PGIQ Rating · ratings as of June 2026 · data refreshed 24 Nov 2026
2

🇨🇦 Ontario

Strong, with known trade-offs, and access is getting harder Reliability flags found
Tier 2 Strong · PGIQ Rating score 60/100, #19 of 79 markets (fundamentals 65, less a 5-point grid-reliability adjustment) · Outlook Negative · High confidence · how we score

A cheap, clean nuclear-and-hydro base, but availability is tightening through the nuclear-refurbishment cycle and Bill 40 introduces managed, economic-benefit-prioritized connections for large data centres. Strong, but getting more selective.

See live grid data →
One market,
four reads
Build30/100Build scoreSellGrade C (index 46/100)Offtake grade (index)PlanRisingLoad pressureMonitorWatch (44/100)Grid strength
The same market, four decisions. Open any lens to see this market ranked against the rest.
The same market, read four ways

Ontario is a limited market to sell power into

Grade C (Limited)
Offtake score 46/100
Demand 42, build feasibility 30, combined into the score. For a seller: where buyers already pay, how tight supply is, and how feasible new build is here.
Price to beat
A 100 MW load on our standard case pays about $78/MWh delivered here. A competitive supply offer works against that level.
Connection
Connection difficulty High, typical wait 3-5 years.
For new supply
Ontario is procuring new firm supply and building transmission with First Nations equity partners; replacement capacity for the Pickering refurbishment is the near-term opening.
Regulatory momentum
Mixed, worsening. Bill 40 lets the Minister prioritize and approve large data-centre connections by economic benefit, so access is becoming managed and selective rather than open.
Beyond the grid
Indigenous consultation is central to new transmission and is increasingly structured as equity partnership rather than a late-stage veto risk: Ontario directed Hydro One to build the Red Lake Transmission Line under a model giving proximate First Nations a 50 percent equity stake, and signed a memorandum of understanding with five First Nations on the Barrie-to-Sudbury line.
Scheduled to change
Sep 2026: Pickering Units 5-8 came out of service for refurbishment; construction started 21 Sep 2026 (Ontario starts construction on Pickering nuclear refurbishment (Ontario Newsroom, 21 Sep 2026)).
See it on the Offtake grade →

Ontario: effectively full at system level, rising demand pressure

Effectively full 13/100
System-level room, not local capacity
Local capacity: not assessed. We have found no operator publication of area or substation capacity for this market, so whether the bus serving a candidate site can take the load is an open question. Absence of a finding here is not evidence that capacity exists.
Two reads for a grid planner: how much room the system as a whole looks to have (Effectively full), and how hard demand is already pushing (Rising). The first is a market-level estimate from connection ease, forward adequacy and reliability margin. It is not local deliverability. Capacity at a specific substation is not assessed for this market, and a market can look roomy while the bus you want has nothing available. Confirm local capacity with the utility before relying on it.
Demand growth
Moderate load growth in our read, the pull on your system.
Future firm supply
Future firm supply: tight for a large new load.
Load Pipeline Reality → Where demand is hungry → Connection friction →

Grid Risk Annex BETA

Watch
Needs structuring or mitigants · grid strength 44/100
A cited, dated grid-risk read on Ontario for a capital provider, the banks and private-credit lenders, infrastructure funds and insurers holding or underwriting a power or data-centre exposure here. Drop it into a credit memo and watch each factor over the life of the exposure.
Read it against your asset. For a load asset (Buy), weight connection access and energization timing. For a generation or offtake asset (Sell), weight offtake demand, curtailment (being told to cut output or consumption) and cost realisation. For a grid or transmission asset (Move), weight load-pipeline reality and buildout risk.
Rating and track record
PGIQ Tier 2 Strong, outlook Negative, High confidence. Scored on a public, dated, falsifiable record you can cite in a credit memo.
Delivery reliability
Reliability flags found in the bulk and local outage record we reviewed.
Future firm supply
Future firm supply: tight.
Cost certainty
Recurring cost $55 to $100/MWh for the standard 100 MW case, basis triangulated. Excludes connection capital.
Regulatory / stroke-of-pen
Mixed, worsening. Bill 40 lets the Minister prioritize and approve large data-centre connections by economic benefit, so access is becoming managed and selective rather than open.
Execution risk
Connection friction High, the risk the project or load actually energizes on time.
Ongoing monitor
Track this market's rating actions as a covenant-style monitor over the life of the exposure.
Monitoring plan
Covenant-style triggers to watch over the life of the exposure: a change in the PGIQ rating or outlook; a dated regulatory move (stroke-of-pen risk); a capacity-auction or cost-band shift; a forward firm-supply adequacy warning; and a rise in queue drop-out or connection friction. Track them on this market page, or as Analyst Desk alerts.
Sources: Ontario Bill 40, Torys · Hydro One · Global News
This is a directional grid-risk screen, not a credit rating, and not investment, engineering or procurement advice.
The formatted, cited Grid Risk Annex export is an Analyst Desk feature.See the Grid Exposure Monitor →

