Power market changes

What changed, and why it matters

What changed in the markets we rate, and today's grid conditions, for teams siting a large new electricity load. Price and carbon are shown as separate signals: cheap hours and low-carbon hours overlap in some markets and not in others, so we do not blend them into one score. This is not the full ratings table. It shows what has moved recently, where modelled prices are lowest and derived carbon intensity is cleanest in the latest snapshot, the latest developments we have cited, and the state of the connection queues. For the full ratings, see all markets; for the record of our calls, see the track record.

Loading the latestโ€ฆ

Rating actions, newest first

Oct 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ ISO New England: Affirmed, no change, 31 Oct 2026. Closes the review opened in August 2026 when the Cost pillar was withdrawn. No official ISO-NE-wide delivered-cost figure is published, so the Cost pillar is recorded as not assessed at market scope rather than pending; the tier and the stable outlook rest on the other pillars. ISO-NE's 2027 work plan (22 Oct 2026) set the capacity-market redesign filing for end-2026 with the next auctions in 2028, and Vineyard Wind 1 settled its construction dispute (16 Sep 2026); neither adds new firm capacity to the 2027-2029 window. Revisit on the capacity-market redesign filing and ISO-NE's FERC large-load compliance filing due 16 Nov 2026.
Trigger: Cost pillar withdrawn; review opened 24 Aug 2026; ISO-NE 2027 work plan (22 Oct 2026)
Oct 2026
Affirmed๐Ÿ‡จ๐Ÿ‡ฆ Quebec: Affirmed, no change, 31 Oct 2026. Closes the cost-pillar review of the Hydro-Quรฉbec data-centre tariff. The Rรฉgie de l'รฉnergie has not ruled on case R-4333-2026: hearings ran 1-9 Oct 2026 and continue in December. On 26 Oct 2026 the Superior Court annulled the government decrees that backed the proposed rate; Hydro-Quรฉbec maintains its request. With no rate decided, the Cost assessment, tier and outlook are held. The Churchill Falls agreement remains non-binding and Gull Island is outside the outlook window. Revisit when the Rรฉgie decides R-4333-2026.
Trigger: Realized-cost review of the Hydro-Quebec data-centre tariff (Jul 2026); Rรฉgie case R-4333-2026
Oct 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM): Affirmed, no change, 23 Oct 2026. FERC accepted PJM's large-load definition and registry but rejected the Interim Resource Adequacy Service and bring-your-own-capacity rules on 9 Oct 2026, and accepted but suspended the Reliability Backstop Procurement on 29 Sep 2026. Neither settles who pays for new capacity or how a new large load connects; the cost and access pressure they leave in place is already carried by the negative outlook. Tier and outlook held. Revisit on PJM's refiling and the backstop paper hearing.
Trigger: FERC Section 206 show-cause order (18 Jun 2026); capacity shortfall at the cap; DOE 202(c) curtailment order; Virginia data-centre electricity tax; FERC order on the Reliability Backstop Procurement, 29 Sep 2026; FERC order rejecting Interim Resource Adequacy Service, 9 Oct 2026
Oct 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ CAISO (California): Affirmed, no change, 23 Oct 2026. Closes the cost-pillar review of California's non-bypassable and delivery charges. California is not yet in the compared delivered-cost set used by the cost-rescore release of 15 Oct 2026, so the analyst Cost assessment stands until a delivered band is added; we found no new official tariff decision since July that changes the read. Tier and outlook held.
Trigger: Realized-cost review of California non-bypassable and delivery charges (Jul 2026)
Oct 2026
Trigger: Realized-cost review of the EtihadWE large-load tariff (Jul 2026); cost-rescore release, 15 Oct 2026
Oct 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ ISO New England: Review extended 2026-10-23. The Cost pillar is not yet assessed, so the rating stays under review rather than being re-scored. Tier and outlook held. Superseded 31 Oct 2026: review closed, Affirmed.
Trigger: Review extended, approved 23 Oct 2026
Oct 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ NYISO (New York): Affirmed, no change, 23 Oct 2026. Empire State Development published the Community Investment Framework on 15 Sep 2026, a few days after the order's deadline. It is voluntary guidance for host communities and does not lift the permit pause under Executive Order 62, which was already in the Access read. Tier and outlook held. Revisit when the pause ends or the Department of Public Service finalises its data-centre rules.
