Print view: light theme, the brief without folded evidence (the evidence pack prints it all). Use your browser's print to save a PDF.
PGIQ Rating · ratings as of June 2026 · data refreshed 24 Nov 2026
2

🇩🇪 Germany

Rated by region (Tier 2-4)
Tier 2 Strong · Rated by region: Tier 2-4 (open a region below for its rating) · Outlook Stable · High confidence · how we score
Tier
Tier 2-4
Rated by region
Delivered cost
Not published
Rated by region
Connection wait
By region
Open a regional rating below
Reliability and outlook
By region
Outlook Stable · High confidence

Frankfurt is the continent's number-one hub (high momentum), but the national rating is dragged by a constrained, north/south-split grid and high cost. The honest read differs by region: the wind-rich north is materially more attractive than the congested south.

See live grid data →
Regional overview. Germany is rated by region: use the regional ratings below for siting. Rated regions: Germany North (Hamburg) · Germany South (Frankfurt/Munich).
Your load. We don't publish a cost band for this market, so there is nothing to recompute for your load.

The five pillars behind the tier

Access30%45

Constrained access: a north/south transmission bottleneck and delayed HVDC corridors; connection is workable but planning-heavy.

Show evidence
Availability25%58

Moderate availability, tightening with the coal and nuclear exit.

Cost25%51

High cost: among Europe's more expensive wholesale markets.

Momentum15%80

High momentum: Frankfurt (~750 MW) anchors the FLAP-D cluster.

Carbon5%46

Moderate carbon (~380 g annual), still coal-influenced despite high renewables.

Default weights, which lean toward cost and access rather than carbon: Access 30 · Availability 25 · Cost 25 · Momentum 15 · Carbon 5. Momentum reflects the data-centre build already underway, not just stated intentions.

Download the evidence pack (print-ready, free) →

Reliability overlay

National reliability adjustment: the five-pillar score of 59 is reduced to 55, a deduction of 4 points. A national overview carries the average of its rated regions’ reliability adjustments (Germany North (Hamburg) 0, Germany South (Frankfurt/Munich) 7), because a national view has to represent all of them, not only the strongest. The region pages carry the actionable ratings and their own adjustments. Reliability is reported as five separate layers, never as one combined label, because they answer different questions and a strong answer on one does not cover a gap in another: what has actually failed on the bulk system, what a forward assessment expects of firm supply, how the local network performs, what your contract actually promises, and what your site is designed to ride through. Any one of them can cap the tier.
Show evidence

Historical bulk-system performance: No reliability flags found

Bulk-system security of supply held through the 2023 nuclear exit, with no national supply interruption or load shedding reported over the transition.

measured · German supply highly reliable through nuclear exit (Clean Energy Wire)

Historical utility-territory delivery performance: No reliability flags found

Local delivery performance is strong on the operator's own measure: average customer interruption (SAIDI) was 12.8 minutes in 2023, in line with the ten-year average.

measured · Bundesnetzagentur SAIDI

Forward resource adequacy (assessed): Adequacy flagged

Germany is a tale of two regions. The wind-rich north runs a surplus and is favourable for a large load; the industrial south (Bavaria, Baden-Wurttemberg) lost most of its nuclear in 2023 and depends on northern power over a bottlenecked grid. The north-south fix, SuedLink (about 4 GW HVDC), is delayed to roughly 2028, leaving costly redispatch in the interim. A southern siting faces materially higher transmission and adequacy risk than a northern one; on its own the south would rate closer to Elevated.

What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.

assessed · Germany starts SuedLink north-south line (Clean Energy Wire)

Contractual service terms: not assessed

We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.

Ask the utility for the tariff or service agreement terms before relying on firm supply.

Designed site resilience: not applicable at market level

Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.

Confidence: High. Each input is labelled as measured, modelled, or drawn from a specific event, and is framed as a risk to a prospective large new load, not as a verdict on any utility or grid operator. Forward adequacy is an assessment of what is expected, not a measurement of what has happened; it is a forecast and is labelled as one.

