⚡ POWERGRIDIQ · EVIDENCE PACK

Sweden South (Malmo, SE4)

The evidence behind the PGIQ Rating, exactly as printed on powergridiq.com/rating/sweden-south, with every section open. As of June 2026.

Back to the report

Realized cost band

What a large electricity user pays for power here on one declared case, 100 MW contracted demand, 95% load factor, HV service, per megawatt-hour. Not the wholesale price and not the sticker tariff: energy plus the grid, delivery and other charges that land on the bill. It is a range, because real contracts vary, and it is labelled by how it was built.

Recurring cost, delivered

$70 to $115 per MWh

Midpoint about $90 per MWh

How this band was built

modelled

From 2 public fragments

What builds the $90 midpoint

Illustrative allocation of the compiled midpoint. Component lines are not separately sourced and should not be interpreted as observed tariff charges.
$65
$18
Energy (SE4, continental-linked)$65
Network & grid fees$18
Taxes & levies$7
All-in delivered$90 /MWh
How the $90/MWh figure is built up, component by component, for 100 MW contracted demand, 95% load factor, HV service. The allocation is our estimate; the total is the midpoint of the compiled band (modelled). Recurring cost only: customer-funded connection capital is a separate one-off and is not included. SE4 (Malmo and Skane) is import-dependent and coupled to Germany and Poland via undersea links, so its energy runs well above the northern SE1/SE2 zones, often two to four times higher. Anchored to published figures (SE4 southern Sweden electricity prices (statsskuld)). How this is built →
What the classes mean →

Where the cost lands

$90
Low $70Midpoint $90High $115
A band, not a single price: the cheaper end is a well-structured contract on favourable terms, the higher end a less optimised one. The midpoint is our best central read.
What is in the number: SE4 energy, import-linked to continental Europe and much higher than northern Sweden, plus network charges and taxes.

Southern Sweden (SE4) is the country's priciest zone: it runs a deficit and imports from Denmark, Germany and Poland over a constrained north-south corridor, so a large load pays the Skane premium and tracks continental prices, well above the cheap northern hydro band.

This market's band is free here; the ranked cross-market table with every market's precise midpoint is the Analyst Desk. See the ranked view.

Basis: Modelled (estimated from a model and structural indicators where direct published figures are limited). In US dollars per MWh delivered to a large high-load-factor load, excluding refundable taxes. Sources: SE4 southern Sweden electricity prices (statsskuld) · Non-household electricity prices (Eurostat).

Connection friction

How hard it is to connect a large new load here, and how long it takes. Part of the PowerGridIQ Connection Friction Feed. Labelled estimate; confidence Med.

Friction level

Moderate

Typical connection wait

2 to 4 years

This market's friction level, wait band and full story are free here. Every market's wait in months, ranked side by side, is the Analyst Desk.

The import-dependent south is materially tighter than the surplus north.

Southern Sweden (SE4) leans on power imported from the north and the continent over constrained transmission, so connection and price conditions are materially tighter than the northern zones, though still better than core Western Europe.

What builds the 36-month wait

5
10
9
12
Application & site5 mo
Grid study & connection offer10 mo
Agreement & works planning9 mo
Construction & energization12 mo
Typical time to energization36 months
How the typical connection wait breaks down by stage. Stages overlap in practice and vary by project; the split is our estimate anchored to the operator process, and the total is the representative time to energization. Anchored to the operator process (Argus: Nordic data centres and power demand).

Data-center share of demand pressure: Moderate. Sources: Argus: Nordic data centres and power demand. The full cross-market connection dataset is available through the Connection Friction Feed.

The five pillars behind the tier

A
A
C
M
C
The pillar signature: Access, Availability, Cost, Momentum, Carbon, taller is stronger. The same shape repeats across every market so peers compare at a glance.
Access30%55

Tighter access: a demand region dependent on imports and constrained north-south transfer.

Availability25%52

Lower availability: SE4 runs a deficit and leans on interconnectors when the continent is short.

Cost25%68

Pricier power: SE4 (Malmo) runs 2-4x the SE1 price, though still cheaper than continental peaks.

Momentum15%45

Lower momentum than the north; the hyperscale build sits up north.

Carbon5%90

Clean but slightly less so than the north, given fossil-tinged imports.

Default weights, which lean toward cost and access rather than carbon: Access 30 · Availability 25 · Cost 25 · Momentum 15 · Carbon 5. Momentum reflects the data-center build already underway, not just stated intentions.

Reliability overlay

Reliability adjustment: the five-pillar score of 58 is reduced to 54, a deduction of 4 points, reflecting the delivery-reliability and firm-supply risks flagged below. Reliability is reported as five separate layers, never as one combined label, because they answer different questions and a strong answer on one does not cover a gap in another: what has actually failed on the bulk system, what a forward assessment expects of firm supply, how the local network performs, what your contract actually promises, and what your site is designed to ride through. Any one of them can cap the tier.

Historical bulk-system performance: Minor flags found

The load-heavy south depends on north-south transfer over a limited trunk grid and on imports from Denmark, Germany and Poland; constrained transfer can leave it exposed when the continent is short.

What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.

measured · Sweden north-south deficit and imports (Seoul Economic)

Historical utility-territory delivery performance: No reliability flags found

Forward resource adequacy (assessed): Adequacy flagged

SE4 runs a structural deficit and imports at 2-4x the northern price; adequacy improves only as transmission and planned southern nuclear (2030s) arrive.

What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.

assessed

Contractual service terms: not assessed

We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.