Trigger: NY Legislature moratorium bill (4 Jun 2026); Executive Order 62, 14 Jul 2026; Community Investment Framework published, 15 Sep 2026
Oct 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ ERCOT (Texas): Affirmed, no change, 23 Oct 2026. ERCOT began issuing Batch Zero verification requests on 9 Sep 2026 and has not yet published verification outcomes. Inclusion stays conditional, but the pathway is moving, so tier and outlook are held. A durable screening regime that excludes good-faith loads would be grounds to revisit Access.
Trigger: Gov. Abbott directive and ERCOT market notice M-A080326-01, 3 Aug 2026; Batch Zero conditional classifications, 3 Sep 2026; Batch Zero verification requests, market notice M-A090926-01, 9 Sep 2026
Oct 2026
Under review๐Ÿ‡จ๐Ÿ‡ฆ Quebec: Review extended 2026-10-23. The cost read stays under review while we await the Regie de l'energie decision in case R-4333-2026, before deciding whether Quebec joins the cost comparison set. Tier and outlook held. Superseded 31 Oct 2026: review closed, Affirmed.
Trigger: Review extended, approved 23 Oct 2026; Regie de l'energie case R-4333-2026
Oct 2026
Affirmed๐Ÿ‡ฎ๐Ÿ‡ช Ireland (Dublin): Affirmed, no change, 23 Oct 2026. Closes the review opened on the conditional lift of the Dublin connection moratorium. New data-centre connections now require dispatchable generation alongside the load under the CRU policy and EirGrid's offer process; we found no published evidence that access in the constrained east has materially reopened. Tier and outlook held, with the upgrade path open if offers under the new process are issued and connected.
Trigger: Ireland lifts the Dublin moratorium with conditions (Dec 2025); CRU Large Energy Users connection policy; EirGrid data-centre connection offer process, version 3 (May 2026)
Oct 2026
Affirmed๐Ÿ‡จ๐Ÿ‡ฆ Newfoundland & Labrador: Affirmed, no change, 23 Oct 2026. The agreement remains non-binding and no definitive agreement has been signed. Quebec's incoming Parti Quebecois government has said it will review the deal and take it to the National Assembly rather than scrap it. Gull Island is planned for the next decade, outside the outlook window, so under our outlook guard rules a non-binding announcement does not move the tier or the outlook. Revisit when definitive agreements are executed.
Trigger: Churchill Falls and Gull Island Definitive Cooperation and Implementation Agreement, 17 Aug 2026 (non-binding); House of Assembly resolution, 17 Sep 2026; Quebec general election, 5 Oct 2026
Oct 2026
Downgrade๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM): Tier 2 Strong to Tier 3 Workable under the published tier rules: a PGIQ Rating of 52 sits in the Tier 3 band. No pillar evidence changed; markets with the same score now sit in the same tier.
Trigger: Tier rules published with the Oct 2026 ratings release (equal scores, equal tiers)
Oct 2026
Downgrade๐Ÿ‡บ๐Ÿ‡ธ MISO (Midwest): Tier 2 Strong to Tier 3 Workable under the published tier rules: a PGIQ Rating of 57 sits in the Tier 3 band. No pillar evidence changed; markets with the same score now sit in the same tier.
Trigger: Tier rules published with the Oct 2026 ratings release (equal scores, equal tiers)
Oct 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ MISO (Midwest): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 57 to 56. Tier 3 Workable unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฆ๐Ÿ‡ช United Arab Emirates: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 76 to 74. Tier 1 Prime unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Downgrade๐Ÿ‡บ๐Ÿ‡ธ ISO New England: Tier 3 Workable to Tier 4 Constrained under the published tier rules: a PGIQ Rating of 46 sits in the Tier 4 band. No pillar evidence changed; markets with the same score now sit in the same tier.
Trigger: Tier rules published with the Oct 2026 ratings release (equal scores, equal tiers)
Oct 2026
Affirmed๐Ÿ‡จ๐Ÿ‡ฆ Ontario: Tier 2 Strong affirmed; outlook Negative held. Pickering B is out of service for refurbishment, which was already in the supply-tightness read behind the negative outlook. The IESO's short-term firm import contract covers part of that gap for this winter only and does not change the forward picture: the outlook eases only when replacement firm capacity clears procurement.