Realized cost band

What a large electricity user pays for power here on one declared case, 100 MW contracted demand, 95% load factor, HV service, per megawatt-hour. Not the wholesale price and not the sticker tariff: energy plus the grid, delivery and other charges that land on the bill. It is a range, because real contracts vary, and it is labelled by how it was built.

Recurring cost, delivered

$55 to $100 per MWh

Midpoint about $78 per MWh

How this band was built

triangulated

From 3 public fragments

Your load

See how the answer changes for a different load size
The band above stays the comparable figure.
Declared case only
We hold this market's cost for the declared case only (100 MW, 95% load factor, high-voltage service). We don't scale it: tariff classes, demand charges, capacity charges and connection limits change with size, so 500 MW is not five times 100 MW.
Show evidence

What builds the $78 midpoint

Illustrative allocation of the compiled midpoint. Component lines are not separately sourced and should not be interpreted as observed tariff charges.
$18
$48
Wholesale energy (HOEP)$18
Global Adjustment$48
Network & delivery$9
Other & regulatory$3
All-in delivered$78 /MWh
How the $78/MWh figure is built up, component by component, for 100 MW contracted demand, 95% load factor, HV service. The allocation is our estimate; the total is the midpoint of the compiled band (triangulated). Recurring cost only: customer-funded connection capital is a separate one-off and is not included. The energy line is Ontario's wholesale (HOEP) baseline, the same price shown on the live map. Because the Global Adjustment moves inversely to the wholesale price, a low wholesale is offset by a higher Global Adjustment, so the all-in total stays stable even as the live wholesale moves. Anchored to published figures (IESO Global Adjustment). How this is built →

Where the cost lands

$78
Low $55Midpoint $78High $100
A band, not a single price: the cheaper end is a well-structured contract on favourable terms, the higher end a less optimized one. The midpoint is our best central read.
What is in the number: Wholesale market energy near $18 per MWh, plus the Global Adjustment (Ontario's charge that recovers the cost of contracted and regulated generation, which moves inversely to the wholesale price and is usually larger than it, and is reducible for a large Class A load that curtails at system peaks), plus transmission. A residential bill adds local distribution and tax on top.

Ontario's low wholesale price is misleading on its own: the province recovers most of its generation cost through the Global Adjustment, not the spot price, so the wholesale figure alone understates the true cost by a wide margin. A large load pays wholesale plus Global Adjustment plus transmission, well above the wholesale number but below a residential all-in rate, and a large Class A load can lower the Global Adjustment by shifting demand off the top five annual system peaks.

This market's band is free here; the ranked cross-market table with every market's precise midpoint is the Analyst Desk. See the ranked view.

Basis: Triangulated (built from several public data fragments cross-checked against each other, rather than one single measured figure). In US dollars per MWh delivered to a large high-load-factor load, excluding refundable taxes. Sources: Ontario wholesale price and Global Adjustment (IESO) · Regulated Price Plan price report (OEB).