Ask the utility for the tariff or service agreement terms before relying on firm supply.

Designed site resilience: not applicable at market level

Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.

Confidence: Med-High. Each input is labelled as measured, modelled, or drawn from a specific event, and is framed as a risk to a prospective large new load, not as a verdict on any utility or grid operator. Forward adequacy is an assessment of what is expected, not a measurement of what has happened; it is a forecast and is labelled as one.

Supply relief outlook

Will the power crunch ease before your load energizes? This nets the demand racing for capacity against the new supply likely to arrive and the old supply leaving. A cross-side read, using the same data a seller sees the other way.
Balanced
Demand pressure
Moderate load growth competing for the same capacity.
Future firm supply
Future firm supply: adequacy flagged.

What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.

Outlook drivers

↑ Upgrade triggers

  • North-south transmission upgrades cut the price gap.
  • New southern nuclear (planned for the 2030s) adds firm local supply.

↓ Downgrade triggers

  • Continental scarcity spikes southern prices.
  • Transmission delays keep the south import-dependent.

Rating history

Oct 2026
AffirmedCost-pillar score 72 to 68: now set by one published rule from the band midpoint ($90/MWh), not by analyst judgement. The band itself is unchanged. PGIQ Rating 55 to 54. Tier 3 Workable unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
June 2026
New ratingNew rating: Tier 3 Workable assigned (southern zone SE4).
Every rating action is dated and explained, and the log is only ever added to, never edited. Reviews happen on a regular schedule and whenever a significant event occurs. "Affirmed" means we reviewed a development and the tier held; "Under review" means a significant item is being assessed and the rating could change.

Data provenance and freshness

What we hold for this market, field by field. Each grade is set by the evidence we actually hold for that pillar. A low grade means we looked and the evidence is thin; it is not a verdict on the market.
PillarEvidence gradeWhat that means
CostBroad (M1)Directional: good for screening and monitoring
ConnectionBroad (M1)Directional: good for screening and monitoring
ReliabilityMarket-level (M2)Good for comparing markets, not for a site
CarbonMarket-level (M2)Good for comparing markets, not for a site
RegulatoryNot assessedWe hold no evidence for this yet
Local capacityNot assessedWe hold no substation-level evidence
Good enough for: screening and monitoring and comparing markets. Not yet good enough for: a priced project case, a project case with a carbon requirement, or site-level diligence. The weakest fields are cost and connection.
Depth is not a rating strength, a confidence score or a feasibility conclusion. See the full coverage matrix. Version details: evidence-grade definitions v1.0.
How solid the data behind this rating is, on two separate axes plus recency. Source strength is how measured the numbers are, as opposed to triangulated or modelled. Coverage is how many of the decision-relevant data dimensions (reliability, connection, and cost) are compiled for this market. The two are kept apart because they answer different questions: a market can have strong sources on the little that is covered, or broad coverage that still leans on models. Neither grades the rating itself. The rating is a cited opinion, graded separately and falsifiably by the public track record and baseline measurement plan.

Source strength

Limited

1 of 3 data layers directly measured; the rest are triangulated or modelled

Coverage

Full

3 of 3 dimensions: reliability, connection, cost

Last reviewed

June 2026

per-layer vintages below

Source strength is limited: 1 of 3 data layers directly measured; the rest are triangulated or modelled. Confidence in the rating (High) is a separate judgement about the opinion as a whole, set in review; source strength grades only how directly the numbers underneath were measured.

LayerMethodVintageFreshnessSource
PGIQ Rating opinionopinionJune 2026CurrentPGIQ methodology
Reliability reviewmeasured2025FreshSweden north-south deficit and imports (Seoul Economic)
Connection frictionproxy2025/26FreshArgus: Nordic data centres and power demand
Realized costmodelled2026FreshSE4 southern Sweden electricity prices (statsskuld)

Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.

What this market can and cannot answer yet

No market-level read closes a project case on its own, and saying only that would waste the evidence we do hold. Below is what is established, what is open, and what to do next.

What is established

  • Recurring cost band $70 to $115 per MWh, midpoint $90, basis modelled, against the 100 MW archetype
  • Historical bulk-system performance (measured)
  • Forward resource adequacy (assessed)

What is open

  • Historical utility-territory delivery performance (would change the answer)
  • Contractual service terms (would change the answer)
  • Designed site resilience
  • Regulatory evidence
  • Substation-level capacity evidence

How service and connection are organized

Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.

Credible ranges today

  • Cost $70 to $115 per MWh, midpoint $90 (modelled)

What could disqualify this market

  • Import dependence and price volatility.
  • North-south bottleneck.

Questions to put to the utility

These come from the gaps in our record for Sweden South (Malmo, SE4): the decision points we have not assessed. Put each one to the utility, network operator or regulator before relying on this market for a project. A gap is not evidence that the risk is absent; it means we have not assessed it.
  1. What is the measured outage record (SAIDI) for the network that would serve our site, as filed with the regulator, and for which years? Needed for a project case
    Why it is open: no regulator outage series compiled for this market yet.
  2. Are the connection rules for large loads changing? What has been proposed or decided, and when does it take effect?
    Why it is open: no dated regulatory read compiled for this market yet.
  3. What firm capacity is available at the substation we would connect to, and when? Needed for a project case
    Why it is open: no operator publication of area or substation capacity found for this market.

The same list as JSON: /api/v1/markets/sweden-south/gaps

Generated with the report at each build; free, like the report. For information only; not investment, engineering or procurement advice.