Trigger: IESO short-term firm capacity import for winter 2026-27, 1 Oct 2026; Pickering B refurbishment construction start, 21 Sep 2026
Oct 2026
Affirmed๐Ÿ‡จ๐Ÿ‡ฆ Ontario: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 64 to 60. Tier 2 Strong unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Downgrade๐Ÿ‡บ๐Ÿ‡ธ NYISO (New York): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 48 to 47. Tier 3 Workable to Tier 4 Constrained.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡จ๐Ÿ‡ฆ Alberta: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 59 to 61. Tier 2 Strong unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฌ๐Ÿ‡ง Great Britain: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 41 to 47. Tier 4 Constrained unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฟ๐Ÿ‡ฆ South Africa: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 52 to 49. Tier 3 Workable unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฎ๐Ÿ‡ช Ireland (Dublin): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 32 to 31. Tier 5 Largely closed unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ณ๐Ÿ‡ฑ Netherlands: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 38 to 40. Tier 4 Constrained unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฎ๐Ÿ‡ณ India: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 57 to 55. Tier 3 Workable unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Downgrade๐Ÿ‡ต๐Ÿ‡น Portugal: Tier 2 Strong to Tier 3 Workable under the published tier rules: a PGIQ Rating of 57 sits in the Tier 3 band. No pillar evidence changed; markets with the same score now sit in the same tier.
Trigger: Tier rules published with the Oct 2026 ratings release (equal scores, equal tiers)
Oct 2026
Downgrade๐Ÿ‡ต๐Ÿ‡ฑ Poland: Tier 3 Workable to Tier 4 Constrained under the published tier rules: a PGIQ Rating of 47 sits in the Tier 4 band. No pillar evidence changed; markets with the same score now sit in the same tier.
Trigger: Tier rules published with the Oct 2026 ratings release (equal scores, equal tiers)
Oct 2026
Upgrade๐Ÿ‡ธ๐Ÿ‡ฐ Slovakia: Tier 4 Constrained to Tier 3 Workable under the published tier rules: a PGIQ Rating of 48 sits in the Tier 3 band. No pillar evidence changed; markets with the same score now sit in the same tier.
Trigger: Tier rules published with the Oct 2026 ratings release (equal scores, equal tiers)
Oct 2026
Downgrade๐Ÿ‡ฎ๐Ÿ‡ฑ Israel: Tier 3 Workable to Tier 4 Constrained under the published tier rules: a PGIQ Rating of 46 sits in the Tier 4 band. No pillar evidence changed; markets with the same score now sit in the same tier.
Trigger: Tier rules published with the Oct 2026 ratings release (equal scores, equal tiers)
Oct 2026
Upgrade๐Ÿ‡ฆ๐Ÿ‡บ Australia Victoria (Melbourne): Tier 4 Constrained to Tier 3 Workable under the published tier rules: a PGIQ Rating of 48 sits in the Tier 3 band. No pillar evidence changed; markets with the same score now sit in the same tier.
Trigger: Tier rules published with the Oct 2026 ratings release (equal scores, equal tiers)
Oct 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ ERCOT West (West Texas & Panhandle): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 68 to 67. Tier 2 Strong unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ณ๐Ÿ‡ด Norway: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 75 to 74. Tier 1 Prime unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Upgrade๐Ÿ‡ฉ๐Ÿ‡ช Germany North (Hamburg): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 57 to 59. Tier 3 Workable to Tier 2 Strong.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฉ๐Ÿ‡ช Germany South (Frankfurt/Munich): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 43 to 44. Tier 4 Constrained unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ธ๐Ÿ‡ช Sweden North (Lulea, SE1/SE2): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 78 to 77. Tier 1 Prime unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ธ๐Ÿ‡ช Sweden South (Malmo, SE4): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 55 to 54. Tier 3 Workable unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ซ๐Ÿ‡ท France: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 66 to 67. Tier 2 Strong unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Upgrade๐Ÿ‡ซ๐Ÿ‡ฎ Finland: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 69 to 74. Tier 2 Strong to Tier 1 Prime.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ช๐Ÿ‡ธ Spain: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 59 to 60. Tier 2 Strong unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ธ๐Ÿ‡ฆ Saudi Arabia: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 69 to 67. Tier 2 Strong unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Upgrade๐Ÿ‡ญ๐Ÿ‡ฐ Hong Kong: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 46 to 49. Tier 4 Constrained to Tier 3 Workable.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฎ๐Ÿ‡ฉ Indonesia: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 50 to 52. Tier 3 Workable unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฒ๐Ÿ‡พ Malaysia: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 55 to 57. Tier 3 Workable unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฏ๐Ÿ‡ต Japan East (Tokyo, 50Hz): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 40 to 43. Tier 4 Constrained unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡ฏ๐Ÿ‡ต Japan West (Osaka, 60Hz): Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 51 to 53. Tier 3 Workable unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Oct 2026
Affirmed๐Ÿ‡น๐Ÿ‡ผ Taiwan: Cost-pillar score now set by one published rule from the delivered-cost band, not by analyst judgement. The band itself is unchanged. PGIQ Rating 35 to 40. Tier 4 Constrained unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Sep 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM): Review continues, with one leg of the negative case slightly weaker. The DOE curtailment order was logged as an Availability negative with an Access read-through. The DC Circuit has now read section 202(c) narrowly in a different case, holding it is for genuine short term emergencies rather than standing policy. That order was not challenged here and remains in force, so nothing moves on the tier. Tier 2 holds; the cost grounds already logged are untouched.
