🇦🇹 Austria

Viable, with conditions, holding steady
Tier 3 Workable · PGIQ Rating score 58/100, #23 of 79 markets · Outlook Stable · Med confidence · how we score
Tier
3Workable
#23 of 79 markets
Delivered cost
Not published
No band compiled for this market yet
Connection wait
Not yet estimated
No connection timing held
Reliability and outlook
No adjustment
Outlook → Stable · Med confidence

Clean (hydro-led) and stable, but mid-scale and mid-cost; workable rather than a magnet.

See live grid data →
One market,
four reads
Build58/100Build scoreSellGrade B (index 60/100)Offtake grade (index)PlanLightLoad pressureMonitorNot coveredSiting screen only
The same market, four decisions. Open any lens to see this market ranked against the rest.
The same market, read four ways

Austria is a moderate market to sell power into

Grade B (Moderate)
Offtake score 60/100
Demand 33, build feasibility 58, combined into the score. For a seller: where buyers already pay, how tight supply is, and how feasible new build is here.
See it on the Offtake grade →

Austria: some room at system level, light demand pressure

Some room 68/100
System-level room, not local capacity
Local capacity: not assessed. We have found no operator publication of area or substation capacity for this market, so whether the bus serving a candidate site can take the load is an open question. Absence of a finding here is not evidence that capacity exists.
Two reads for a grid planner: how much room the system as a whole looks to have (Some room), and how hard demand is already pushing (Light). The first is a market-level estimate from connection ease, forward adequacy and reliability margin. It is not local deliverability. Capacity at a specific substation is not assessed for this market, and a market can look roomy while the bus you want has nothing available. Confirm local capacity with the utility before relying on it.
Demand growth
Slow load growth in our read, the pull on your system.
Load Pipeline Reality → Where demand is hungry → Connection friction →

Austria is not yet covered for a held exposure

SITING SCREEN ONLY
Austria is not yet monitored. Full monitoring needs reviewed reliability, connection-queue data and a compiled cost band; this market has only a subset, so we show it as a siting screen. We deepen coverage market by market.
See the markets we cover →
Your load. We don't publish a cost band for this market, so there is nothing to recompute for your load.
Connection-wait indicator, not a wait time
Strength BCapacity scarcity
APG lists 0 MW of available offtake capacity at all 83 of its substations, against 30,643 MW of offtake connection applications. APG states that no free, unrestricted connection capacity is available on its grid.
Source: APG, Netzanschlusskapazitäten, published 1 Oct 2026 (table date).
No published source gives a connection wait for a large new load here. Ask the grid operator for its large-load study timeline. How indicators are graded →

The five pillars behind the tier

A
A
C
M
C
The pillar signature: Access, Availability, Cost, Momentum, Carbon, taller is stronger. The same shape repeats across every market so peers compare at a glance.
Access30%58

Workable access.

Show evidence
Availability25%58

Moderate availability (hydro-led).

Cost25%64

Mid-range cost.

Momentum15%35

Limited momentum.

Carbon5%88

Clean (~90 g), hydro.

Default weights, which lean toward cost and access rather than carbon: Access 30 · Availability 25 · Cost 25 · Momentum 15 · Carbon 5. Momentum reflects the data-centre build already underway, not just stated intentions.

Download the evidence pack (print-ready, free) →

Seller view: Read these the other way: momentum is your customer pipeline, cost is your revenue ceiling, and access is how hard it is to build and sell here, not only to connect.

Reliability overlay

Reliability reviewed: no material concerns were found, so the rating is unchanged. Reliability is reported as five separate layers, never as one combined label, because they answer different questions and a strong answer on one does not cover a gap in another: what has actually failed on the bulk system, what a forward assessment expects of firm supply, how the local network performs, what your contract actually promises, and what your site is designed to ride through. Any one of them can cap the tier.
Show evidence

Historical bulk-system performance: No reliability flags found

Modelled read: hydro-rich, well interconnected and reliable.

modelled

Historical utility-territory delivery performance: No reliability flags found

Average customer interruption (SAIDI) of 37.72 minutes per year in 2022, excluding major event days as filed.

measured · E-Control (via CEER)

A blend, not your supplier. This figure covers several distribution operators, so it describes an average customer rather than the operator that would serve your site. It is good for comparing markets and watching them move, it tops out at Comparable (M2), and it cannot carry a Project Case. E-Control national average across Austrian DSOs. It is a territory-wide history and is silent on: performance at a specific substation or feeder; transmission-level service, which is a different product from distribution service; the industrial or large-load customer class specifically; N-1 or other redundancy architecture at the supplying substation; contractual curtailment (being told to cut output or consumption) rights the utility may hold over the load; power quality and momentary interruptions, which this metric excludes by construction; on-site UPS, storage or generation; forward adequacy: it is a record of what happened, not a forecast.

