ERCOT Central (Houston & DFW)

The evidence behind the PGIQ Rating, exactly as printed on powergridiq.com/rating/ercot-central, with every section open. As of June 2026.

Back to the report

Realized cost band

What a large electricity user pays for power here on one declared case, 100 MW contracted demand, 95% load factor, HV service, per megawatt-hour. Not the wholesale price and not the sticker tariff: energy plus the grid, delivery and other charges that land on the bill. It is a range, because real contracts vary, and it is labelled by how it was built.

Recurring cost, delivered

$55 to $95 per MWh

Midpoint about $72 per MWh

How this band was built

triangulated

From 2 public fragments

What builds the $72 midpoint

Illustrative allocation of the compiled midpoint. Component lines are not separately sourced and should not be interpreted as observed tariff charges.
$52
$15
Wholesale energy$52
Transmission & delivery (4CP)$15
Ancillary services$5
All-in delivered$72 /MWh
Transmission & delivery is a bundled category. It currently combines transmission, distribution and applicable demand-related network charges in one line. Those elements have not been independently sourced or separately reconciled.
How the $72/MWh figure is built up, component by component, for 100 MW contracted demand, 95% load factor, HV service. The allocation is our estimate; the total is the midpoint of the compiled band (triangulated). Recurring cost only: customer-funded connection capital is a separate one-off and is not included. The Houston and DFW load pockets pay a premium over the west for deliverability: generation sits near the load and the transmission is robust, so a firm 24/7 load can actually draw its power. That deliverability is what the premium buys. Anchored to published figures (ERCOT 2024 State of the Market (Potomac Economics)). How this is built →
What the classes mean →

Where the cost lands

$72
Low $55Midpoint $72High $95
A band, not a single price: the cheaper end is a well-structured contract on favourable terms, the higher end a less optimised one. The midpoint is our best central read.
What is in the number: Wholesale energy in the Houston and North load zones, above the west because these are demand centres, plus transmission cost allocation (the 4CP mechanism) and ancillary services. No capacity market.

The Central sub-region costs more than the west, but the power actually reaches the site; deliverability is what the premium buys.

This market's band is free here; the ranked cross-market table with every market's precise midpoint is the Analyst Desk. See the ranked view.

Basis: Triangulated (built from several public data fragments cross-checked against each other, rather than one single measured figure). In US dollars per MWh delivered to a large high-load-factor load, excluding refundable taxes. Sources: ERCOT 2024 load-zone prices (Modo Energy).

Connection friction

How hard it is to connect a large new load here, and how long it takes. Part of the PowerGridIQ Connection Friction Feed. Labelled estimate; confidence Med.

Friction level

Low

Typical connection wait

1 to 2 years

This market's friction level, wait band and full story are free here. Every market's wait in months, ranked side by side, is the Analyst Desk.

Energy-only connect-and-manage keeps Houston and DFW among the fastest large-load connections in the US.

ERCOT's energy-only, connect-and-manage framework is the fastest large-load path in the US, and the Central load pockets (Houston, DFW) pair it with robust transmission so a firm load can actually draw its power. A 75 MW readiness threshold and posted security now apply, but there is no capacity-market queue to clear.

What builds the 24-month wait

6
6
12
Application & screening6 mo
Interconnection study & agreement6 mo
Construction & energization12 mo
Typical time to energization24 months
How the typical connection wait breaks down by stage. Stages overlap in practice and vary by project; the split is our estimate anchored to the operator process, and the total is the representative time to energization. Anchored to the operator process (ERCOT interconnection process).

Data-center share of demand pressure: Rising. Sources: ERCOT interconnection process · ERCOT large loads. The full cross-market connection dataset is available through the Connection Friction Feed.

The five pillars behind the tier

A
A
C
M
C
The pillar signature: Access, Availability, Cost, Momentum, Carbon, taller is stronger. The same shape repeats across every market so peers compare at a glance.
Access30%82

Strong access: Houston and North (DFW) have low congestion, generation sited near demand, and more robust transmission than the west, plus ERCOT's fast connect-and-manage energization.

