Delivered cost ยท bands dated to the year (2026) where recorded

What a large load pays for power, market by market

Every band is the recurring delivered cost for one declared customer: 100 MW at a 95% load factor, high-voltage service. It covers energy, network, capacity, taxes and levies. Connection capital is excluded and reported separately. This is not the wholesale price. 32 of the 84 rated market and regional views carry a band we compare here. Where no public rate exists for a new large load, we don't publish one and say why.

The declared case in full
  • Load size: 100 MW maximum contracted demand.
  • Load factor: 95%, about 832.2 GWh in a normal 8760-hour year, at a 0.95 lagging power factor.
  • Voltage: high-voltage service at a disclosed point of delivery, with N-1 at the supplying substation, transfer within 30 minutes.
  • Included: recurring energy, capacity, demand, transmission, distribution, loss, ancillary, reactive-power, tax, levy, carbon and commercial-supply charges, per MWh.
  • Excluded: customer-funded connection, substation and network-upgrade capital. It is a separate one-off cost and is never netted in.

Markets with a comparable band

Bands are comparable with each other, not a quote for your project. Change the load, load factor or voltage and the number changes. US dollars per megawatt hour, recurring.
Market Band, low to high ($/MWh)
one scale, $35 to $210
Where it sits
of 32
How built Lines evidencedConnection wait (free level) TierReport
๐Ÿ‡บ๐Ÿ‡ธ ERCOT Central (Houston & DFW)$55 to $95 Midpoint $•••Cheapest thirdTriangulated0% verified layerLow 1โ€“2 yr estimate2 Strong (Tier 2)Report →
๐Ÿ‡บ๐Ÿ‡ธ ERCOT West (West Texas & Panhandle)$42 to $80 Midpoint $•••Cheapest thirdTriangulated0% verified layerLow 1โ€“2 yr estimate2 Strong (Tier 2)Report →
๐Ÿ‡ซ๐Ÿ‡ฎ Finland$42 to $78 Midpoint $•••Cheapest thirdTriangulated0%Low 1โ€“3 yr estimate1 Prime (Tier 1)Report →
๐Ÿ‡ฎ๐Ÿ‡ฉ Indonesia$62 to $90 Midpoint $•••Cheapest thirdAdministeredno breakdownModerate 1โ€“2 yr (Batam) estimate3 Workable (Tier 3)Report →
๐Ÿ‡บ๐Ÿ‡ธ MISO (Midwest)$48 to $78 Midpoint $•••Cheapest thirdTriangulated0%High 2โ€“7 yr (modelled from the generation queue) modelled3 Workable (Tier 3)Report →
๐Ÿ‡ณ๐Ÿ‡ด Norway$40 to $75 Midpoint $•••Cheapest thirdModelled0%Low 1โ€“3 yr estimate1 Prime (Tier 1)Report →
๐Ÿ‡จ๐Ÿ‡ฆ Ontario$55 to $100 Midpoint $•••Cheapest thirdTriangulated0%High 3โ€“5 yr estimate2 Strong (Tier 2)Report →
๐Ÿ‡บ๐Ÿ‡ธ SPP (Southwest Power Pool)$42 to $68 Midpoint $•••Cheapest thirdTriangulated0%High 2โ€“7 yr (modelled from the generation queue) modelled2 Strong (Tier 2)Report →
๐Ÿ‡ธ๐Ÿ‡ฆ Saudi Arabia$50 to $58 Midpoint $•••Cheapest thirdAdministeredno breakdownLow 1โ€“3 yr estimate2 Strong (Tier 2)Report →
๐Ÿ‡ธ๐Ÿ‡ช Sweden North (Lulea, SE1/SE2)$35 to $65 Midpoint $•••Cheapest thirdModelled0%Low 1โ€“3 yr estimate1 Prime (Tier 1)Report →
๐Ÿ‡ฆ๐Ÿ‡ช United Arab Emirates$50 to $85 Midpoint $•••Cheapest thirdModelledno breakdownLow 1โ€“3 yr estimate1 Prime (Tier 1)Report →