Forward resource adequacy (assessed): No adequacy flags

Contractual service terms: not assessed

We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.

Ask the utility for the tariff or service agreement terms before relying on firm supply.

Designed site resilience: not applicable at market level

Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.

Confidence: Low. Each input is labelled as measured, modelled, or drawn from a specific event, and is framed as a risk to a prospective large new load, not as a verdict on any utility or grid operator. Forward adequacy is an assessment of what is expected, not a measurement of what has happened; it is a forecast and is labelled as one.

Download the evidence pack (print-ready, free) →

Seller view: Tight forward capacity (firm supply promised for future years) is scarcity that firm generation and storage get paid for; an adequacy flag is a demand signal for new supply, not only a risk to a load.

Reliability metrics

Show evidence

Delivery reliability (measured)

The average customer loses about 37.72 minutes of power per year (2022). This is the standard regulator outage measure (SAIDI); lower means a more reliable grid.

Averaged across several territories. No single customer experiences this figure. The per-territory table in the reliability overlay above gives each operator’s own filed record, which is what a site-specific read needs.

Source: E-Control (via CEER)

Hard, cited measures behind the reliability overlay above: the regulator outage series (SAIDI, measured, published with a lag) and the forward resource-adequacy assessment (a measured forecast). Framed as risk to a prospective large new load, not a verdict on any utility.

Download the evidence pack (print-ready, free) →

Supply relief outlook

Show evidence
Will the power crunch ease before your load energizes? This nets the demand racing for capacity against the new supply likely to arrive and the old supply leaving. A cross-side read, using the same data a seller sees the other way.
Balanced
Demand pressure
Slow load growth competing for the same capacity.

What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.

Download the evidence pack (print-ready, free) →

Grid conditions now

Structural baseline, June 2026Open the live map for Austria →
Average demand
6,500 MW
Structural baseline, June 2026
Average system demand across the market, not the peak.
Wholesale price (modelled)
$62/MWh
Structural baseline, June 2026
US dollars. Energy only, and always modelled: no live price feed exists in any market. This is not the delivered cost.
Carbon intensity
85 g/kWh
Structural baseline, June 2026
Derived from the fuel mix. Never directly measured.
Renewable and nuclear
87%
Structural baseline, June 2026
The low-carbon share: generation from wind, solar, hydro, geothermal, biofuel and nuclear. Biofuel is counted as low-carbon, not zero-emission. The read for a carbon target.
Show all 10 fields
Renewable only
87%
Structural baseline, June 2026
Wind, solar, hydro, geothermal and biofuel. Excludes nuclear, which is low-carbon but not renewable, so this is the read for an RE100-style renewable procurement mandate.
Installed capacity
15,000 MW
Structural baseline, June 2026
Firm capacity
not held
Structural baseline, June 2026
De-rated, system-level.
System firm margin
not held
Structural baseline, June 2026
Market-wide estimate of de-rated firm capacity less peak demand. This is a directional screen, not local connectable capacity at any point of delivery.
Imports
3,000 MW
Structural baseline, June 2026
Modelled. No live interchange feed exists.
Exports
2,000 MW
Structural baseline, June 2026
Modelled. No live interchange feed exists.

Every field above carries its own source and freshness. Price, imports and exports are modelled in every market because no feed supplies them. Carbon intensity is derived from the fuel mix.

Outlook drivers

Show evidence

↑ Upgrade triggers

  • Hydro-backed clean supply attracts firm tenants.
  • Regional interconnection helps.

↓ Downgrade triggers

  • Mid cost and scale.
  • Limited ecosystem.

Download the evidence pack (print-ready, free) →

Key risks

Peer comparison

Trades like
Switzerland (clean, small, mid-cost)
Ahead
on carbon
Behind
on scale

Dispute this rating. If you have evidence we’ve missed or misread, email hello@powergridiq.com. We log every dispute and reply within 10 business days.

🔔 Get alerts for Austria
Get an email when this market's rating, outlook or a material development changes. Market alerts are part of the Analyst Desk.

Rating history

Show evidence
June 2026
New ratingNew rating: Tier 3 Workable assigned.
🔒 The full time series behind Austria, how its score, recurring cost, and interconnection queue (the line to connect to the grid) have moved month by month, is part of the Analyst Desk. The rating actions above are always free.
Every rating action is dated and explained, and the log is only ever added to, never edited. Reviews happen on a regular schedule and whenever a significant event occurs. "Affirmed" means we reviewed a development and the tier held; "Under review" means a significant item is being assessed and the rating could change.

