Singapore
The evidence behind the PGIQ Rating, exactly as printed on powergridiq.com/rating/singapore, with every section open. As of June 2026.
The five pillars behind the tier
Near-closed access: a data-center growth cap and no spare land/power.
Very tight availability.
Very high cost.
High historical momentum, now capped.
Carbon moderate (~390 g), gas.
Reliability overlay
Historical bulk-system performance: No reliability flags found
Historical utility-territory delivery performance: No reliability flags found
Average customer interruption (SAIDI) of 0.26 minutes per year in 2024, excluding major event days as filed.
measured · Singapore Energy Market Authority
Forward resource adequacy (assessed): Adequacy flagged
Modelled read: very reliable delivery, but an import- and gas-constrained island with little domestic resource margin.
What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.
modelled
Contractual service terms: not assessed
We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.
Designed site resilience: not applicable at market level
Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.
Reliability metrics
Delivery reliability (measured)
The average customer loses about 0.26 minutes of power per year (2024). This is the standard regulator outage measure (SAIDI); lower means a more reliable grid.
This is one operator’s own filed record for its whole territory. It is not a read on any particular substation or feeder, and it applies to a project only once the site is confirmed to sit inside that territory.
Supply relief outlook
What this means: The supply picture looks likely to tighten; a new load should lock firm supply early and expect competition for capacity.
Outlook drivers
↑ Upgrade triggers
- Green data-center criteria unlock limited new capacity.
- Regional (Johor/Batam) overflow.
- Imported low-carbon power.
↓ Downgrade triggers
- The cap tightens.
- No land or spare power.
Rating history
Data provenance and freshness
| Pillar | Evidence grade | What that means |
|---|---|---|
| Cost | Not assessed | We hold no evidence for this yet |
| Connection | Not assessed | We hold no evidence for this yet |
| Reliability | Market-level (M2) | Good for comparing markets, not for a site |
| Carbon | Market-level (M2) | Good for comparing markets, not for a site |
| Regulatory | Not assessed | We hold no evidence for this yet |
| Local capacity | Not assessed | We hold no substation-level evidence |
Source strength
High
All 1 data layers are directly measured
Coverage
Partial
1 of 3 dimensions: reliability, connection, cost
Last reviewed
June 2026
per-layer vintages below
| Layer | Method | Vintage | Freshness | Source |
|---|---|---|---|---|
| PGIQ Rating opinion | opinion | June 2026 | Current | PGIQ methodology |
| Reliability | measured | 2024 | Fresh | Singapore Energy Market Authority |
Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.
What this market can and cannot answer yet
What is established
- Historical utility-territory delivery performance 0.26 minutes per year (2024)
- Forward resource adequacy (assessed)
What is open
- Contractual service terms (would change the answer)
- Designed site resilience
- Cost evidence (would change the answer)
- Connection evidence (would change the answer)
- Regulatory evidence
- Substation-level capacity evidence
How service and connection are organized
Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.
Credible ranges today
- No cost or schedule range is compiled for this market.
What could disqualify this market
- Growth cap and land/power scarcity.
- Cost.
Questions to put to the utility
- What would a 100 MW load at a 95% load factor, on high-voltage service, pay per MWh all in, under the tariff it would actually be served on? Needed for a project caseWhy it is open: no compiled cost band for this market yet.
- How long is it from a complete application being accepted to full firm energization of the MW we need, and which milestones (initial, phased, temporary or conditional energization) would come first? Needed for a project caseWhy it is open: no countable queue or operator-published process for this market.
- Are the connection rules for large loads changing? What has been proposed or decided, and when does it take effect?Why it is open: no dated regulatory read compiled for this market yet.
- What firm capacity is available at the substation we would connect to, and when? Needed for a project caseWhy it is open: no operator publication of area or substation capacity found for this market.
The same list as JSON: /api/v1/markets/singapore/gaps