๐Ÿ‡จ๐Ÿ‡ฆ Alberta$60 to $110 Midpoint $•••Middle thirdTriangulated0%Severe 5โ€“8 yr (queue capped) measured2 Strong (Tier 2)Report →
๐Ÿ‡ซ๐Ÿ‡ท France$88 to $122 Midpoint $•••Middle thirdTriangulated0%Moderate 3โ€“4 yr (fast track) measured2 Strong (Tier 2)Report →
๐Ÿ‡ฉ๐Ÿ‡ช Germany North (Hamburg)$100 to $145 Midpoint $•••Middle thirdTriangulated0%High 5โ€“8 yr estimate2 Strong (Tier 2)Report →
๐Ÿ‡ฎ๐Ÿ‡ณ India$75 to $125 Midpoint $•••Middle thirdModelled0%Moderate 2โ€“4 yr estimate3 Workable (Tier 3)Report →
๐Ÿ‡ฒ๐Ÿ‡พ Malaysia$90 to $115 Midpoint $•••Middle thirdTriangulated0%Moderate 1โ€“3 yr (Green Lane) estimate3 Workable (Tier 3)Report →
๐Ÿ‡บ๐Ÿ‡ธ NYISO (New York)$70 to $140 Midpoint $•••Middle thirdTriangulated0%High 3โ€“7 yr (modelled from the generation queue) modelled4 Constrained (Tier 4)Report →
๐Ÿ‡บ๐Ÿ‡ธ Northern Virginia (PJM)$82.63 (a point from the posted tariff)Middle thirdAdministered100%Severe 3โ€“9 yr (modelled from the generation queue) modelled3 Workable (Tier 3)Report →
๐Ÿ‡ฟ๐Ÿ‡ฆ South Africa$92 to $128 Midpoint $•••Middle thirdAdministeredno breakdownHigh 3โ€“5 yr estimate3 Workable (Tier 3)Report →
๐Ÿ‡ช๐Ÿ‡ธ Spain$82 to $118 Midpoint $•••Middle thirdTriangulated0%High permit-gated estimate2 Strong (Tier 2)Report →
๐Ÿ‡ธ๐Ÿ‡ช Sweden South (Malmo, SE4)$70 to $115 Midpoint $•••Middle thirdModelled0%Moderate 2โ€“4 yr estimate3 Workable (Tier 3)Report →
๐Ÿ‡น๐Ÿ‡ญ Thailand$90 to $125 Midpoint $•••Middle thirdAdministeredno breakdownModerate 2โ€“4 yr estimate3 Workable (Tier 3)Report →
๐Ÿ‡ฉ๐Ÿ‡ช Germany South (Frankfurt/Munich)$108 to $158 Midpoint $•••Most expensive thirdTriangulated0%Severe 7โ€“10 yr measured4 Constrained (Tier 4)Report →
๐Ÿ‡ฌ๐Ÿ‡ง Great Britain$118 to $168 Midpoint $•••Most expensive thirdTriangulated0%High 2โ€“6 yr (modelled from the generation queue) modelled4 Constrained (Tier 4)Report →
๐Ÿ‡ญ๐Ÿ‡ฐ Hong Kong$170 to $210 Midpoint $•••Most expensive thirdAdministeredno breakdownModerate 2โ€“3 yr estimate3 Workable (Tier 3)Report →
๐Ÿ‡ฎ๐Ÿ‡ช Ireland (Dublin)$130 to $180 Midpoint $•••Most expensive thirdModelled0% verified layerHigh 3โ€“5 yr (modelled from the generation queue) modelled5 Largely closed (Tier 5)Report →
๐Ÿ‡ฏ๐Ÿ‡ต Japan East (Tokyo, 50Hz)$135 to $190 Midpoint $•••Most expensive thirdModelled0%Severe 5โ€“10 yr measured4 Constrained (Tier 4)Report →
๐Ÿ‡ฏ๐Ÿ‡ต Japan West (Osaka, 60Hz)$125 to $175 Midpoint $•••Most expensive thirdModelled0%High 4โ€“8 yr estimate3 Workable (Tier 3)Report →
๐Ÿ‡ณ๐Ÿ‡ฑ Netherlands$108 to $150 Midpoint $•••Most expensive thirdTriangulated0%Severe 6โ€“10 yr measured4 Constrained (Tier 4)Report →
๐Ÿ‡ต๐Ÿ‡ญ Philippines$140 to $210 Midpoint $•••Most expensive thirdTriangulated0%Moderate 2โ€“4 yr estimate4 Constrained (Tier 4)Report →
๐Ÿ‡ฐ๐Ÿ‡ท South Korea$120 to $150 Midpoint $•••Most expensive thirdAdministeredno breakdownHigh 3โ€“5 yr estimate3 Workable (Tier 3)Report →
๐Ÿ‡น๐Ÿ‡ผ Taiwan$128 to $140 Midpoint $•••Most expensive thirdAdministeredno breakdownSevere 3โ€“5 yr estimate4 Constrained (Tier 4)Report →

No U.S.-wide average is published. Markets differ by utility and regulator, and an average would describe nowhere.

