Clean (hydro-led) and stable, but mid-scale and mid-cost; workable rather than a magnet.
See live grid data →Workable access.
Moderate availability (hydro-led).
Mid-range cost.
Limited momentum.
Clean (~90 g), hydro.
Modelled read: hydro-rich, well interconnected and reliable.
modelled
Average customer interruption (SAIDI) of 37.72 minutes per year in 2022, excluding major event days as filed.
measured · E-Control (via CEER)
We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.
Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.
The average customer loses about 37.72 minutes of power per year (2022). This is the standard regulator outage measure (SAIDI); lower means a more reliable grid.
Averaged across several territories. No single customer experiences this figure. The per-territory table in the reliability overlay above gives each operator’s own filed record, which is what a site-specific read needs.
Source: E-Control (via CEER)
What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.
Every field above carries its own source and freshness. Price, imports and exports are modelled in every market because no feed supplies them. Carbon intensity is derived from the fuel mix.
Dispute this rating. If you have evidence we’ve missed or misread, email hello@powergridiq.com. We log every dispute and reply within 10 business days.
| Pillar | Evidence grade | What that means |
|---|---|---|
| Cost | Not assessed | We hold no evidence for this yet |
| Connection | Not assessed | We hold no evidence for this yet |
| Reliability | Market-level (M2) | Good for comparing markets, not for a site |
| Carbon | Market-level (M2) | Good for comparing markets, not for a site |
| Regulatory | Not assessed | We hold no evidence for this yet |
| Local capacity | Not assessed | We hold no substation-level evidence |
High
All 1 data layers are directly measured
Partial
1 of 3 dimensions: reliability, connection, cost
June 2026
per-layer vintages below
| Layer | Method | Vintage | Freshness | Source |
|---|---|---|---|---|
| PGIQ Rating opinion | opinion | June 2026 | Current | PGIQ methodology |
| Reliability | measured | 2022 | Aging | E-Control (via CEER) |
Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.
Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.
The same list as JSON: /api/v1/markets/austria/gaps
How Austria's reliability-adjusted score and tier have moved, month by month. Part of your Analyst Desk.
Done with Austria? Browse every market or see conditions across every region.
This page is our full read on Austria alone, and it is free. To decide where a large load should actually go, you need every market side by side, ranked on recurring cost and time-to-connect, with the history and alerts when your shortlist moves. That is the Analyst Desk.
With your Analyst Desk, compare Austria against every market side by side, ranked on recurring cost and time-to-connect, with the full history and shortlist alerts.