Trigger: DC Circuit narrows Federal Power Act section 202(c), 11 Sep 2026
Sep 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ MISO (Midwest): Tier holds. One unit returning to its state approved retirement date does not move the tier, and the replacement plan was already in the availability read. The wider point is that federal emergency authority can no longer be assumed to backstop marginal retirements in this footprint, which removes an upside the rating never scored. Watch whether reserve margin assumptions relied on it.
Trigger: DC Circuit vacates the DOE section 202(c) order on J.H. Campbell, 11 Sep 2026
Sep 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ NYISO (New York): Review continues and the resolution date has moved. The July entry said tier direction was uncertain pending the state's rules. Those rules have not arrived: the Community Investment Framework was due under the executive order on 12 Sep 2026 and is not published. A twelve month moratorium whose replacement framework is already late is a longer effective closure than the order's face value implies, and that is the Access read. Tier 3 holds; we are not moving on a delay alone.
Trigger: Community Investment Framework not published by the EO 62 deadline, 12 Sep 2026
Sep 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ ERCOT (Texas): Review stays open, and is narrower than it was in August. The pathway is moving again: ERCOT has issued provisional Batch Zero classifications, which is more than the August entry could assume. But inclusion is conditional, energization still waits on a verification exercise ERCOT expects to take several months with no stated end date, and ERCOT has said it will not pursue every good cause exception requested, so some loads submitted in good faith will not make this batch. Tier 2 holds. Resolve when verification outcomes are published rather than on a calendar date.
Trigger: ERCOT Batch Zero conditional classifications, market notice M-A080326-04, 3 Sep 2026
Sep 2026
Affirmed๐Ÿ‡ฟ๐Ÿ‡ฆ South Africa: Tier holds, and the upgrade trigger set previously stays live. A second consecutive winter without load shedding, with availability at a six year high and diesel reliance down, is the sustained performance the trigger asked for on the demand-peak side. We said we would want a full summer peak before treating recovery as grounds for an upgrade, and that has not happened yet. Revisit after the 2026-27 summer.
Trigger: Eskom reports a load shedding free 2026 winter, energy availability factor (EAF) 67.79 percent, 7 Sep 2026
Aug 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM): Tier holds. The 22 Jul event caused no reliability impact and the sites behaved as designed, but the scale doubled versus 2024 and the correlated behaviour of a whole cluster is now a planning input rather than customer behaviour. Taken with the FERC direction to NERC, this confirms rather than changes the Availability call: dense, strained, and increasingly governed by rules written specifically for it. The market remains under review on the separate cost grounds already logged.
Trigger: 3 GW-plus data centre load transfer after the Ashburn line fault, 22 Jul 2026; FERC Docket RD26-7, 16 Jul 2026
Aug 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ MISO (Midwest): Tier holds. The commission was explicit that this is a procedural reset rather than a rejection, and the underlying project is still expected. It does illustrate the state-level siting risk behind data-centre-driven transmission in MISO, where the delivery path runs through a state commission that can restart the clock.
Trigger: PSC of Wisconsin rescinds the ATC completeness determination, 6 Aug 2026
Aug 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ SPP (Southwest Power Pool): Tier holds. The cancelled corridors were proposals, never designated, and SPP large-load access does not depend on federal backstop siting. Marginal negative for long-haul transmission optionality across the footprint, not a pillar move.
Trigger: DOE cancellation of three proposed National Interest Electric Transmission Corridors, 12 Aug 2026
Aug 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ ERCOT (Texas): Tier not moved, but the connection pathway that underpins the Access score is paused with no stated end date. A verification gate applied to every data centre large load, layered on Batch Zero, is a material change in how fast a large load can reach energization in the market we score as the fastest in the US. Direction is genuinely uncertain: a short verification exercise leaves the tier intact, a durable screening regime does not. Resolve after the Public Utility Commission of Texas (PUCT) open meeting on 20 Aug 2026. Update, Sep 2026: that date no longer applies; the September 2026 entry resolves the review when ERCOT publishes verification outcomes.