No national Canadian figure is published, for the same reason. Figures are in USD so every market compares on one scale. We don't publish a CAD conversion because we don't hold a dated exchange-rate source.

What this means for a siting shortlist

Cheapest bands in this view: Sweden North, Saudi Arabia and SPP. Widest uncertainty: Philippines ($140 to $210). 47 markets in this view have no published band: see why below.

Each market's own band, midpoint included, is free on its report. The full ranking with precise midpoints, every dated change and exports is the Analyst Desk.

Analyst Desk, $600/mo

Find any market's report from the ratings page. Enterprises can license the full feed via the design-partner brief.

Your Analyst Desk access shows each market's precise midpoint in the table above.

Selling or building power instead of buying it? See the same markets ranked by hunger for new supply on the Offtake grade →

Where we don't publish a band, and why

A market is out because its evidence does not yet support a like-for-like comparison, not because it is expensive or cheap.

No public rate a new large load can take.

  • ๐Ÿ‡บ๐Ÿ‡ธ Pacific Northwest Structural: Federal hydro allocations are largely committed and a new customer would pay a market premium above the federal rate.
    Details

    From the record: The published band was derived from the Bonneville Power Administration priority-firm rate, which a new large load cannot obtain: federal hydro allocations are largely committed and a new customer would pay a market premium above the federal rate. A tariff the standard archetype cannot purchase may not set a delivered-cost band.

    Band withdrawn: 20 August 2026.

    What is missing:

    • no delivered-cost basis is stated
    • no published band
    • no connection-voltage or serving-utility assumption is declared
    • Cost here is set by a bilateral arrangement rather than a posted rate, so no standardized band can represent it.
    • no figure stated in US dollars per MWh

    Next action: Obtain evidence for a service the archetype could actually contract. The existing figures cannot be repaired by recalculation.

  • ๐Ÿ‡บ๐Ÿ‡ธ US Southeast (Atlanta) Structural: Georgia closed its standard schedules to new large loads on 1 February 2025 and requires an individually negotiated contract instead.
    Details

    From the record: The band was anchored on a regulated bundled industrial tariff that a new 100 MW load cannot take: Georgia closed its standard schedules to new large loads on 1 February 2025 and requires an individually negotiated contract instead. The band's primary source was also EIA industrial monthly pricing, which may serve only as a lagged validation layer and not as the headline large-load price.

    Band withdrawn: 20 August 2026.

    What is missing:

    • no delivered-cost basis is stated
    • no published band
    • no connection-voltage or serving-utility assumption is declared
    • no figure stated in US dollars per MWh

    Next action: Filed or executed contract terms, or a published contract-based rate. Searching for a tariff schedule will not close it.

A rate decision is pending.

  • ๐Ÿ‡บ๐Ÿ‡ธ Desert Southwest (Phoenix) Structural: The Arizona Corporation Commission's decision is due by 31 December 2026.
    Details

    APS rate case seeking roughly +45% for extra-large load customers, alongside changes to the Extra High Load Factor rate that applies to data centres.

    If approved, the effective cost for a new large load in APS territory rises materially. This is a dated, cited risk to a future band, and it is deliberately reported here rather than inside one.

    From the record: The published band blended an effective regulated rate with APS's PROPOSED extra-large-load class of roughly +45%, which the Arizona Corporation Commission has not decided: the rate-case hearing closed 7 July 2026 and the Commission's vote is due by 31 December 2026. A pending proceeding may not set a current delivered cost. The band's primary source was also an ACC large-load workshop rather than a tariff.

    Band withdrawn: 20 August 2026.

