⚡ POWERGRIDIQ · EVIDENCE PACK

Japan East (Tokyo, 50Hz)

The evidence behind the PGIQ Rating, exactly as printed on powergridiq.com/rating/japan-east, with every section open. As of June 2026.

Back to the report

Realized cost band

What a large electricity user pays for power here on one declared case, 100 MW contracted demand, 95% load factor, HV service, per megawatt-hour. Not the wholesale price and not the sticker tariff: energy plus the grid, delivery and other charges that land on the bill. It is a range, because real contracts vary, and it is labelled by how it was built.

Recurring cost, delivered

$135 to $190 per MWh

Midpoint about $160 per MWh

How this band was built

modelled

From 2 public fragments

What builds the $160 midpoint

Illustrative allocation of the compiled midpoint. Component lines are not separately sourced and should not be interpreted as observed tariff charges.
$112
$30
Generation (LNG-heavy)$112
Transmission & distribution$30
Fuel-cost adjustment & renewable levy$18
All-in delivered$160 /MWh
How the $160/MWh figure is built up, component by component, for 100 MW contracted demand, 95% load factor, HV service. The allocation is our estimate; the total is the midpoint of the compiled band (modelled). Recurring cost only: customer-funded connection capital is a separate one-off and is not included. Japan's power is among the most expensive in the OECD because it leans on imported LNG, and the monthly fuel-cost adjustment moves the bill. A large high-voltage data-centre contract sits below the small-business rate but well above US levels. Anchored to published figures (Japan business electricity price (GlobalPetrolPrices, Dec 2025)). How this is built →
What the classes mean →

Where the cost lands

$160
Low $135Midpoint $160High $190
A band, not a single price: the cheaper end is a well-structured contract on favourable terms, the higher end a less optimised one. The midpoint is our best central read.
What is in the number: LNG-heavy generation plus transmission and distribution, the monthly fuel-cost adjustment and the renewable-energy levy. Japan has no US-style capacity market; cost is driven by imported fuel.

Tokyo is one of the world's largest data-center markets, but Japan's reliance on imported LNG makes delivered power among the most expensive in the coverage. A large high-voltage load negotiates a special contract below the roughly 28 yen per kWh small-business rate, but still well above US or Nordic levels, and the monthly fuel-cost adjustment adds volatility.

This market's band is free here; the ranked cross-market table with every market's precise midpoint is the Analyst Desk. See the ranked view.

Basis: Modelled (estimated from a model and structural indicators where direct published figures are limited). In US dollars per MWh delivered to a large high-load-factor load, excluding refundable taxes. Sources: Japan business electricity price (GlobalPetrolPrices) · TEPCO fuel cost adjustments (2026).

Connection friction

How hard it is to connect a large new load here, and how long it takes. Part of the PowerGridIQ Connection Friction Feed. Labelled measured; confidence Med-High.

Friction level

Severe

This market's friction level, wait band and full story are free here. Every market's wait in months, ranked side by side, is the Analyst Desk.

Inner-Tokyo power connections run 5 to 10 years; the 66kV network and substation build are the bottleneck.

Power connections in inner Tokyo take about 5 to 10 years, and reports from Chiba cite a 10-year wait as the capacity limits of TEPCO's 66kV network plus substation and transmission construction exceed the building timeline. Transmission-connection applications reached about 15 GW at end-FY2025, up 20 percent year on year. TEPCO Power Grid has said it aims to halve data-centre connection lead times, the main forward watch item.

What builds the 90-month wait

12
18
42
18
Application & capacity study12 mo
Grid connection study & offer18 mo
Substation & network reinforcement42 mo
Construction & energization18 mo
Typical time to energization90 months
How the typical connection wait breaks down by stage. Stages overlap in practice and vary by project; the split is our estimate anchored to the operator process, and the total is the representative time to energization. Anchored to the operator process (Shulman Advisory: TEPCO PG connection lead time).

Data-center share of demand pressure: Very high. Sources: Introl: Japan data-center power crisis · Shulman Advisory: TEPCO PG halving connection lead time. The full cross-market connection dataset is available through the Connection Friction Feed.

The five pillars behind the tier

A
A
C
M
C
The pillar signature: Access, Availability, Cost, Momentum, Carbon, taller is stronger. The same shape repeats across every market so peers compare at a glance.
Access30%55

Constrained access on a tight island grid; Tokyo/Inzai is the eastern demand centre.

Availability25%48

Tighter availability: first-ever power shortage warnings in 2022 (cold, low solar, post-quake shutdowns), with the large Kashiwazaki-Kariwa restart still pending.

Cost25%35

Highest cost: eastern-area wholesale runs above the west given the tighter balance.

Momentum15%78

Highest momentum: Tokyo anchors the eastern data-center cluster.

Carbon5%30

Higher carbon: more LNG and coal, less nuclear online than the west.

Default weights, which lean toward cost and access rather than carbon: Access 30 · Availability 25 · Cost 25 · Momentum 15 · Carbon 5. Momentum reflects the data-center build already underway, not just stated intentions.