Trigger: Gov. Abbott directive and ERCOT market notice M-A080326-01, 3 Aug 2026; missed Batch Zero classification date, 7 Aug 2026
Aug 2026
Affirmed๐Ÿ‡ฌ๐Ÿ‡ง Great Britain: Tier holds. The proposal is a consultation, not in force, and it cuts both ways: a refundable fee of up to GBP 712,500 per MW is a real balance-sheet demand on a credible developer, but the intent is to strip the 125 GW demand-connection queue (Jun 2025; separate from the generation queue on /connection-friction) of projects that were never going to connect, which is what a serious large load needs. Revisit on the final decision after 16 Sep 2026; a fee at the top of the range with weak refund mechanics would be an Access negative.
Trigger: Ofgem consultation on data centre connection reforms, 29 Jul 2026
Aug 2026
Affirmed๐Ÿ‡ฆ๐Ÿ‡บ Australia (NEM): Tier holds for now. The obligation is advice, not law, with federal legislation targeted for early 2027 and AEMC implementation estimates of 12 months for the Renewable Electricity Guarantee of Origin (REGO) obligation and 24 to 36 months for registration and connection reform. Direction is clear even if timing is not: a large load in the NEM will have to fund new generation and firming rather than draw on existing supply, which raises the all-in cost of siting here and tightens Access. NSW moving first with REZ-style (renewable energy zone) access control sharpens that.
Trigger: AEMC advice to the Energy and Climate Change Ministerial Council (ECMC) 28 Jul 2026, released 5 Aug 2026; NSW Electricity Infrastructure Investment Amendment Bill 2026, 5 Aug 2026
Aug 2026
Affirmed๐Ÿ‡ฟ๐Ÿ‡ฆ South Africa: Tier holds. A 441 day run and a daily EAF of 82.04%, the best since 2017, extend a recovery the rating already reflects and keep the previously set upgrade trigger live. We would want sustained performance through a full summer peak before treating this as grounds for an upgrade.
Trigger: Eskom performance update, 4 Aug 2026
Aug 2026
Affirmed๐Ÿ‡ฎ๐Ÿ‡ณ India: Tier holds. The revision roughly doubles the government's own view of data centre load by FY32 and is a Momentum positive, but it is a projection from state-reported projects, not built capacity, and the ministry itself flags grid balancing under sharp load ramps. Confirms the direction already in the rating rather than grounds to move it.
Trigger: Ministry of Power statement to Parliament, 27 Jul 2026
Jul 2026
Trigger: Overview reliability-adjustment consistency (methodology note, Jul 2026)
Jul 2026
Trigger: Overview reliability-adjustment consistency (methodology note, Jul 2026)
Jul 2026
Trigger: Overview reliability-adjustment consistency (methodology note, Jul 2026)
Jul 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM): A second consecutive capacity auction at the price cap confirms the structural cost pressure already reflected in the tier. Tier holds.
Trigger: 2028/29 BRA clears at the $325/MW-day cap with a 6.8 GW shortfall, 14 Jul 2026
Jul 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM): A statewide $0.011/kWh consumption tax stacks on capacity prices at the cap and DOE-ordered curtailment exposure; direction of the Cost pillar is clearly negative, tier impact under assessment.
Trigger: Virginia data-centre electricity tax effective 1 Jul 2026
Jul 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM): Two high-materiality negatives in one cycle: capacity cleared at the cap with a first-ever RTO-wide 6.6 GW reliability shortfall (Cost, Availability), and emergency authority to curtail data centres as a class (Availability, with Access read-through). Review continues; direction uncertain until the 2028/29 auction clears, tier could hold or move down one notch.
Trigger: 2027/28 BRA shortfall at cap (17 Dec 2025) plus DOE 202(c) large-load curtailment order (30 Jun 2026); 2028/29 BRA results due 14 Jul 2026
Jul 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ MISO (Midwest): Emergency procedures managed the heat dome without reported firm load shed. Consistent with the thin-margin availability profile already in the rating. Tier holds.
Trigger: Maximum generation emergency at ~122 GW demand, 15 Jul 2026
Jul 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ MISO (Midwest): Tier holds. The 35% load-growth forecast confirms demand momentum without changing near-term access or availability.