Download the evidence pack (print-ready, free) →

Seller view: This delivered price is the level a competitive supply offer must beat, and the revenue ceiling a merchant plant works against here.
Connection wait for a large new load
36 to 60 months
Range 36 to 60 months (3 to 5 years). Mark: estimate.
Application & IESO system impact study 12mo · Transmitter connection impact assessment 12mo · Line upgrades & substation 12mo · Construction & energization 12mo
Our estimate of the total wait for a large new load. The source does not say exactly which milestones it measures from and to, so treat it as approximate. Partial or temporary supply can sometimes start earlier. A typical case, not a firm quote. · Source: Torys: connecting data centres in Ontario · Compare connection waits across markets →

Connection friction

How hard it is to connect a large new load here, and how long it takes. Part of the PowerGridIQ Connection Friction Feed. Labelled estimate; confidence Med.

Friction level

High

Typical connection wait

3 to 5 years

Source: Torys: connecting data centres in Ontario
Show evidence

This market's friction level, wait band and full story are free here. Every market's wait in months, ranked side by side, is the Analyst Desk.

A large load needs an IESO impact study plus a transmitter assessment, then a multi-year queue for upgrades.

Any load above 10 MW connecting to the IESO-controlled grid needs both an IESO System Impact Assessment and a transmitter Connection Impact Assessment, which alone can run more than 12 months, then a multi-year queue for line upgrades and new substations. Bill 40 (2025) creates a separate class for data centres and lets the province prioritise or condition their connections, so access is becoming managed rather than first-come.

What builds the 48-month wait

12
12
12
12
Application & IESO system impact study12 mo
Transmitter connection impact assessment12 mo
Line upgrades & substation12 mo
Construction & energization12 mo
Typical time to energization48 months
How the typical connection wait breaks down by stage. Stages overlap in practice and vary by project; the split is our estimate anchored to the operator process, and the total is the representative time to energization. Anchored to the operator process (Torys: connecting data centres in Ontario).

Data-centre share of demand pressure: Rising. Sources: Torys: connecting data centres in Ontario · Data centre regulation in Ontario (BLG). The full cross-market connection dataset is available through the Connection Friction Feed.

Download the evidence pack (print-ready, free) →

Seller view: Connection difficulty is both your own time-to-revenue and a barrier limiting competing supply from reaching this market.

The five pillars behind the tier

A
A
C
M
C
The pillar signature: Access, Availability, Cost, Momentum, Carbon, taller is stronger. The same shape repeats across every market so peers compare at a glance.
Access30%60

Managed access: Bill 40 (2025) lets the Minister prioritize large data-centre connections by economic benefit; approved projects proceed, new ones face selection.

Show evidence
Availability25%58

Tightening availability: nuclear-refurbishment outages and demand growth are narrowing the practical margin.

Cost25%75

Cost: wholesale energy is cheap (about $18/MWh), but the Global Adjustment (about $48/MWh) and delivery charges take the delivered cost to about $78/MWh, roughly 4 times the wholesale price.

Momentum15%58

Moderate momentum: a real and growing Toronto-area market.

Carbon5%88

Carbon: low, 65 gCO2e/kWh (national inventory, 2024), led by nuclear and hydro.

Default weights, which lean toward cost and access rather than carbon: Access 30 · Availability 25 · Cost 25 · Momentum 15 · Carbon 5. Momentum reflects the data-centre build already underway, not just stated intentions.

Download the evidence pack (print-ready, free) →

Seller view: Read these the other way: momentum is your customer pipeline, cost is your revenue ceiling, and access is how hard it is to build and sell here, not only to connect.

Reliability overlay

Reliability adjustment: the five-pillar score of 65 is reduced to 60, a deduction of 5 points, reflecting the delivery-reliability and firm-supply risks flagged below. Reliability is reported as five separate layers, never as one combined label, because they answer different questions and a strong answer on one does not cover a gap in another: what has actually failed on the bulk system, what a forward assessment expects of firm supply, how the local network performs, what your contract actually promises, and what your site is designed to ride through. Any one of them can cap the tier.
Show evidence

Historical bulk-system performance: No reliability flags found

Historical utility-territory delivery performance: Minor flags found

Distribution reliability (rural feeders, storm exposure) is moderate and not the binding concern here.