Reliability overlay

Reliability adjustment: the five-pillar score of 50 is reduced to 43, a deduction of 7 points, reflecting the delivery-reliability and firm-supply risks flagged below. Reliability is reported as five separate layers, never as one combined label, because they answer different questions and a strong answer on one does not cover a gap in another: what has actually failed on the bulk system, what a forward assessment expects of firm supply, how the local network performs, what your contract actually promises, and what your site is designed to ride through. Any one of them can cap the tier.

Historical bulk-system performance: No reliability flags found

Historical utility-territory delivery performance: No reliability flags found

Average customer interruption (SAIDI) of 24 minutes per year in FY2024, excluding major event days as filed.

measured · Japan OCCTO quality of supply

A blend, not your supplier. This figure covers several distribution operators, so it describes an average customer rather than the operator that would serve your site. It is good for comparing markets and watching them move, it tops out at Comparable (M2), and it cannot carry a Project Case. national average across Japan's regional utilities. It is a territory-wide history and is silent on: performance at a specific substation or feeder; transmission-level service, which is a different product from distribution service; the industrial or large-load customer class specifically; N-1 or other redundancy architecture at the supplying substation; contractual curtailment rights the utility may hold over the load; power quality and momentary interruptions, which this metric excludes by construction; on-site UPS, storage or generation; forward adequacy: it is a record of what happened, not a forecast.

Forward resource adequacy (assessed): Tight

The 50Hz east is structurally tight: it issued Japan's first-ever power shortage warnings in 2022, big eastern nuclear (Kashiwazaki-Kariwa) is still returning, and only about 1.2 GW of frequency converters (rising toward 3 GW by 2027) link it to the western surplus, so the east cannot freely borrow firm capacity from the west.

What this means: A large new load should expect genuine exposure to forced power cuts (curtailment), price spikes, and delays in getting connected, and should design in backup power or firm supply contracts.

event-based · Tokyo first-ever power shortage warning 2022 (Nippon.com) · Japan east-west converter capacity (Wikipedia)

Contractual service terms: not assessed

We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.

Ask the utility for the tariff or service agreement terms before relying on firm supply.

Designed site resilience: not applicable at market level

Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.

Confidence: Med-High. Each input is labelled as measured, modelled, or drawn from a specific event, and is framed as a risk to a prospective large new load, not as a verdict on any utility or grid operator. Forward adequacy is an assessment of what is expected, not a measurement of what has happened; it is a forecast and is labelled as one.

Reliability metrics

Delivery reliability (measured)

The average customer loses about 24.0 minutes of power per year (FY2024). This is the standard regulator outage measure (SAIDI); lower means a more reliable grid.

Averaged across several territories. No single customer experiences this figure. The per-territory table in the reliability overlay above gives each operator’s own filed record, which is what a site-specific read needs.

Source: Japan OCCTO quality of supply

Hard, cited measures behind the reliability overlay above: the regulator outage series (SAIDI, measured, published with a lag) and the forward resource-adequacy assessment (a measured forecast). Framed as risk to a prospective large new load, not a verdict on any utility.

Supply relief outlook

Will the power crunch ease before your load energizes? This nets the demand racing for capacity against the new supply likely to arrive and the old supply leaving. A cross-side read, using the same data a seller sees the other way.
Tightening
Demand pressure
Fast load growth competing for the same capacity.
Future firm supply
Future firm supply: tight.

What this means: The supply picture looks likely to tighten; a new load should lock firm supply early and expect competition for capacity.

Outlook drivers

↑ Upgrade triggers

  • Kashiwazaki-Kariwa and other restarts ease the eastern balance.
  • Frequency-converter capacity to the west rises toward 3 GW by 2027.

↓ Downgrade triggers

  • Restart delays keep the east tight.
  • Cold snaps or low solar trigger fresh shortage warnings.

Scheduled to change

Dated, already-announced events that will affect a large load sited here, in date order. These are published facts with sources, not our forecasts, and they matter most when your energization date is years out.
By 2027
Frequency-converter capacity between the 50Hz east and 60Hz west rises toward 3 GW
Lets the tight eastern grid draw more on the western surplus, easing the Tokyo-area balance.

Evidence behind this rating

The real-world events that test our Tier 4 call for Japan East (Tokyo, 50Hz): 1 supports it and 1 challenges it. Each is dated and cited, so you can check the rating against what is actually happening on the ground.

Kashiwazaki-Kariwa Unit 6 restarts: TEPCO's first reactor back since 2011 IN SERVICE ✓ Supports the rating
Feb 2026AvailabilityMateriality: high

Japan restarted Unit 6 of Kashiwazaki-Kariwa, its largest nuclear station, on 9 Feb 2026, reaching full operation around mid-March. It is TEPCO's first reactor to resume after the post-2011 shutdowns, and adds firm, non-emitting generation to the eastern system that Tokyo loads sit on. FOLLOW-THROUGH, NOT PROMISE: this one is delivering. The caution sits next door, where TEPCO has pushed Unit 7 back to 2029 or 2030, and where national policy for FY2040 assumes far more reactors running than operate today.