Trigger: MISO long-term load forecast, 13 Apr 2026
Jul 2026
Trigger: Realized-cost review of California non-bypassable and delivery charges (Jul 2026)
Jul 2026
Trigger: Realized-cost review of the EtihadWE large-load tariff (Jul 2026)
Jul 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ NYISO (New York): A statewide permit pause at 50 MW+ is a direct hit to Access in force today. Duration and the shape of the successor framework are unclear; tier direction uncertain pending the state's rules.
Trigger: Executive order imposing a statewide data-centre moratorium, 14 Jul 2026
Jul 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ ERCOT (Texas): Tier holds. Formal PUCT approval of Batch Zero adds regulatory certainty to large-load access; queue discipline supports, not weakens, the rating.
Trigger: PUCT approval of Batch Zero, 18 Jun 2026
Jul 2026
Trigger: Methodology v2 reliability overlay; NERC 2024 Long-Term Reliability Assessment elevated-risk finding
Jul 2026
Affirmed๐Ÿ‡จ๐Ÿ‡ฆ Quebec: Tier holds. The tariff is still a proposal and its in-force date has slipped; no change until the Regie rules.
Trigger: Regie hearing timing update, Jul 2026
Jul 2026
Trigger: Realized-cost review of the Hydro-Quebec data-centre tariff (Jul 2026)
Jul 2026
Affirmed๐Ÿ‡จ๐Ÿ‡ฆ Alberta: BYOG gives large loads a defined, if conditional, connection path after the interim tranche filled. Constructive for Access but untested until the first intake. Tier holds.
Trigger: Data Centre Regulation AR 117/2026 and AESO proposed BYOG process, Jun-Jul 2026
Jul 2026
Affirmed๐Ÿ‡ณ๐Ÿ‡ฑ Netherlands: Court ruling hardens the connection constraint the tier already prices in; tier holds.
Trigger: Haarlemmermeer waiting-list ruling (29 Apr 2026)
Jun 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM): FERC's preliminary finding that PJM's tariff is unjust for large loads puts co-location and cost-allocation economics directly in play; direction uncertain pending the 60-day response and any rulemaking. Tier held for now, flagged for review.
Trigger: FERC Section 206 show-cause order (18 Jun 2026)
Jun 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ MISO (Midwest): Named in the FERC show-cause suite; reform process is preliminary and procedural. Tier holds, monitoring the 17 Aug response.
Trigger: FERC Section 206 show-cause order (18 Jun 2026)
Jun 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ SPP (Southwest Power Pool): Named in the FERC show-cause suite; preliminary stage, tier holds, monitoring.
Trigger: FERC Section 206 show-cause order (18 Jun 2026)
Jun 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ CAISO (California): Named in the FERC show-cause suite; preliminary stage, tier holds, monitoring.
Trigger: FERC Section 206 show-cause order (18 Jun 2026)
Jun 2026
Affirmed๐Ÿ‡ฆ๐Ÿ‡ช United Arab Emirates: Tier 1 Prime affirmed on abundant firm gas capacity, an open pro-build stance, and a strong national AI-power agenda.
Trigger: National AI and data-centre build-out (2026)
Jun 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ ISO New England: Named in the FERC show-cause suite; preliminary stage, tier holds, monitoring.
Trigger: FERC Section 206 show-cause order (18 Jun 2026)
Jun 2026
Under review๐Ÿ‡บ๐Ÿ‡ธ NYISO (New York): A statewide 20 MW+ moratorium is one signature from law and would tighten access materially on top of the FERC order. Tier held pending the Governor's decision; downgrade path if signed. Update 14 Jul 2026: the Governor's Executive Order 62 paused environmental permits for data centres of 50 MW and above for up to one year. The 20 MW figure in the original call was the legislature's bill, which remains unsigned.
Trigger: NY Legislature data-centre moratorium passed (4 Jun 2026); FERC Section 206 order (18 Jun 2026)
Jun 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ ERCOT (Texas): Large-load demand surge reviewed; fast connect-and-manage energization and cheap self-supply gas keep the fundamentals strong.
Trigger: ERCOT large-load requests reach ~233 GW (Dec 2025)
Jun 2026
Affirmed๐Ÿ‡จ๐Ÿ‡ฆ Quebec: Proposed data-centre tariff reviewed; this is managed pricing inside an open, low-cost system, not a closure. Price remains the lowest in the set; Tier 2 affirmed, outlook unchanged.
Trigger: Hydro-Quebec ~13 cents/kWh tariff proposal (Jun 2026)
Jun 2026
Trigger: AESO Phase 1 fully allocated (12 Jun 2026)
Jun 2026
Affirmed๐Ÿ‡ฌ๐Ÿ‡ง Great Britain: Connection reform is delivering on schedule (Gate 2 offers issuing), supporting the positive outlook, but firm pre-2030 capacity stays scarce. Tier affirmed, outlook unchanged.