    What is missing:

    • no delivered-cost basis is stated
    • no published band
    • no connection-voltage or serving-utility assumption is declared
    • no figure stated in US dollars per MWh

    Next action: Obtain evidence for a service the archetype could actually contract. The existing figures cannot be repaired by recalculation.

    Source: Arizona Corporation Commission, What's Next in the APS Rate Case (10 July 2026)

Cost is set by many utilities.

  • ๐Ÿ‡บ๐Ÿ‡ธ ISO New England Structural: The regional transmission layer is uniform and verifiable, but local transmission, distribution and retail demand charges are set by 32 serving utilities across six states and five regulators.
    Details

    From the record: A single delivered-cost estimate cannot be defended at ISO-NE-wide scope. The regional transmission layer is uniform and verifiable, but local transmission, distribution and retail demand charges are set by 32 serving utilities across six states and five regulators. The superseded values are recorded in the correction record, not here.

    Band withdrawn: 24 August 2026.

    What is missing:

    • no delivered-cost basis is stated
    • Cost availability: depends on the state or province. A comparable band needs a standard published cost.
    • no published band
    • no connection-voltage or serving-utility assumption is declared
    • no figure stated in US dollars per MWh

    Next action: Narrow to one serving utility and interconnection point, then apply that utility's local transmission and distribution tariff. No region-wide document will close it, because no regional body sets these charges.

Evidence still being gathered.

  • ๐Ÿ‡บ๐Ÿ‡ธ CAISO (California) Temporary: CAISO's cost read is under review, so its band is withheld until the review closes.
    Details

    Under review since: Jul 2026.

    What is missing:

    • Cost availability: cost still being decided. A comparable band needs a standard published cost.

    Next action: Resolve the methodology from first principles, then populate. Not a data-collection problem.

  • ๐Ÿ‡จ๐Ÿ‡ฆ Quebec Temporary: Quebec's cost review closed Affirmed, no change, on 31 Oct 2026; its band is held out of the comparison until the Rรฉgie decides R-4333-2026.
    Details

    What is missing:

    • Awaiting the Regie decision on R-4333-2026: the data-centre rate is not decided, so the band is not comparable today

    Next action: Revisit when the decision is issued.

  • Europe (18): Portugal, Austria, Denmark, Belgium, Switzerland, Czech Republic, Romania, Lithuania, Italy, Poland, Latvia, Slovakia, Greece, Hungary, Bulgaria, Estonia, Croatia, Slovenia. No delivered-cost band has been compiled for these markets yet.
    Details

    Next action: Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract.

  • Canada (6): Temporary British Columbia, Manitoba, Newfoundland & Labrador, Saskatchewan, New Brunswick, Nova Scotia. No delivered-cost band has been compiled for these markets yet.
    Details

    What each is missing:

    • no delivered-cost basis is stated
    • no published band
    • no connection-voltage or serving-utility assumption is declared
    • no figure stated in US dollars per MWh

    Next action: Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract.

  • Asia (1): Singapore. No delivered-cost band has been compiled for these markets yet.
    Details

    Next action: Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract.

  • Middle East (6): Qatar, Egypt, Kuwait, Turkey, Israel, Iraq. No delivered-cost band has been compiled for these markets yet.
    Details

    Next action: Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract.

  • Latin America (6): Brazil, Chile, Uruguay, Colombia, Argentina, Costa Rica. No delivered-cost band has been compiled for these markets yet.
    Details

    Next action: Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract.

  • Oceania (4): New Zealand, Australia NSW, Australia Victoria, Australia Queensland. No delivered-cost band has been compiled for these markets yet.
    Details

    Next action: Compile a delivered-cost band for the declared 100 MW case from sources a new large load could contract.

Structural means no amount of work here changes it. Temporary means evidence we have not finished gathering.

Of 12 U.S. markets assessed, 6 have a comparable band and 1 is an aggregate view of them (ERCOT (Texas)); 4 are excluded for structural reasons and 1 temporarily.

Of 9 Canadian markets assessed, 2 have a comparable band; 0 are excluded for structural reasons and 7 temporarily.

A market without a band stays in the product with its connection pathway, reliability and pending proceedings. Our API returns insufficient_evidence rather than a substitute figure.

What changed in cost

Dated changes to the delivered-cost record: cost-history events, rating actions on the cost pillar, corrections, withdrawn bands and decisions with a due date.