Download the evidence pack (print-ready, free) →

Data provenance and freshness

Show evidence
What we hold for this market, field by field. Each grade is set by the evidence we actually hold for that pillar. A low grade means we looked and the evidence is thin; it is not a verdict on the market.
PillarEvidence gradeWhat that means
CostNot assessedWe hold no evidence for this yet
ConnectionNot assessedWe hold no evidence for this yet
ReliabilityMarket-level (M2)Good for comparing markets, not for a site
CarbonMarket-level (M2)Good for comparing markets, not for a site
RegulatoryNot assessedWe hold no evidence for this yet
Local capacityNot assessedWe hold no substation-level evidence
Not yet good enough for any decision use. The weakest fields are cost and connection.
Depth is not a rating strength, a confidence score or a feasibility conclusion. See the full coverage matrix. Version details: evidence-grade definitions v1.0.
How solid the data behind this rating is, on two separate axes plus recency. Source strength is how measured the numbers are, as opposed to triangulated or modelled. Coverage is how many of the decision-relevant data dimensions (reliability, connection, and cost) are compiled for this market. The two are kept apart because they answer different questions: a market can have strong sources on the little that is covered, or broad coverage that still leans on models. Neither grades the rating itself. The rating is a cited opinion, graded separately and falsifiably by the public track record and baseline measurement plan.

Source strength

High

All 1 data layers are directly measured

Coverage

Partial

1 of 3 dimensions: reliability, connection, cost

Last reviewed

June 2026

per-layer vintages below

LayerMethodVintageFreshnessSource
PGIQ Rating opinionopinionJune 2026CurrentPGIQ methodology
Reliabilitymeasured2022AgingE-Control (via CEER)

Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.

Download the evidence pack (print-ready, free) →

What this market can and cannot answer yet

Show evidence
No market-level read closes a project case on its own, and saying only that would waste the evidence we do hold. Below is what is established, what is open, and what to do next.

What is established

  • Historical utility-territory delivery performance 37.72 minutes per year (2022)
  • Historical bulk-system performance (modelled)

What is open

  • Forward resource adequacy (assessed)
  • Contractual service terms (would change the answer)
  • Designed site resilience
  • Cost evidence (would change the answer)
  • Connection evidence (would change the answer)
  • Regulatory evidence
  • Substation-level capacity evidence

How service and connection are organized

Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.

Credible ranges today

  • No cost or schedule range is compiled for this market.

What could disqualify this market

  • Scale and ecosystem.
  • Cost.

Download the evidence pack (print-ready, free) →

Questions to put to the utility

Show evidence
These come from the gaps in our record for Austria: the decision points we have not assessed. Put each one to the utility, network operator or regulator before relying on this market for a project. A gap is not evidence that the risk is absent; it means we have not assessed it.
  1. What would a 100 MW load at a 95% load factor, on high-voltage service, pay per MWh all in, under the tariff it would actually be served on? Needed for a project case
    Why it is open: no compiled cost band for this market yet.
  2. How long is it from a complete application being accepted to full firm energization of the MW we need, and which milestones (initial, phased, temporary or conditional energization) would come first? Needed for a project case
    Why it is open: no countable queue or operator-published process for this market.
  3. Are the connection rules for large loads changing? What has been proposed or decided, and when does it take effect?
    Why it is open: no dated regulatory read compiled for this market yet.
  4. What firm capacity is available at the substation we would connect to, and when? Needed for a project case
    Why it is open: no operator publication of area or substation capacity found for this market.

The same list as JSON: /api/v1/markets/austria/gaps

Download the evidence pack (print-ready, free) →

Score history

How Austria's reliability-adjusted score and tier have moved, month by month. Part of your Analyst Desk.

Immutable monthly snapshots of the reliability-adjusted score, tier, outlook and recurring cost, oldest first. Dated when taken and never back-filled, so the series only compounds forward. Part of the Analyst Desk →

What next for Austria?

Add to shortlistTrack it alongside your other candidates.Compare with peersRank markets against each other on your own weights.Open the Analyst DeskEvery market side by side, with history and alerts.Retrieve it through the APIThe same read as JSON, with provenance on every field.

Done with Austria? Browse every market or see conditions across every region.

How does Austria compare to every other market?

This page is our full read on Austria alone, and it is free. To decide where a large load should actually go, you need every market side by side, ranked on recurring cost and time-to-connect, with the history and alerts when your shortlist moves. That is the Analyst Desk.

With your Analyst Desk, compare Austria against every market side by side, ranked on recurring cost and time-to-connect, with the full history and shortlist alerts.

+ Add to your shortlist Recurring cost, ranked Connection friction, ranked Get the Analyst Desk →