Trigger: NESO Gate 2 offers for pre-2030 projects (Jun 2026)
Jun 2026
Affirmed๐Ÿ‡ฆ๐Ÿ‡บ Australia (NEM): Queue disclosure and a maturing AEMC connection standard improve transparency and revealed build. Tier affirmed, positive outlook supported.
Trigger: AEMO 5.4 GW queue disclosure (Jun 2026)
Jun 2026
Affirmed๐Ÿ‡บ๐Ÿ‡ธ Pacific Northwest: Seattle's siting moratorium is consistent with the existing negative outlook; localised, not system-wide. Tier affirmed.
Trigger: Seattle data-centre moratorium (Jun 2026)
Jun 2026
Affirmed๐Ÿ‡ฟ๐Ÿ‡ฆ South Africa: The availability-recovery upgrade trigger set previously is now met: a full year without load-shedding. Tier affirmed; the formal upgrade review is due in the Jan 2027 release.
Trigger: One year with zero load-shedding (16 May 2026)
Jun 2026
Affirmed๐Ÿ‡ฟ๐Ÿ‡ฆ South Africa: Reliability recovery reviewed; a sustained run without load-shedding supports the availability read. Tier affirmed, with an upgrade trigger if the recovery holds.
Trigger: 231 consecutive days without load-shedding (2025)
Jun 2026
Under review๐Ÿ‡ฎ๐Ÿ‡ช Ireland (Dublin): The connection-moratorium lift is placed under review. Whether conditional, self-supply connections materially reopen access is being assessed; direction uncertain, with an upgrade path if access genuinely improves.
Trigger: Ireland lifts the Dublin moratorium with conditions (Dec 2025)
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ ERCOT (Texas): New rating: assigned, split into West and Central sub-regions.
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ ERCOT West (West Texas & Panhandle): New rating: Tier 2 Strong assigned (ERCOT West sub-region).
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ ERCOT Central (Houston & DFW): New rating: Tier 2 Strong assigned (ERCOT Central sub-region).
June 2026
New rating๐Ÿ‡ฆ๐Ÿ‡ช United Arab Emirates: New rating: Tier 1 Prime assigned (carbon-sensitive).
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฆ Quebec: New rating: Tier 2 Strong assigned (light policy override).
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM): New rating: Tier 2 Strong assigned (momentum override).
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ US Southeast (Atlanta): New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡ณ๐Ÿ‡ด Norway: Details in the market report.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฆ Ontario: New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ Pacific Northwest: New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡ง๐Ÿ‡ท Brazil (Sao Paulo): New rating: Tier 2 Strong assigned (low confidence).
June 2026
New rating๐Ÿ‡ฎ๐Ÿ‡ณ India: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฉ๐Ÿ‡ช Germany: New rating: Tier 3 Workable assigned (north/south split noted).
June 2026
New rating๐Ÿ‡ฉ๐Ÿ‡ช Germany North (Hamburg): New rating: Tier 3 Workable assigned (northern zone of Germany).
June 2026
New rating๐Ÿ‡ฉ๐Ÿ‡ช Germany South (Frankfurt/Munich): New rating: Tier 4 Constrained assigned (southern zone of Germany).
June 2026
New rating๐Ÿ‡ฎ๐Ÿ‡ช Ireland (Dublin): New rating: Tier 5 Largely closed assigned.
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ Desert Southwest (Phoenix): New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ SPP (Southwest Power Pool): New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ MISO (Midwest): New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ CAISO (California): New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ NYISO (New York): New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡บ๐Ÿ‡ธ ISO New England: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฆ British Columbia: New rating: Tier 2 Strong assigned (borderline Tier 1).
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฆ Manitoba: New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฆ Alberta: New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฆ Newfoundland & Labrador: New rating: Tier 3 Workable assigned (corrected from a naive surplus read).
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฆ Saskatchewan: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฆ New Brunswick: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฆ Nova Scotia: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ธ๐Ÿ‡ช Sweden: New rating: Tier 2 Strong assigned (borderline Tier 1).
June 2026
New rating๐Ÿ‡ธ๐Ÿ‡ช Sweden North (Lulea, SE1/SE2): New rating: Tier 1 Prime assigned (northern zones SE1/SE2).
June 2026
New rating๐Ÿ‡ธ๐Ÿ‡ช Sweden South (Malmo, SE4): New rating: Tier 3 Workable assigned (southern zone SE4).
