A balanced nuclear-hydro-gas grid, but small and mid-cost; workable for moderate load, not a scale destination.
See live grid data →Workable access on a small system.
Limited availability for large new load.
Mid-range cost.
Little momentum.
Carbon moderate (~300 g).
Single-unit dependence: Point Lepreau (660 MW) anchors the system and returned Dec 14, 2025 from a planned outage; Belledune must stop burning coal in 2030, ten years before its planned retirement, with the replacement fuel undecided.
What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.
assessed · Point Lepreau returns to operation (NB Power) · Belledune 2030 conversion options (NB Power)
We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.
Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.
What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.
Every field above carries its own source and freshness. Price, imports and exports are modelled in every market because no feed supplies them. Carbon intensity is derived from the fuel mix.
Dispute this rating. If you have evidence we’ve missed or misread, email hello@powergridiq.com. We log every dispute and reply within 10 business days.
| Pillar | Evidence grade | What that means |
|---|---|---|
| Cost | Not assessed | We hold no evidence for this yet |
| Connection | Not assessed | We hold no evidence for this yet |
| Reliability | Market-level (M2) | Good for comparing markets, not for a site |
| Carbon | Market-level (M2) | Good for comparing markets, not for a site |
| Regulatory | Not assessed | We hold no evidence for this yet |
| Local capacity | Not assessed | We hold no substation-level evidence |
Limited
None of the 1 data layers is directly measured; they are triangulated or modelled
Partial
1 of 3 dimensions: reliability, connection, cost
June 2026
per-layer vintages below
Source strength is limited: none of the 1 data layers is directly measured; they are triangulated or modelled. Confidence in the rating (High) is a separate judgement about the opinion as a whole, set in review; source strength grades only how directly the numbers underneath were measured.
| Layer | Method | Vintage | Freshness | Source |
|---|---|---|---|---|
| PGIQ Rating opinion | opinion | June 2026 | Current | PGIQ methodology |
| Reliability review | assessed | 2025 | Fresh | Point Lepreau returns to operation (NB Power) |
Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.
Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.
The same list as JSON: /api/v1/markets/new-brunswick/gaps
How New Brunswick's reliability-adjusted score and tier have moved, month by month. Part of your Analyst Desk.
Done with New Brunswick? Browse every market or see conditions across every region.
This page is our full read on New Brunswick alone, and it is free. To decide where a large load should actually go, you need every market side by side, ranked on recurring cost and time-to-connect, with the history and alerts when your shortlist moves. That is the Analyst Desk.
With your Analyst Desk, compare New Brunswick against every market side by side, ranked on recurring cost and time-to-connect, with the full history and shortlist alerts.
Since 28 Sep 2026 we serve Canada's national inventory figure for New Brunswick: 362 gCO2e/kWh (2024, generation basis, preliminary). Where a live feed is available, the carbon figure in the live conditions on this page can differ: we derive that one hourly from the current fuel mix, so it moves through the day. Carbon intensity does not feed the PGIQ Rating.
Boundary: operational combustion, CO2-equivalent, per kWh delivered to the grid. Main activity producers only. ECCC National Inventory Report, Annex 7 →