Very clean (hydro and nuclear) but expensive and small; limited room for hyperscale.
See live grid data →Limited access on a small system.
Moderate availability (hydro plus nuclear).
Higher cost; import-reliant in winter.
Limited momentum.
Very clean (~30-45 g).
Modelled read: hydro and nuclear, very reliable, with some winter import reliance.
modelled
Average customer interruption (SAIDI) of 8 minutes per year in 2023, excluding major event days as filed.
measured · Swiss Electricity Commission (ElCom)
We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.
Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.
What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.
The average customer loses about 8.0 minutes of power per year (2023). This is the standard regulator outage measure (SAIDI); lower means a more reliable grid.
High
1 of 1 data layers measured
Partial
1 of 3 dimensions: reliability, connection, cost
June 2026
per-layer vintages below
| Layer | Method | Vintage | Freshness | Source |
|---|---|---|---|---|
| PGIQ Rating opinion | opinion | June 2026 | Current | PGIQ methodology |
| Reliability | measured | 2023 | Fresh | Swiss Electricity Commission (ElCom) |
Freshness reflects each layer's refresh cadence: reliability annual to three-yearly, capacity-auction and queue yearly, tariffs every year or two. The full cross-market freshness dashboard is at /data-quality.
Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
Who runs the connection process: not yet compiled for this market. This is wayfinding rather than evidence, and its absence is a gap in our compilation, not a fact about the market.
How Switzerland's reliability-adjusted score and tier have moved, month by month. Part of your Analyst Desk.
This page is our full read on Switzerland alone, and it is free. To decide where a large load should actually go, you need every market side by side, ranked on recurring cost and time-to-connect, with the history and alerts when your shortlist moves. That is the Analyst Desk.
With your Analyst Desk, compare Switzerland against every market side by side, ranked on recurring cost and time-to-connect, with the full history and shortlist alerts.