Availability25%64

Availability is workable with cheap self-supply gas; the load pockets are gas-served and dense.

Cost25%78

Higher cost than the west, but still low by national standards; deliverability is the reason to pay it.

Momentum15%88

Highest momentum in ERCOT: the DFW and Houston corridors anchor the Texas data-center build.

Carbon5%45

Carbon is the weak pillar (gas-heavy load pockets), immaterial in the default lens.

Default weights, which lean toward cost and access rather than carbon: Access 30 · Availability 25 · Cost 25 · Momentum 15 · Carbon 5. Momentum reflects the data-center build already underway, not just stated intentions.

Reliability overlay

Reliability adjustment: the five-pillar score of 78 is reduced to 70, a deduction of 8 points, reflecting the delivery-reliability and firm-supply risks flagged below. Reliability is reported as five separate layers, never as one combined label, because they answer different questions and a strong answer on one does not cover a gap in another: what has actually failed on the bulk system, what a forward assessment expects of firm supply, how the local network performs, what your contract actually promises, and what your site is designed to ride through. Any one of them can cap the tier.

Historical bulk-system performance: Minor flags found

ERCOT-wide assessment applied to the Central sub-region: Winter Storm Uri (Feb 2021) forced about 20,000 MW of rolling blackouts, the largest manual load shed in US history; post-Uri winterization has improved winter performance but the tail risk remains. The Houston and DFW load pockets have robust local transmission, a deliverability strength captured in the access pillar.

What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.

event-based · FERC/NERC Feb 2021 cold weather final report

Historical utility-territory delivery performance: No reliability flags found

Average customer interruption (SAIDI) of 98.33 minutes per year in 2024, excluding major event days as filed.

measured · EIA Form 861, Schedules 3B and 3C (annual electric power industry report) (two major-event methods, IEEE; respondent-defined, customer-weighted blend of 3 of 3 territories, 100% of customers, regional context only)

A blend, not your supplier. This figure covers several distribution operators, so it describes an average customer rather than the operator that would serve your site. It is good for comparing markets and watching them move, it tops out at Comparable (M2), and it cannot carry a Project Case. mixed methods: IEEE 44%; respondent-defined 56% of customers. Major event days are excluded throughout; the methods differ only in how those days are identified, a smaller difference than the spread between the utilities themselves. Constituents below carry their own standard. It is a territory-wide history and is silent on: performance at a specific substation or feeder; transmission-level service, which is a different product from distribution service; the industrial or large-load customer class specifically; N-1 or other redundancy architecture at the supplying substation; contractual curtailment rights the utility may hold over the load; power quality and momentary interruptions, which this metric excludes by construction; on-site UPS, storage or generation; forward adequacy: it is a record of what happened, not a forecast.

The territories inside this market

The market figure above is an average across these territories. A project sits in one of them, not in the average. Each row is that operator’s own filed record; once a candidate site is matched to a territory, that row is the evidence that applies to it.

Territory operatorSAIDI min/yrCustomersMajor-event method
Oncor Electric Delivery Company LLC (TX)67.284,013,062own method
CenterPoint Energy (TX)150.092,847,806IEEE 1366
Denton County Elec Coop, Inc (TX)26.9319,523IEEE 1366

Filed to EIA Form 861 for 2024, excluding major event days. Territory-wide averages: see the layer note above for what they do not establish.

Forward resource adequacy (assessed): Tight

NERC's 2024 Long-Term Reliability Assessment rates ERCOT elevated-risk grid-wide: about 20 GW of new large loads plus a more variable resource mix raise the risk of long-term shortfalls across the interconnection.

What this means: A large new load should expect genuine exposure to forced power cuts (curtailment), price spikes, and delays in getting connected, and should design in backup power or firm supply contracts.

assessed · NERC 2024 Long-Term Reliability Assessment

Contractual service terms: interruptible available

ERCOT-wide: fast access is conditioned on accepting curtailment at system peaks; the 4CP transmission mechanism further rewards curtailing at the four coincident annual peaks.

