justify or rewrite its large-load and co-location tariff terms, so the rules for connecting a data centre are formally in flux; California's high retail costs and its own cost-allocation review add friction on top.

What would change the read: The Section 206 process settling on clear large-load connection and cost-allocation rules, and California resolving who pays for the supporting build.

Outlook drivers

↑ Upgrade triggers

  • Storage build flattens the ramp and frees capacity.
  • Queue reform speeds connections.

↓ Downgrade triggers

  • Wildfire-season shutoffs and ramp tightness worsen.
  • Cost and policy push new build out of state.

Rating history

Jul 2026
Under reviewThe Cost pillar (currently 68) is placed under review. California's wholesale price badly understates the delivered cost once non-bypassable charges, the Power Charge Indifference Adjustment, delivery, and Rule 30 upfront transmission are counted; a large load's all-in runs closer to $95 to $155 per MWh, an expensive market, not a moderate one. Reassessing the Cost score; tier could move down as the cost read weakens.
Trigger: Realized-cost review of California non-bypassable and delivery charges (Jul 2026)
Jun 2026
AffirmedNamed in the FERC show-cause suite; preliminary stage, tier holds, monitoring.
Trigger: FERC Section 206 show-cause order (18 Jun 2026)
Oct 2026
AffirmedAffirmed, no change, 23 Oct 2026. Closes the cost-pillar review of California's non-bypassable and delivery charges. California is not yet in the compared delivered-cost set used by the cost-rescore release of 15 Oct 2026, so the analyst Cost assessment stands until a delivered band is added; we found no new official tariff decision since July that changes the read. Tier and outlook held.
Trigger: Realized-cost review of California non-bypassable and delivery charges (Jul 2026)
June 2026
New ratingNew rating: Tier 3 Workable assigned.
Every rating action is dated and explained, and the log is only ever added to, never edited. Reviews happen on a regular schedule and whenever a significant event occurs. "Affirmed" means we reviewed a development and the tier held; "Under review" means a significant item is being assessed and the rating could change.

Data provenance and freshness

What we hold for this market, field by field. Each grade is set by the evidence we actually hold for that pillar. A low grade means we looked and the evidence is thin; it is not a verdict on the market.
PillarEvidence gradeWhat that means
CostProject-ready (M3)Enough to price a project case
ConnectionMarket-level (M2)Good for comparing markets, not for a site
ReliabilityMarket-level (M2)Good for comparing markets, not for a site
CarbonMarket-level (M2)Good for comparing markets, not for a site
RegulatoryMarket-level (M2)Good for comparing markets, not for a site
Local capacityNot assessedWe hold no substation-level evidence
Good enough for: screening and monitoring and comparing markets. Not yet good enough for: a priced project case, a project case with a carbon requirement, or site-level diligence. The weakest fields are connection and reliability.
Depth is not a rating strength, a confidence score or a feasibility conclusion. See the full coverage matrix. Version details: evidence-grade definitions v1.0.
How solid the data behind this rating is, on two separate axes plus recency. Source strength is how measured the numbers are, as opposed to triangulated or modelled. Coverage is how many of the decision-relevant data dimensions (reliability, connection, and cost) are compiled for this market. The two are kept apart because they answer different questions: a market can have strong sources on the little that is covered, or broad coverage that still leans on models. Neither grades the rating itself. The rating is a cited opinion, graded separately and falsifiably by the public track record and baseline measurement plan.

Source strength

High

2 of 3 data layers directly measured; the rest are triangulated or modelled

Coverage

Full

3 of 3 dimensions: reliability, connection, cost

Last reviewed

23 Oct 2026

per-layer vintages below

LayerMethodVintageFreshnessSource
PGIQ Rating opinionopinionJune 2026CurrentPGIQ methodology
Reliabilitymeasured2024FreshEIA Form 861, Schedules 3B and 3C (annual electric power industry report) (IEEE 1366 major-event treatment, customer-weighted blend of 4 of 4 territories, 100% of customers, regional context only)
Interconnection queuemeasuredend-2025 (LBNL 2026)FreshLBNL Queued Up 2026
Realized costtriangulated2026FreshCPUC on data-center cost allocation

Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.

What this market can and cannot answer yet

No market-level read closes a project case on its own, and saying only that would waste the evidence we do hold. Below is what is established, what is open, and what to do next.

What is established

  • Recurring cost band $95 to $155 per MWh, midpoint $120, basis triangulated, against the 100 MW archetype
  • Historical utility-territory delivery performance 177.06 minutes per year (2024)
  • Historical bulk-system performance (event-based)
  • Forward resource adequacy (assessed)
  • Typical interconnection wait about 60 months (generation and storage queue, not a load wait)

What is open

  • Contractual service terms (would change the answer)
  • Designed site resilience
  • Substation-level capacity evidence

How service and connection are organized

Territories in this market, each with its own filed record: Pacific Gas & Electric Co., Southern California Edison Co, San Diego Gas & Electric Co, City of Santa Clara - (CA). Which one serves a given site depends on where that site is.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.

Credible ranges today

  • Cost $95 to $155 per MWh, midpoint $120 (triangulated)
  • Schedule: interconnection queues here run about 60 months for generation and storage; a large load follows a different process and we do not hold its measured distribution

What could disqualify this market

  • Evening ramp and supply adequacy.
  • Wildfire/PSPS and high cost.

Questions to put to the utility

These come from the gaps in our record for CAISO (California): the decision points we have not assessed. Put each one to the utility, network operator or regulator before relying on this market for a project. A gap is not evidence that the risk is absent; it means we have not assessed it.
  1. What firm capacity is available at the substation we would connect to, and when? Needed for a project case
    Why it is open: no operator publication of area or substation capacity found for this market.

The same list as JSON: /api/v1/markets/caiso/gaps

Generated with the report at each build; free, like the report. For information only; not investment, engineering or procurement advice.