The cheapest power on the board and an open, clean grid. The limit is size: a small system can only absorb so much 100 MW-plus load, and large-load demand here is still early.
See live grid data →Open access: Manitoba Hydro welcomes large load.
Good margin on paper, but a small absolute system.
The cheapest power of any market here.
Nascent momentum.
Near-zero operational carbon (~4 g), hydro.
Manitoba Hydro is about 97% hydro, cheap and clean, but that deep hydro dependence carries a drought-year adequacy exposure similar to British Columbia.
What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.
modelled
We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.
Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.
What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.
about 4 to 5 cents CAD per kWh (about $0.035 per kWh)
regulated, Manitoba Hydro large-industrial rate, 2026
Low regulated hydro rate, slow-moving; set by the Public Utilities Board.
Manitoba has no competitive wholesale market; a large load buys Manitoba Hydro's regulated industrial rate, roughly 4 to 5 Canadian cents per kWh (about 3.5 US cents), among the lowest anywhere. The regulated tariff, not a spot price, is what a data center pays.
Basis: measured. Source: Manitoba Hydro electricity rates.
Moderate
1 of 2 data layers measured
Partial
1 of 3 dimensions: reliability, connection, cost
June 2026
per-layer vintages below
| Layer | Method | Vintage | Freshness | Source |
|---|---|---|---|---|
| PGIQ Rating opinion | opinion | June 2026 | Current | PGIQ methodology |
| Reliability review | modelled | 2025 | Fresh | on the market page |
| Large-user tariff | administered | 2026 | Fresh | Manitoba Hydro electricity rates |
Freshness reflects each layer's refresh cadence: reliability annual to three-yearly, capacity-auction and queue yearly, tariffs every year or two. The full cross-market freshness dashboard is at /data-quality.
Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
Who runs the connection process: not yet compiled for this market. This is wayfinding rather than evidence, and its absence is a gap in our compilation, not a fact about the market.
How Manitoba's reliability-adjusted score and tier have moved, month by month. Part of your Analyst Desk.
This page is our full read on Manitoba alone, and it is free. To decide where a large load should actually go, you need every market side by side, ranked on recurring cost and time-to-connect, with the history and alerts when your shortlist moves. That is the Analyst Desk.
With your Analyst Desk, compare Manitoba against every market side by side, ranked on recurring cost and time-to-connect, with the full history and shortlist alerts.