Ratings Release · July 2026

Q3 2026 PGIQ Ratings: methodology v2 lands, ERCOT capped at Tier 2

The first quarterly release on PGIQ methodology v2: five pillars plus a reliability overlay and an interconnection-queue layer, across 84 rated market and regional views.

Q2 2026 was the methodology v2 quarter. Every market was re-baselined on the five pillars (Access, Availability, Cost, Momentum, Carbon), and a new reliability overlay now captures what a large load actually lives with: delivery reliability and forward firm-capacity risk, assessed separately from generation adequacy. The overlay produced the quarter's headline action. ERCOT keeps the strongest fundamentals in the US (78) and the fastest large-load energization path, but a NERC elevated-risk forward outlook plus the Winter Storm Uri record cap it at Tier 2. Three markets entered Under review as US federal and state policy moved against large loads.

Rating changes this quarter

Affirmed on events

Quebec (proposed data-centre tariff is managed pricing inside the cheapest system in the set), Alberta (AESO interim tranche fully allocated), Great Britain (Gate 2 connection offers issuing on schedule), Australia (5.4 GW data-centre queue disclosed), and Pacific Northwest (Seattle moratorium is localised, consistent with the existing negative outlook).

Where the tiers stand

Tier 1 (Prime): Sweden North (Lulea, SE1/SE2) 78, United Arab Emirates 76, Norway 75. Quebec is both the cheapest power and the cleanest grid in the set. Full ratings, methodology and history: the ratings index, methodology and track record.