Decisions due

  • Decision due Desert Southwest: Arizona Corporation Commission: APS rate case seeking roughly +45% for extra-large load customers, alongside changes to the Extra High Load Factor rate that applies to data centres. Source →

Recorded changes, newest first

  • Rating action ISO New England: Affirmed: Affirmed, no change, 31 Oct 2026. Record →
  • Cost history CAISO: A method change: the arithmetic moved, not the market. History (JSON) →
  • Rating action United Arab Emirates: Affirmed: Affirmed, no change, 23 Oct 2026. Record →
  • Rating action ISO New England: Under review: Review extended 2026-10-23. Record →
  • Rating action ISO New England: Downgrade: Tier 3 Workable to Tier 4 Constrained under the published tier rules: a PGIQ Rating of 46 sits in the Tier 4 band. Record →
  • Cost history SPP, Northern Virginia, NYISO, ERCOT West, ERCOT Central: A method change: the arithmetic moved, not the market; 2 other value changes held for an editor to classify.
  • Cost history MISO: A method change: the arithmetic moved, not the market; 3 other value changes held for an editor to classify. History (JSON) →
  • Correction ISO New England: ISO New England region-wide delivered-cost estimate withdrawn. Record →
  • Cost history US Southeast: What can be published changed (a band withdrawn or restored, a breakdown withheld, or a review opened or closed). History (JSON) →
  • Correction Northern Virginia: Northern Virginia recurring cost estimate corrected. Record →
  • Band withdrawn US Southeast: The band was anchored on a regulated bundled industrial tariff that a new 100 MW load cannot take. Record →
  • Band withdrawn Pacific Northwest: The published band was derived from the Bonneville Power Administration priority-firm rate, which a new large load cannot obtain. Record →
  • Band withdrawn Desert Southwest: The published band blended an effective regulated rate with APS's proposed extra-large-load class of roughly +45%, which the Arizona Corporation Commission has not decided. Record →
  • Rating action United Arab Emirates: Under review. Details in the market report. Record →
  • Rating action Quebec: Under review. Details in the market report. Record →
  • Rating action Northern Virginia: Under review: A statewide $0.011/kWh consumption tax stacks on capacity prices at the cap and DOE-ordered curtailment exposure; direction of the Cost pillar is clearly negative, tier impact under assessment. Record →
  • Rating action CAISO: Under review. Details in the market report. Record →

Cost history has been recorded since 21 August 2026 for 6 markets with a band, 28 changes in all. None of them is classified as a market move. Cost history not yet recorded for 26 markets with a band. This is a gap in our coverage, not a sign that costs were stable.

What changed, when, and which market moved are free. The figures before and after each change are on the Analyst Desk. Each market's full history: GET /api/v1/cost-history/{id}

Reading the table

Lines evidenced. A midpoint and a breakdown that adds up to it are not the same as evidence. Where the share is 0%, the band is the compiled result and the component lines apportion its midpoint; they sum exactly because they were built to, which proves nothing about the split. Where it is 100%, every line stands on its own cited, dated source. A verified layer tag means part of that market's delivered cost has also been checked line by line against filed rate documents; it is published beside the band, never inside it. The column sits on this page because that is where someone decides how much to trust a comparison. How a line earns its provenance →

  • Administered: the market has no wholesale market, so the published, regulated tariff is the delivered cost and the band is tight.
  • Triangulated: built from several public sources cross-checked against each other: wholesale energy prices, capacity-auction clearing prices, published network charges and regulator filings.
  • Modelled: estimated from a model and structural indicators where direct published figures are limited.

Basis: shown per row (Administered, Triangulated or Modelled; definitions below). Where it sits places each band in the cheapest, middle or most expensive third of all 32 compared markets, by its midpoint. Connection wait is the free level shown on Connection friction, ranked.

Take the data

The same evidence behind every band, per market.

Cost evidence

Each market's delivered-cost band and its per-line provenance (realized_cost).

GET /api/v1/ratings/{id}

This table as JSON

The same rows, region by region, with the figure contract on every band.

GET /api/v1/cost?region=all

JSON (API) ยท API & MCP →

European day-ahead energy prices are published weekly on the price signal page. Energy is one part of a delivered bill, and it moves differently. European wholesale price signal →