What the service contract promises, as distinct from how the system has performed · ERCOT large flexible load standards

Designed site resilience: not applicable at market level

Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.

Confidence: High. Each input is labelled as measured, modelled, or drawn from a specific event, and is framed as a risk to a prospective large new load, not as a verdict on any utility or grid operator. Forward adequacy is an assessment of what is expected, not a measurement of what has happened; it is a forecast and is labelled as one.

Reliability metrics

Delivery reliability (measured)

The average customer loses about 98.33 minutes of power per year (2024). This is the standard regulator outage measure (SAIDI); lower means a more reliable grid.

Averaged across 3 territories. No single customer experiences this figure. The per-territory table in the reliability overlay above gives each operator’s own filed record, which is what a site-specific read needs.

Source: EIA Form 861, Schedules 3B and 3C (annual electric power industry report) (two major-event methods, IEEE; respondent-defined, customer-weighted blend of 3 of 3 territories, 100% of customers, regional context only)

Hard, cited measures behind the reliability overlay above: the regulator outage series (SAIDI, measured, published with a lag) and the forward resource-adequacy assessment (a measured forecast). Framed as risk to a prospective large new load, not a verdict on any utility.

Supply relief outlook

Will the power crunch ease before your load energizes? This nets the demand racing for capacity against the new supply likely to arrive and the old supply leaving. A cross-side read, using the same data a seller sees the other way.
Tightening
Demand pressure
Fast load growth competing for the same capacity.
Can new supply arrive
The same fast energy-only build path, applied where transmission is robust and the load pockets are well served.
Future firm supply
Future firm supply: tight.

What this means: The supply picture looks likely to tighten; a new load should lock firm supply early and expect competition for capacity.

Regulatory momentum

The regulatory and permitting environment is increasingly the binding variable for a new large load.
Favourableunder review (PUCT large-load rule)

Why: The same open, energy-only connect-and-manage framework as ERCOT statewide, applied where the transmission is robust and the load pockets are well served.

What would change the read: Restrictive new large-load interconnection rules following a major reliability event.

For new supply: The same fast energy-only build path, applied where transmission is robust and the load pockets are well served.

Beyond the grid: Water and community consent bind in Central Texas: the San Antonio to Austin corridor quadrupled data-centre development from 2023 to 2025 as Edwards Aquifer levels hit historic lows, Hays County advocates are protesting five proposed sites, and San Marcos City Council voted a data centre down outright. KUT TPR

Outlook drivers

↑ Upgrade triggers

  • Continued DFW and Houston build converts the queue into operating capacity.
  • Battery and solar additions ease the summer peak.

↓ Downgrade triggers

  • Load-pocket congestion rises as demand concentrates.
  • A Winter-Storm-Uri-scale event triggers restrictive large-load rules.

Rating history

June 2026
New ratingNew rating: Tier 2 Strong assigned (ERCOT Central sub-region).
Every rating action is dated and explained, and the log is only ever added to, never edited. Reviews happen on a regular schedule and whenever a significant event occurs. "Affirmed" means we reviewed a development and the tier held; "Under review" means a significant item is being assessed and the rating could change.

What this would mean for a project

100 MW contracted demand, 95% load factor, HV servicecalculated

A load of this shape consumes 832,200 MWh a year. At the delivered band of $55 to $95/MWh that is $45,771,000 to $79,059,000 a year in recurring power.

Wholesale energy is 72% of the delivered cost here. The other $20/MWh is transmission and delivery (4CP), and ancillary services. See the full build-up.

Typical connection wait is 1 to 2 years, at Med confidence.

Recurring charges only. Customer-funded connection, substation and network-upgrade capital is quoted per project by the network operator and is not in this figure. A load factor materially below 95% raises the delivered rate per MWh, because demand and network charges are levied per MW; screen your own load to see whether the band still applies.

