Grid Today. What every grid is doing now.
Live grid conditions by region: demand, fuel mix and derived carbon intensity, each field labelled by freshness. Wholesale price is modelled; no live price feed exists · tap any region, scroll to zoom
Colour by lens
Live grid
🔎 Screen markets▾
Utilization
<60% load
60–85%
>85%
Data Confidence
● Live: a white pip marks a market with a live system-operator or EIA feed
◑ Recent: updated several times a week
◐ Modelled: no live feed, so no pip on the map
Weather layers: Open-Meteo.
Weather
⚡ Largest system capacity marginDe-rated capacity minus peak demand, market-wide. A system-conditions snapshot, not a read on whether a site can connect: that depends on the local substation and the connection queue.
🏢
Data Centres & AIPGIQ Ratings: compare markets for a large load →
🏭
Industrial & CommercialPrice volatility & grid stress →
🌎
Energy InvestorsCurtailment and price spreads →
🔋
Battery & StorageDaily price spread (a guide to storage arbitrage potential; modelled prices) →
🌡 Grid Conditions Today · what the weather is doing to demand right now, region by region
Live temperature versus an 18°C comfort baseline tells you which grids are under cooling or heating stress today, and therefore where prices, peaks and curtailment risk are elevated right now. A grid running hot is competing harder for every megawatt, exactly when a new large load would feel it.
● CDD/HDD from Open-Meteo current temp (18°C baseline). Demand classification derived. Peak-season context from historical patterns.
⚡ All Regions · Load, Carbon & Modelled Price
Region$/MWh24h High24h LowTrendCarbonTop FuelLoadWeather
● US: EIA live  ·  ● Ontario: IESO live  ·  ● Europe: ENTSO-E live  ·  ◑ South Africa: Eskom recent  ·  ◐ Other regions: model estimates  ·  Methodology
⏳ Time to Connect · the real gate for a new large load, longest waits first
◐ Connection-time read curated from grid-operator and reform reporting (PJM, NESO, AEMO and others). Interconnection-queue position, not generation supply, is usually what decides whether a project can energize. Markets without a defensible read are not shown.
🌀 Cheap-Power Windows · where a flexible load buys surplus low, cheapest hours first
◐ Cheapest-hour price is modelled from each grid's daily price cycle and current price; renewable share and installed battery fleet are real where tracked. A load that shifts into the cheap hours, or a co-located battery, captures this surplus. Not a metered curtailment figure.
🔌 Most Stretched at Peak · peak demand vs firm capacity; a fuller bar is more stretched
🏗 System-level room · Top regions for new data centres, AI clusters & industrial load
◐ System firm margin = de-rated (firm) capacity − peak demand, market-wide. Not local capacity at a specific substation. Directional screen for siting new load, not a connection guarantee; local interconnection-queue capacity is the binding constraint.
⚡ Ramp Coverage · dispatchable flexibility vs the variable renewables it must balance
◐ Grids ranked by variable-renewable share. Buffer = fast-dispatchable plant (gas, oil, hydro, storage, biofuel) as a cushion for wind+solar variability. Share of installed capacity.
🔋 Storage Arbitrage · daily price spread a battery can capture
🌿 Cleanest Grids · renewables + nuclear share, by region
◐ Calculated from regional fuel mix across all tracked grids.
💵 Cost of Generation · lifetime-average cost (LCOE) by technology, $/MWh · pick your region for local costs, the global range is only context
◐ Unsubsidized levelized cost of energy (LCOE), from Lazard LCOE+ and IRENA, with nuclear variants from the IEA/NEA Projected Costs study and NEI. LCOE already spreads each plant's upfront cost across its full operating life, so it is the lifetime-average cost per MWh. For nuclear that life is long and running costs are low, so an existing or life-extended plant is about $30 to $45/MWh, among the cheapest power here. New nuclear's cost is set by capex, build time and above all the cost of capital: at a low, regulated discount rate (China, Korea) it is roughly $55 to $105/MWh, while a Western merchant-financed first-of-a-kind with overruns runs $142 to $222/MWh. Renewables' low LCOE excludes the cost of firming intermittency (storage, backup, transmission). Local costs vary; this is the global picture.
Your Region:
Compare Regions vs vs
-
-
Grid Overview
Fuel Mix
Zone Balance
⚡ Interconnection Flows
- grids
NA 60 Hz
EU 50 Hz
Load -
Cap -
Upd -
PowerGridIQ, Monitoring - grids worldwide
Terms & Disclaimer
Load
Utilization
Price
Top Fuel
Weather
Tap to explore →
This is the free live snapshot

Any region's full rating is free too, cost band and connection wait included. All markets compiled side by side, with history and shortlist alerts, is the Analyst Desk.

Get the Desk → Sign in