Realized cost band
Recurring cost, delivered
$170 to $210 per MWh
Midpoint about $188 per MWh
What sets this band
Where the cost lands
Hong Kong's realized cost is the regulated Scheme-of-Control tariff of whichever of the two utilities serves the site, among the highest in the region. There is no wholesale market, so the tariff is the delivered cost.
This market's band is free here; the ranked cross-market table with every market's precise midpoint is the Analyst Desk. See the ranked view.
Basis: Administered (a single regulated or state-set tariff, so the figure is the delivered cost and moves only on a regulator decision). In US dollars per MWh delivered to a large high-load-factor load, excluding refundable taxes. Sources: CLP and HK Electric 2026 tariffs (HK Government) · CLP 2026 tariff tables.
Connection friction
Friction level
Moderate
This market's friction level, wait band and full story are free here. Every market's wait in months, ranked side by side, is the Analyst Desk.
Hong Kong's two vertically integrated utilities, CLP and HK Electric, run an orderly connection process, and the city already hosts about 1.42 GW of data-centre IT load with more than 400 MW more due by end-2026. The constraint is land and long-run generation capacity in a dense city, not a chaotic queue.
What builds the 30-month wait
Data-center share of demand pressure: High. Sources: Hong Kong data-centre power supply (government) · CLP apply for grid connection. The full cross-market connection dataset is available through the Connection Friction Feed.
The five pillars behind the tier
Constrained access: severe land scarcity and a small system, though the government facilitates data centres and is upgrading the Northern Metropolis grid for AI density.
Strong local delivery record: CLP reports about 99.999% supply reliability, roughly 2.6 minutes of unplanned outage a year, on a ~7.2 GW system.
Very high cost: regulated Scheme-of-Control net tariffs run about 141 to 163 HK cents per kWh (~$180 to $210 per MWh).
Moderate momentum: an established banking and cloud hub plus a government AI Supercomputing Centre, but a small overall market.
Moderate-high carbon: gas and coal, with imported nuclear from Daya Bay.
Reliability overlay
Historical bulk-system performance: No reliability flags found
Historical utility-territory delivery performance: No reliability flags found
Strong local delivery record on the utility's own published measure: CLP reports about 99.999% supply reliability, roughly 2.6 minutes of unplanned outage a year, on a small, dense system. This describes distribution performance, not the terms of a firm service contract.
measured · CLP supply reliability and power quality
Forward resource adequacy (assessed): No adequacy flags
Contractual service terms: not assessed
We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.
Designed site resilience: not applicable at market level
Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.
Supply relief outlook
What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.
Outlook drivers
↑ Upgrade triggers
- Northern Metropolis grid upgrades unlock AI-density sites.
- More gas and imported low-carbon power lower the grid average.
↓ Downgrade triggers
- Land scarcity and high cost cap large new builds.
- Tariffs stay among the highest in the region.
Evidence behind this rating
The real-world events that test our Tier 3 call for Hong Kong: 2 support it. Each is dated and cited, so you can check the rating against what is actually happening on the ground.
CLP reports very high supply reliability with little unplanned outage a year, and both utilities say they hold adequate capacity and backup. That is a strong local delivery record on the utility's own published measure, and a real strength for a large load, even as high cost and land scarcity constrain the rating. It describes distribution performance, not the terms of a firm service contract.
Hong Kong is standing up a government AI Supercomputing Centre and CLP is upgrading the Northern Metropolis grid for kilowatt-density AI load, real but modest momentum on a small, land-constrained system.
Dispute this rating. If you have evidence we’ve missed or misread, email hello@powergridiq.com. We log every dispute and reply within 10 business days.
Rating history
Data provenance and freshness
| Pillar | Evidence grade | What that means |
|---|---|---|
| Cost | Market-level (M2) | Good for comparing markets, not for a site |
| Connection | Broad (M1) | Directional: good for screening and monitoring |
| Reliability | Broad (M1) | Directional: good for screening and monitoring |
| Carbon | Market-level (M2) | Good for comparing markets, not for a site |
| Regulatory | Not assessed | We hold no evidence for this yet |
| Local capacity | Not assessed | We hold no substation-level evidence |
Source strength
Moderate
2 of 3 data layers directly measured; the rest are triangulated or modelled
Coverage
Full
3 of 3 dimensions: reliability, connection, cost
Last reviewed
June 2026
per-layer vintages below
| Layer | Method | Vintage | Freshness | Source |
|---|---|---|---|---|
| PGIQ Rating opinion | opinion | June 2026 | Current | PGIQ methodology |
| Reliability review | measured | 2025 | Fresh | CLP supply reliability and power quality |
| Connection friction | proxy | 2025/26 | Fresh | Hong Kong data-centre power supply (government) |
| Realized cost | measured | 2026 | Fresh | CLP and HK Electric 2026 tariffs (HK Government) |
Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.
What this market can and cannot answer yet
What is established
- Recurring cost band $170 to $210 per MWh, midpoint $188, basis administered, against the 100 MW archetype
What is open
- Forward resource adequacy (assessed)
- Historical utility-territory delivery performance (would change the answer)
- Contractual service terms (would change the answer)
- Designed site resilience
- Regulatory evidence
- Substation-level capacity evidence
How service and connection are organized
Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.
Credible ranges today
- Cost $170 to $210 per MWh, midpoint $188 (administered)
What could disqualify this market
- Very high power cost.
- Land and space scarcity on a small system.
Questions to put to the utility
- What is the measured outage record (SAIDI) for the network that would serve our site, as filed with the regulator, and for which years? Needed for a project caseWhy it is open: no regulator outage series compiled for this market yet.
- What is the average carbon intensity of the grid supply we would draw, for which year, and is it measured or derived from the fuel mix?Why it is open: no grid snapshot compiled for this market yet.
- Are the connection rules for large loads changing? What has been proposed or decided, and when does it take effect?Why it is open: no dated regulatory read compiled for this market yet.
- What firm capacity is available at the substation we would connect to, and when? Needed for a project caseWhy it is open: no operator publication of area or substation capacity found for this market.
The same list as JSON: /api/v1/markets/hong-kong/gaps