What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.

modelled

Forward resource adequacy (assessed): Tight

Large firm baseload leaving as demand climbs: Pickering Units 5-8 (about 2,000 MW) came out of service in September 2026 for refurbishment into the mid-2030s, and Unit 4 was permanently retired on 31 Dec 2024. IESO planning shows needs emerging as data-centre demand rises. Steps down if replacement firm capacity clears procurement.

What this means: A large new load should expect genuine exposure to forced power cuts (curtailment), price spikes, and delays in getting connected, and should design in backup power or firm supply contracts.

assessed · CNSC approves Pickering to end-2026 (NucNet) · Pickering-4 permanently shut (NucNet)

Contractual service terms: not assessed

We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.

Ask the utility for the tariff or service agreement terms before relying on firm supply.

Designed site resilience: not applicable at market level

Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.

Confidence: High. Each input is labelled as measured, modelled, or drawn from a specific event, and is framed as a risk to a prospective large new load, not as a verdict on any utility or grid operator. Forward adequacy is an assessment of what is expected, not a measurement of what has happened; it is a forecast and is labelled as one.

Download the evidence pack (print-ready, free) →

Seller view: Tight forward capacity (firm supply promised for future years) is scarcity that firm generation and storage get paid for; an adequacy flag is a demand signal for new supply, not only a risk to a load.

Supply relief outlook

Show evidence
Will the power crunch ease before your load energizes? This nets the demand racing for capacity against the new supply likely to arrive and the old supply leaving. A cross-side read, using the same data a seller sees the other way.
Tightening
Demand pressure
Moderate load growth competing for the same capacity.
Can new supply arrive
Ontario is procuring new firm supply and building transmission with First Nations equity partners; replacement capacity for the Pickering refurbishment is the near-term opening.
Supply leaving
Sep 2026: Pickering Units 5-8 came out of service for refurbishment; construction started 21 Sep 2026.
Future firm supply
Future firm supply: tight.

What this means: The supply picture looks likely to tighten; a new load should lock firm supply early and expect competition for capacity.

Download the evidence pack (print-ready, free) →

Regulatory momentum

Show evidence
The regulatory and permitting environment is increasingly the binding variable for a new large load.
Mixed↓ worsening

Why: Bill 40 lets the Minister prioritize and approve large data-centre connections by economic benefit, so access is becoming managed and selective rather than open.

What would change the read: A clear, open large-load connection pathway rather than case-by-case selection.

For new supply: Ontario is procuring new firm supply and building transmission with First Nations equity partners; replacement capacity for the Pickering refurbishment is the near-term opening.

Beyond the grid: Indigenous consultation is central to new transmission and is increasingly structured as equity partnership rather than a late-stage veto risk: Ontario directed Hydro One to build the Red Lake Transmission Line under a model giving proximate First Nations a 50 percent equity stake, and signed a memorandum of understanding with five First Nations on the Barrie-to-Sudbury line. Hydro One Global News

Download the evidence pack (print-ready, free) →

Grid conditions now

Structural baseline, June 2026Open the live map for Ontario →
Average demand
15,655 MW
Structural baseline, June 2026
Average system demand across the market, not the peak.
Wholesale price (modelled)
$18/MWh
Structural baseline, June 2026
US dollars. Energy only, and always modelled: no live price feed exists in any market. This is not the delivered cost.
Carbon intensity
65 g/kWh
Structural baseline, June 2026
Derived from the fuel mix. Never directly measured.
Renewable and nuclear
90%
Structural baseline, June 2026
The low-carbon share: generation from wind, solar, hydro, geothermal, biofuel and nuclear. Biofuel is counted as low-carbon, not zero-emission. The read for a carbon target.
Show all 10 fields
Renewable only
34%
Structural baseline, June 2026
Wind, solar, hydro, geothermal and biofuel. Excludes nuclear, which is low-carbon but not renewable, so this is the read for an RE100-style renewable procurement mandate.
Installed capacity
37,204 MW
Structural baseline, June 2026
Firm capacity
not held
Structural baseline, June 2026
De-rated, system-level.
System firm margin
not held
Structural baseline, June 2026
Market-wide estimate of de-rated firm capacity less peak demand. This is a directional screen, not local connectable capacity at any point of delivery.
Imports
185 MW
Structural baseline, June 2026
Modelled. No live interchange feed exists.
Exports
1,513 MW
Structural baseline, June 2026
Modelled. No live interchange feed exists.