Data provenance and freshness

What we hold for this market, field by field. Each grade is set by the evidence we actually hold for that pillar. A low grade means we looked and the evidence is thin; it is not a verdict on the market.
PillarEvidence gradeWhat that means
CostProject-ready (M3)Enough to price a project case
ConnectionBroad (M1)Directional: good for screening and monitoring
ReliabilityMarket-level (M2)Good for comparing markets, not for a site
CarbonMarket-level (M2)Good for comparing markets, not for a site
RegulatoryMarket-level (M2)Good for comparing markets, not for a site
Local capacityNot assessedWe hold no substation-level evidence
Good enough for: screening and monitoring and comparing markets. Not yet good enough for: a priced project case, a project case with a carbon requirement, or site-level diligence. The weakest field is connection.
Depth is not a rating strength, a confidence score or a feasibility conclusion. See the full coverage matrix. Version details: evidence-grade definitions v1.0.
How solid the data behind this rating is, on two separate axes plus recency. Source strength is how measured the numbers are, as opposed to triangulated or modelled. Coverage is how many of the decision-relevant data dimensions (reliability, connection, and cost) are compiled for this market. The two are kept apart because they answer different questions: a market can have strong sources on the little that is covered, or broad coverage that still leans on models. Neither grades the rating itself. The rating is a cited opinion, graded separately and falsifiably by the public track record and baseline measurement plan.

Source strength

Moderate

1 of 3 data layers directly measured; the rest are triangulated or modelled

Coverage

Full

3 of 3 dimensions: reliability, connection, cost

Last reviewed

June 2026

per-layer vintages below

LayerMethodVintageFreshnessSource
PGIQ Rating opinionopinionJune 2026CurrentPGIQ methodology
Reliabilitymeasured2024FreshEIA Form 861, Schedules 3B and 3C (annual electric power industry report) (two major-event methods, IEEE; respondent-defined, customer-weighted blend of 3 of 3 territories, 100% of customers, regional context only)
Connection frictionproxy2025/26FreshERCOT interconnection process
Realized costtriangulated2026FreshERCOT 2024 load-zone prices (Modo Energy)

Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.

What this market can and cannot answer yet

No market-level read closes a project case on its own, and saying only that would waste the evidence we do hold. Below is what is established, what is open, and what to do next.

What is established

  • Recurring cost band $55 to $95 per MWh, midpoint $72, basis triangulated, against the 100 MW archetype
  • Historical utility-territory delivery performance 98.33 minutes per year (2024)
  • Historical bulk-system performance (event-based)
  • Forward resource adequacy (assessed)
  • Contractual service terms (reported)

What is open

  • Designed site resilience
  • Substation-level capacity evidence

How service and connection are organized

Territories in this market, each with its own filed record: Oncor Electric Delivery Company LLC, CenterPoint Energy, Denton County Elec Coop, Inc. Which one serves a given site depends on where that site is.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.

Credible ranges today

  • Cost $55 to $95 per MWh, midpoint $72 (triangulated)

What could disqualify this market

  • Summer scarcity pricing and peak reliability.
  • Rising large-load concentration in the corridors.

Questions to put to the utility

These come from the gaps in our record for ERCOT Central (Houston & DFW): the decision points we have not assessed. Put each one to the utility, network operator or regulator before relying on this market for a project. A gap is not evidence that the risk is absent; it means we have not assessed it.
  1. What is the average carbon intensity of the grid supply we would draw, for which year, and is it measured or derived from the fuel mix?
    Why it is open: no grid snapshot compiled for this market yet.
  2. What firm capacity is available at the substation we would connect to, and when? Needed for a project case
    Why it is open: no operator publication of area or substation capacity found for this market.

The same list as JSON: /api/v1/markets/ercot-central/gaps

Generated with the report at each build; free, like the report. For information only; not investment, engineering or procurement advice.