Spain
The evidence behind the PGIQ Rating, exactly as printed on powergridiq.com/rating/spain, with every section open. As of June 2026.
Realized cost band
Recurring cost, delivered
$82 to $118 per MWh
Midpoint about $98 per MWh
What builds the $98 midpoint
Where the cost lands
Spain's heavy solar build gives it one of the lower western-European bands, with midday wholesale prices frequently depressed. Network charges and evening ramp costs lift the delivered figure, but a flexible large load can capture the cheap daytime hours.
This market's band is free here; the ranked cross-market table with every market's precise midpoint is the Analyst Desk. See the ranked view.
Basis: Triangulated (built from several public data fragments cross-checked against each other, rather than one single measured figure). In US dollars per MWh delivered to a large high-load-factor load, excluding refundable taxes. Sources: Non-household electricity prices (Eurostat).
Connection friction
Friction level
High
This market's friction level, wait band and full story are free here. Every market's wait in months, ranked side by side, is the Analyst Desk.
Around 83% of distribution-grid nodes are saturated and only about 25% of transmission nodes have demand capacity (Red Electrica). Madrid's data-center capacity has sat near 792 MW for six months while Barcelona and Aragon grew. Companies requested 19.28 GW of new demand connections in 2024 and less than half were accepted. Red Electrica published demand access-capacity maps in February 2026 under a new framework; the ministry frames the bottleneck as permit hoarding rather than pure physical saturation.
Data-center share of demand pressure: High. Sources: Red Electrica: demand access capacities (Feb 2026) · Spain new grid access rules, Strategic Energy. The full cross-market connection dataset is available through the Connection Friction Feed.
The five pillars behind the tier
Opening access; growing hub activity in Madrid and Aragon.
Good availability with strong solar and wind.
Competitive Iberian wholesale.
Improving momentum.
Clean-ish (~80-130 g).
Reliability overlay
Historical bulk-system performance: Reliability flags found
The April 28, 2025 Iberian blackout cut power across peninsular Spain for about ten hours, one of the most significant blackouts in European history, driven by voltage and reactive-power control failures and cascading generator disconnections. Grid-code reform and remediation are underway.
What this means: A large new load should expect genuine exposure to forced power cuts (curtailment), price spikes, and delays in getting connected, and should design in backup power or firm supply contracts.
event-based · 2025 Iberian blackout, ENTSO-E expert panel
Historical utility-territory delivery performance: No reliability flags found
Forward resource adequacy (assessed): Adequacy flagged
High renewable share with evolving voltage and inertia management; reforms in progress after the 2025 event.
What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.
modelled
Contractual service terms: not assessed
We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.
Designed site resilience: not applicable at market level
Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.
Supply relief outlook
What this means: The supply crunch looks likely to ease for a new load energizing here in the coming years.
Regulatory momentum
Why: Nearly 90 percent of Spain's transmission has little or no spare demand capacity, and Red Electrica's first demand access-capacity maps (2 February 2026) show only about a quarter of nodes with room; Royal Decree-Law 7/2026 is now forcing paper projects to pay a capacity-reservation charge or release their permits, while REE's 2026-2030 plan adds 27.7 GW of new demand access.
What would change the read: RDL 7/2026 clearing speculative permits and REE's new capacity actually freeing nodes for real large loads.
Outlook drivers
↑ Upgrade triggers
- Madrid/Aragon build accelerates.
- Solar-plus-storage firms supply and lowers cost.
↓ Downgrade triggers
- Grid-connection bottlenecks.
- Heat and water constraints.
Rating history
Data provenance and freshness
| Pillar | Evidence grade | What that means |
|---|---|---|
| Cost | Project-ready (M3) | Enough to price a project case |
| Connection | Market-level (M2) | Good for comparing markets, not for a site |
| Reliability | Market-level (M2) | Good for comparing markets, not for a site |
| Carbon | Market-level (M2) | Good for comparing markets, not for a site |
| Regulatory | Market-level (M2) | Good for comparing markets, not for a site |
| Local capacity | Not assessed | We hold no substation-level evidence |
Source strength
Moderate
1 of 3 data layers directly measured; the rest are triangulated or modelled
Coverage
Full
3 of 3 dimensions: reliability, connection, cost
Last reviewed
June 2026
per-layer vintages below
| Layer | Method | Vintage | Freshness | Source |
|---|---|---|---|---|
| PGIQ Rating opinion | opinion | June 2026 | Current | PGIQ methodology |
| Reliability review | historical | 2025 | Fresh | 2025 Iberian blackout, ENTSO-E expert panel |
| Connection friction | measured | 2025/26 | Fresh | Red Electrica: demand access capacities (Feb 2026) |
| Realized cost | triangulated | 2026 | Fresh | Non-household electricity prices (Eurostat) |
Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.
What this market can and cannot answer yet
What is established
- Recurring cost band $82 to $118 per MWh, midpoint $98, basis triangulated, against the 100 MW archetype
- Historical bulk-system performance (event-based)
- Forward resource adequacy (assessed)
What is open
- Historical utility-territory delivery performance (would change the answer)
- Contractual service terms (would change the answer)
- Designed site resilience
- Substation-level capacity evidence
How service and connection are organized
Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.
Credible ranges today
- Cost $82 to $118 per MWh, midpoint $98 (triangulated)
What could disqualify this market
- Connection-queue growth.
- Summer heat/water.
Questions to put to the utility
- How long is it from a complete application being accepted to full firm energization of the MW we need, and which milestones (initial, phased, temporary or conditional energization) would come first? Needed for a project caseWhy it is open: no countable queue or operator-published process for this market.
- What is the measured outage record (SAIDI) for the network that would serve our site, as filed with the regulator, and for which years? Needed for a project caseWhy it is open: no regulator outage series compiled for this market yet.
- What firm capacity is available at the substation we would connect to, and when? Needed for a project caseWhy it is open: no operator publication of area or substation capacity found for this market.
The same list as JSON: /api/v1/markets/spain/gaps