Power to a buyer: Real electrons, now. The unit has been back on the TEPCO system since 9 Feb 2026. This is the rare case where the announcement and the delivery are the same event.
Source: US Energy Information Administration ↗
Kashiwazaki-Kariwa Unit 7 restart pushed to 2029-2030 ANNOUNCED ▲ Challenges the rating
Feb 2026AvailabilityMateriality: med

TEPCO has delayed the restart of Unit 7, a second reactor of the same size at the same station, to 2029 or 2030. Recorded separately from the Unit 6 restart because the two are routinely reported together as one recovery story, and they are not: one is generating and one is a date that has already moved. Japan's FY2040 nuclear policy target needs far more reactors operating than run today.

Power to a buyer: Nothing before 2029 at the earliest, and only if the restart programme holds. Unit 7 is deferred, not cancelled.
Source: US Energy Information Administration ↗
Cited, dated developments tagged to the pillar they bear on, and whether they support or challenge the current tier. A material item flags the market for analyst review and may drive a rating action.

Dispute this rating. If you have evidence we’ve missed or misread, email hello@powergridiq.com. We log every dispute and reply within 10 business days.

Rating history

Oct 2026
AffirmedCost-pillar score 22 to 35: now set by one published rule from the band midpoint ($160/MWh), not by analyst judgement. The band itself is unchanged. PGIQ Rating 40 to 43. Tier 4 Constrained unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
June 2026
New ratingNew rating: Tier 4 Constrained assigned (eastern 50Hz grid).
Every rating action is dated and explained, and the log is only ever added to, never edited. Reviews happen on a regular schedule and whenever a significant event occurs. "Affirmed" means we reviewed a development and the tier held; "Under review" means a significant item is being assessed and the rating could change.

Data provenance and freshness

What we hold for this market, field by field. Each grade is set by the evidence we actually hold for that pillar. A low grade means we looked and the evidence is thin; it is not a verdict on the market.
PillarEvidence gradeWhat that means
CostBroad (M1)Directional: good for screening and monitoring
ConnectionMarket-level (M2)Good for comparing markets, not for a site
ReliabilityMarket-level (M2)Good for comparing markets, not for a site
CarbonMarket-level (M2)Good for comparing markets, not for a site
RegulatoryNot assessedWe hold no evidence for this yet
Local capacityNot assessedWe hold no substation-level evidence
Good enough for: screening and monitoring and comparing markets. Not yet good enough for: a priced project case, a project case with a carbon requirement, or site-level diligence. The weakest field is cost.
Depth is not a rating strength, a confidence score or a feasibility conclusion. See the full coverage matrix. Version details: evidence-grade definitions v1.0.
How solid the data behind this rating is, on two separate axes plus recency. Source strength is how measured the numbers are, as opposed to triangulated or modelled. Coverage is how many of the decision-relevant data dimensions (reliability, connection, and cost) are compiled for this market. The two are kept apart because they answer different questions: a market can have strong sources on the little that is covered, or broad coverage that still leans on models. Neither grades the rating itself. The rating is a cited opinion, graded separately and falsifiably by the public track record and baseline measurement plan.

Source strength

Moderate

2 of 3 data layers directly measured; the rest are triangulated or modelled

Coverage

Full

3 of 3 dimensions: reliability, connection, cost

Last reviewed

June 2026

per-layer vintages below

LayerMethodVintageFreshnessSource
PGIQ Rating opinionopinionJune 2026CurrentPGIQ methodology
ReliabilitymeasuredFY2024FreshJapan OCCTO quality of supply
Connection frictionmeasured2025/26FreshIntrol: Japan data-center power crisis
Realized costmodelled2026FreshJapan business electricity price (GlobalPetrolPrices)

Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.

What this market can and cannot answer yet

No market-level read closes a project case on its own, and saying only that would waste the evidence we do hold. Below is what is established, what is open, and what to do next.

What is established

  • Recurring cost band $135 to $190 per MWh, midpoint $160, basis modelled, against the 100 MW archetype
  • Historical utility-territory delivery performance 24.0 minutes per year (FY2024)
  • Forward resource adequacy (assessed)

What is open

  • Contractual service terms (would change the answer)
  • Designed site resilience
  • Regulatory evidence
  • Substation-level capacity evidence

How service and connection are organized

Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.

Credible ranges today

  • Cost $135 to $190 per MWh, midpoint $160 (modelled)

What could disqualify this market

  • Structural isolation from the western surplus (about 1.2 GW of converters today).
  • Slow nuclear restart in the east.

Questions to put to the utility

These come from the gaps in our record for Japan East (Tokyo, 50Hz): the decision points we have not assessed. Put each one to the utility, network operator or regulator before relying on this market for a project. A gap is not evidence that the risk is absent; it means we have not assessed it.
  1. Are the connection rules for large loads changing? What has been proposed or decided, and when does it take effect?
    Why it is open: no dated regulatory read compiled for this market yet.
  2. What firm capacity is available at the substation we would connect to, and when? Needed for a project case
    Why it is open: no operator publication of area or substation capacity found for this market.

The same list as JSON: /api/v1/markets/japan-east/gaps

Generated with the report at each build; free, like the report. For information only; not investment, engineering or procurement advice.