Frequently asked questions
Is PowerGridIQ free?
Our full read of any single market is free, with no account: the rating, evidence, delivered-cost band and connection wait. Comparing every market side by side, with history and alerts, is the Analyst Desk ($600/month). The API is free up to 100 requests per UTC day per IP address.
Where does your data come from?
From public grid operators and data portals, the EIA (United States), IESO, Hydro-Québec and AESO (Canada), ENTSO-E (Europe), AEMO (Australia), Transpower (New Zealand), Eskom (South Africa), and weather from Open-Meteo, among others, plus tariffs, regulator filings and grid-operator notices. Every figure links back to its source, and our full approach is described on the Methodology page.
Is the data real-time?
Some of it. Grid Today shows live demand and fuel mix where an operator publishes a feed. Each figure is labelled Live, Recent, Derived from live fuel mix, Structural baseline or Modelled. Wholesale prices, imports and exports are modelled everywhere, because no live feed exists. Ratings, cost bands and connection waits are reviewed on a schedule, not in real time.
How accurate are the estimates?
Structural baselines are derived from operator annual reports, IEA/IRENA data and historical patterns. They describe the approximate seasonal state of a grid rather than its exact current condition. We label them clearly and never present an estimate as a live measurement.
Why do some regions show no live data?
Because no free, public, real-time feed exists for them. Japan's market data is restricted to licensed participants; parts of the Middle East publish only annual reports; ENTSO-E omits Swiss generation. We show the best available structural baseline and flag the gap rather than inventing a number.
What does “system firm margin” mean?
It is our market-wide estimate of de-rated firm capacity less peak demand, the figure rating pages show as system firm margin. It is a market-level screen, not capacity at the substation you would connect to: a market can look roomy while the specific bus you want has none available. Confirm local capacity with the utility.
What is the difference between wholesale price and delivered cost?
Wholesale is the energy price on the market. Delivered cost is the total a 100 MW, high-load-factor customer pays, including network charges, capacity, levies and taxes. It is usually much higher.
Why is a market's cost band missing?
We withhold a band when the evidence fails our standard, for example when a large load can't buy the published tariff. The market page says why.
How do you calculate carbon intensity?
By multiplying each fuel's share of the current generation mix by a standard emissions factor and summing the result. For the nine Canadian markets we serve Canada's national inventory figure instead, since 28 Sep 2026. Either way it is derived, never directly measured, and it does not feed the PGIQ Rating. See the methodology for a full explanation.
Can I use PowerGridIQ data in my own work or reports?
You can use it for research and planning. For anything formal or published, we recommend citing the original source (which we link) alongside PowerGridIQ, and noting whether a figure was live or estimated. Quote any single-market figure with a link to its market report and the month it is as of.
Who is PowerGridIQ for?
Teams siting a large load such as a data centre, AI cluster or industrial plant; developers selling power or building generation; lenders, investors and underwriters; infrastructure planners; and builders of software and AI agents, through our API and MCP server.
How often is the site updated?
Live sources refresh as often as the operator publishes, typically hourly, and as often as every two to five minutes for some markets. Structural baselines are refreshed when new annual data is published. Ratings, cost bands and connection waits are reviewed on a schedule, and every change is dated.
I found an error, or I operate a grid you should track. How do I reach you?
We welcome corrections and new public data sources. Email hello@powergridiq.com. Every market page also has a “Dispute this rating” link.