Every number sourced, or withheld

Shortlist power markets for large loads: cost, wait and outlook, market by market.

PowerGridIQ rates 84 market and regional views (79 rated markets plus 5 regional overviews) on delivered cost for a declared 100 MW load, connection wait, reliability and outlook, with live grid conditions across 69 regions. Every field carries its source, date and method. Where the evidence doesn’t meet our standard, we say so instead of filling the gap.

World map of 69 rated market locations, coloured by tier
1 Prime 2 Strong 3 Workable 4 Constrained 5 Largely closed

The rated markets, coloured by tier. Open the full map →

Top markets

MarketTierDelivered cost band, $/MWhConnection wait
🇸🇪 Sweden North1$35$65○ estimate1 to 3 years
🇳🇴 Norway1$40$75○ estimate1 to 3 years
🇫🇮 Finland1$42$78○ estimate1 to 3 years
🇦🇪 United Arab Emirates1$50$85○ estimate1 to 3 years
🇺🇸 ERCOT West2$42$80○ estimate1 to 2 years
🇺🇸 SPP2$42$68◐ modelled2 to 7 years
🇸🇦 Saudi Arabia2$50$58○ estimate1 to 3 years
🇺🇸 ERCOT Central2$55$95○ estimate1 to 2 years
🇨🇦 Ontario2$55$100○ estimate3 to 5 years
🇨🇦 Quebec2$55$115○ estimate4 to 6 years

Build sorts by tier, Cost by the low end of the band, Wait by the year band. Bands and year bands are free; precise midpoints and waits in months are the Analyst Desk. All markets on the map →

One market. The complete power picture.

An example, not a recommendation. Four of 79 rated markets plus 5 regional overviews. Pick any. Live conditions show what the grid is doing now. The market report explains what it means for cost, access and risk. Both sit on one market ID and are never merged.

OntarioStructural baseline, June 2026Read the full report →Live conditions →
$55 to $100/MWh
Built: Triangulated
Delivered recurring cost for the declared case: 100 MW, 95% load factor, HV service. Connection capital excluded. Not the wholesale price.
Ranked across 32 markets →
3 to 5 years
High friction, estimate
Worst first across 54 →
Tier 2 Strong, score 60
Outlook Negative, confidence High
All rated markets →
15,655 MW
Structural baseline, June 2026
System demand.
65 g/kWh
Structural baseline, June 2026
Derived from the fuel mix, never measured.
90%
Structural baseline, June 2026
The low-carbon share: wind, solar, hydro, geothermal, biofuel and nuclear. Biofuel is counted as low-carbon, not zero-emission.
34%
Structural baseline, June 2026
Excludes nuclear. The read for a renewables-only procurement mandate.
$18/MWh
Structural baseline, June 2026
Energy only, and always modelled: no live price feed exists in any market. Not the delivered cost.
Opportunity: the four lenses
Build score 30/100
Offtake grade C (index 46/100)
Demand hunger 42
Load pressure: Rising
Next review 2027-11-15
Grid strength: Watch (44/100)
Cost triangulated · Regulation mixed, worsening

Each lens weights the same evidence for a different decision, so a lens score can differ from the overall rating.

Pickering B comes out of service for refurbishment; site construction starts, reactor work awaits a CNSC decision expected January 2027
Availability · Sep 2026 · materiality high
What did not change: the tier, the score and the five pillar values. The rating moves only when the evidence does.
Every logged change →

Each field here is labelled by its own freshness. Sources, dates and methods for every field are on the full report →

Price, imports and exports have no live feed in any market and are always modelled. Carbon intensity is derived from the fuel mix, never measured. The bands shown are each priced for one declared case, so scale and phasing change the answer.

What is changing the power map

New capacity, connection rules, tariffs and reliability events, each dated, cited and translated into what it means for a large load. An announcement is not delivery: each entry says what it changes and when. A rating moves only when a rating action is logged.

OntarioOct 2026
IESO contracts a firm capacity import for this winter and raises its capacity auction targets
IESO notice of 1 Oct 2026. Citing facility maintenance requested from this winter through 2027 and 2028, the IESO secured a firm import for this winter from Alpha Generation, a…
Availability · materiality med
What it means for a large load: Short-term cover only.
OntarioSep 2026
Pickering B comes out of service for refurbishment; site construction starts, reactor work awaits a CNSC decision expected January 2027
The Ontario Ministry of Energy and Mines said on 21 Sep 2026 that site construction on the Pickering refurbishment had begun and that Units 5 to 8 (Pickering B) would be removed…
Availability · materiality high
What it means for a large load: Supply leaves now and returns late.
Newfoundland & LabradorSep 2026
Newfoundland and Labrador House of Assembly backs the Churchill Falls and Gull Island resolution; the agreement stays non-binding
On 17 Sep 2026, after four days of debate, the House of Assembly voted in favour of a resolution on the Definitive Cooperation and Implementation Agreement for Churchill Falls and…
Availability · materiality med
What it means for a large load: Nothing changes for a buyer.
NYISO (New York)Sep 2026
The New York framework that is meant to end the moratorium has not been published
Executive Order 62 of 14 Jul 2026 directed Empire State Development to create and post a Community Investment Framework, with a deadline of 12 Sep 2026. As of 15 Sep 2026 the ESD…
Access · materiality med
What it means for a large load: No change for a large load.

Every logged change and rating action →