June 2026
New rating๐Ÿ‡ซ๐Ÿ‡ท France: New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡ซ๐Ÿ‡ฎ Finland: New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡ช๐Ÿ‡ธ Spain: New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡ต๐Ÿ‡น Portugal: New rating: Tier 2 Strong assigned.
June 2026
New rating๐Ÿ‡ฆ๐Ÿ‡น Austria: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฉ๐Ÿ‡ฐ Denmark: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ง๐Ÿ‡ช Belgium: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ญ Switzerland: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฟ Czech Republic: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ท๐Ÿ‡ด Romania: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฑ๐Ÿ‡น Lithuania: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฎ๐Ÿ‡น Italy (Milan, North): New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ต๐Ÿ‡ฑ Poland: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฑ๐Ÿ‡ป Latvia: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ธ๐Ÿ‡ฐ Slovakia: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ฌ๐Ÿ‡ท Greece: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ญ๐Ÿ‡บ Hungary: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ง๐Ÿ‡ฌ Bulgaria: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ช๐Ÿ‡ช Estonia: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ญ๐Ÿ‡ท Croatia: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ฌ๐Ÿ‡ง Great Britain: New rating: Tier 4 Constrained assigned (momentum noted, no up-override).
June 2026
New rating๐Ÿ‡ธ๐Ÿ‡ฎ Slovenia: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ณ๐Ÿ‡ฑ Netherlands: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ธ๐Ÿ‡ฆ Saudi Arabia: New rating: Tier 2 Strong assigned (carbon-sensitive).
June 2026
New rating๐Ÿ‡ถ๐Ÿ‡ฆ Qatar: New rating: Tier 2 Strong assigned (carbon-sensitive).
June 2026
New rating๐Ÿ‡ช๐Ÿ‡ฌ Egypt: New rating: Tier 3 Workable assigned (low confidence).
June 2026
New rating๐Ÿ‡ฐ๐Ÿ‡ผ Kuwait: New rating: Tier 3 Workable assigned (carbon-sensitive).
June 2026
New rating๐Ÿ‡น๐Ÿ‡ท Turkey: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฎ๐Ÿ‡ฑ Israel: New rating: Tier 3 Workable assigned (low confidence).
June 2026
New rating๐Ÿ‡ฎ๐Ÿ‡ถ Iraq: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ฑ Chile: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡บ๐Ÿ‡พ Uruguay: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ด Colombia: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฆ๐Ÿ‡ท Argentina: New rating: Tier 3 Workable assigned (low confidence).
June 2026
New rating๐Ÿ‡จ๐Ÿ‡ท Costa Rica: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฐ๐Ÿ‡ท South Korea: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ญ๐Ÿ‡ฐ Hong Kong: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ต๐Ÿ‡ญ Philippines: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡น๐Ÿ‡ญ Thailand: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฎ๐Ÿ‡ฉ Indonesia: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฒ๐Ÿ‡พ Malaysia: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฏ๐Ÿ‡ต Japan: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฏ๐Ÿ‡ต Japan East (Tokyo, 50Hz): New rating: Tier 4 Constrained assigned (eastern 50Hz grid).
June 2026
New rating๐Ÿ‡ฏ๐Ÿ‡ต Japan West (Osaka, 60Hz): New rating: Tier 3 Workable assigned (western 60Hz grid).
June 2026
New rating๐Ÿ‡ฟ๐Ÿ‡ฆ South Africa: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ณ๐Ÿ‡ฟ New Zealand: New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฆ๐Ÿ‡บ Australia (NEM): New rating: Tier 3 Workable assigned.
June 2026
New rating๐Ÿ‡ฆ๐Ÿ‡บ Australia NSW (Sydney): New rating: Tier 3 Workable assigned (New South Wales).
June 2026
New rating๐Ÿ‡ฆ๐Ÿ‡บ Australia Victoria (Melbourne): New rating: Tier 4 Constrained assigned (Victoria).
June 2026
New rating๐Ÿ‡ฆ๐Ÿ‡บ Australia Queensland (Brisbane): New rating: Tier 3 Workable assigned (Queensland).
June 2026
New rating๐Ÿ‡น๐Ÿ‡ผ Taiwan: New rating: Tier 4 Constrained assigned.
June 2026
New rating๐Ÿ‡ธ๐Ÿ‡ฌ Singapore: New rating: Tier 4 Constrained assigned.
October 2026 ratings release โ†’ See the full track record โ†’