Download the evidence pack (print-ready, free) →

Grid conditions now

Structural baseline, June 2026Open the live map for Germany →
Average demand
56,000 MW
Structural baseline, June 2026
Average system demand across the market, not the peak.
Wholesale price (modelled)
$80/MWh
Structural baseline, June 2026
US dollars. Energy only, and always modelled: no live price feed exists in any market. This is not the delivered cost.
Carbon intensity
350 g/kWh
Structural baseline, June 2026
Derived from the fuel mix. Never directly measured.
Renewable and nuclear
55%
Structural baseline, June 2026
The low-carbon share: generation from wind, solar, hydro, geothermal, biofuel and nuclear. Biofuel is counted as low-carbon, not zero-emission. The read for a carbon target.
Show all 10 fields
Renewable only
55%
Structural baseline, June 2026
Wind, solar, hydro, geothermal and biofuel. Excludes nuclear, which is low-carbon but not renewable, so this is the read for an RE100-style renewable procurement mandate.
Installed capacity
130,000 MW
Structural baseline, June 2026
Firm capacity
not held
Structural baseline, June 2026
De-rated, system-level.
System firm margin
not held
Structural baseline, June 2026
Market-wide estimate of de-rated firm capacity less peak demand. This is a directional screen, not local connectable capacity at any point of delivery.
Imports
8,000 MW
Structural baseline, June 2026
Modelled. No live interchange feed exists.
Exports
6,000 MW
Structural baseline, June 2026
Modelled. No live interchange feed exists.

Every field above carries its own source and freshness. Price, imports and exports are modelled in every market because no feed supplies them. Carbon intensity is derived from the fuel mix.

Outlook drivers

Show evidence

↑ Upgrade triggers

  • HVDC corridors complete and relieve the north-south bottleneck.
  • Siting in the wind-rich north ahead of the build-out.

↓ Downgrade triggers

  • Grid congestion and cost worsen for new large load.
  • Coal-exit tightens availability faster than renewables fill in.

Download the evidence pack (print-ready, free) →

Key risks

Peer comparison

Trades like
Netherlands (major hub, grid-constrained)
Ahead
on momentum
Behind
Nordics on cost and openness

Dispute this rating. If you have evidence we’ve missed or misread, email hello@powergridiq.com. We log every dispute and reply within 10 business days.

🔔 Get alerts for Germany
Get an email when this market's rating, outlook or a material development changes. Market alerts are part of the Analyst Desk.

Rating history

Show evidence
Jul 2026
AffirmedNational score moves 57 to 53 as the overview now carries the average of its regions' reliability adjustments (North 0, South 7) instead of an unapplied national reliability adjustment. Tier 3 affirmed; the region ratings are unchanged and remain the actionable ones.
Trigger: Overview reliability-adjustment consistency (methodology note, Jul 2026)
June 2026
New ratingNew rating: Tier 3 Workable assigned (north/south split noted).
🔒 The full time series behind Germany, how its score, recurring cost, and interconnection queue (the line to connect to the grid) have moved month by month, is part of the Analyst Desk. The rating actions above are always free.
Every rating action is dated and explained, and the log is only ever added to, never edited. Reviews happen on a regular schedule and whenever a significant event occurs. "Affirmed" means we reviewed a development and the tier held; "Under review" means a significant item is being assessed and the rating could change.

Download the evidence pack (print-ready, free) →

Data provenance and freshness

Show evidence
How solid the data behind this rating is, on two separate axes plus recency. Source strength is how measured the numbers are, as opposed to triangulated or modelled. Coverage is how many of the decision-relevant data dimensions (reliability, connection, and cost) are compiled for this market. The two are kept apart because they answer different questions: a market can have strong sources on the little that is covered, or broad coverage that still leans on models. Neither grades the rating itself. The rating is a cited opinion, graded separately and falsifiably by the public track record and baseline measurement plan.

Source strength

High

All 1 data layers are directly measured

Coverage

Partial

1 of 3 dimensions: reliability, connection, cost

Last reviewed

June 2026

per-layer vintages below

LayerMethodVintageFreshnessSource
PGIQ Rating opinionopinionJune 2026CurrentPGIQ methodology
Reliability reviewmeasured2025FreshGerman supply highly reliable through nuclear exit (Clean Energy Wire)

Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.

Download the evidence pack (print-ready, free) →

Score history

How Germany's reliability-adjusted score and tier have moved, month by month. Part of your Analyst Desk.

Immutable monthly snapshots of the reliability-adjusted score, tier, outlook and recurring cost, oldest first. Dated when taken and never back-filled, so the series only compounds forward. Part of the Analyst Desk →

What next for Germany?

Add to shortlistTrack it alongside your other candidates.Compare with peersRank markets against each other on your own weights.Open the Analyst DeskEvery market side by side, with history and alerts.Retrieve it through the APIThe same read as JSON, with provenance on every field.

Done with Germany? Browse every market or see conditions across every region.

How does Germany compare to every other market?

This page is our full read on Germany alone, and it is free. To decide where a large load should actually go, you need every market side by side, ranked on recurring cost and time-to-connect, with the history and alerts when your shortlist moves. That is the Analyst Desk.

With your Analyst Desk, compare Germany against every market side by side, ranked on recurring cost and time-to-connect, with the full history and shortlist alerts.

+ Add to your shortlist Recurring cost, ranked Connection friction, ranked Get the Analyst Desk →