Every field above carries its own source and freshness. Price, imports and exports are modelled in every market because no feed supplies them. Carbon intensity is derived from the fuel mix.

Outlook drivers

Show evidence

↑ Upgrade triggers

  • Refurbished nuclear units return and restore supply margin.
  • New supply procurement keeps pace with demand.

↓ Downgrade triggers

  • Refurbishment outages plus demand growth tighten supply further.
  • Bill 40 prioritization excludes merchant greenfield.

Download the evidence pack (print-ready, free) →

Scheduled to change

Show evidence
Dated, already-announced events that will affect a large load sited here, in date order. These are published facts with sources, not our forecasts, and they matter most when your energization date is years out.
Sep 2026
Pickering Units 5-8 came out of service for refurbishment; construction started 21 Sep 2026
Removed major firm baseload as demand climbs; the forward-capacity flag eases only when replacement firm capacity clears procurement.
Mid-2030s
Refurbished Pickering units targeted to return to service
Restores firm baseload supply; an upgrade trigger if it lands on schedule.

Download the evidence pack (print-ready, free) →

Key risks

Peer comparison

Trades like
Quebec (managed access, clean, cheap)
Ahead of
Alberta on openness
Behind
ERCOT on speed

Evidence behind this rating

The real-world events that test our Tier 2 call for Ontario: 2 challenge it. Each is dated and cited, so you can check the rating against what is actually happening on the ground.

Show evidence
IESO contracts a firm capacity import for this winter and raises its capacity auction targets CONTRACTED
Oct 2026AvailabilityMateriality: med

IESO notice of 1 Oct 2026. Citing facility maintenance requested from this winter through 2027 and 2028, the IESO secured a firm import for this winter from Alpha Generation, a past capacity auction participant, starting 1 Nov 2026, and raised its targets for the 2026/2027 capacity auction (summer 2027 and winter 2027/28), reopening pre-qualification to 9 Oct 2026. The notice does not name the facilities under maintenance or where the imported power comes from. CBC News reported on 17 Oct 2026 that the power comes from New York state, and that the IESO told it Ontario remains a net exporter of power. The IESO has not linked the contract to Pickering; that link is press inference.

Power to a buyer: Short-term cover only. The import is contracted for this winter only, from 1 Nov 2026, and it does not replace the Pickering B units, which stay out of service into the 2030s. The higher auction targets are a procurement step, not built supply.
Source: IESO ↗
Pickering B comes out of service for refurbishment; site construction starts, reactor work awaits a CNSC decision expected January 2027 BUILDING ▲ Challenges the rating
Sep 2026AvailabilityMateriality: high

The Ontario Ministry of Energy and Mines said on 21 Sep 2026 that site construction on the Pickering refurbishment had begun and that Units 5 to 8 (Pickering B) would be removed from service by the end of September 2026. Reactor refurbishment work waits on final approval from the Canadian Nuclear Safety Commission, which the province expects in January 2027. The province approved OPG's refurbishment plan in November 2025. The CNSC's station page now lists Units 5 to 8 as shut down.

Power to a buyer: Supply leaves now and returns late. Pickering B is out of service from the end of September 2026, and reactor work cannot start until the CNSC rules, expected January 2027. OPG's licence submission to the CNSC (15 May 2026) plans all four refurbished units back in service by the mid-2030s, so nothing from these units reaches a buyer before then.
Source: Ontario Newsroom ↗
Ontario Bill 40 introduces prioritized large data-centre connections ▲ Challenges the rating
2025AccessMateriality: med

The Act lets the Minister prioritize and approve large data-centre connections by economic benefit; approved projects proceed, new ones face selection.

Power to a buyer: not assessed. This entry was logged before we added this line.
Source: Torys ↗
Cited, dated developments tagged to the pillar they bear on, and whether they support or challenge the current tier. A material item flags the market for analyst review and may drive a rating action.

Dispute this rating. If you have evidence we’ve missed or misread, email hello@powergridiq.com. We log every dispute and reply within 10 business days.

Download the evidence pack (print-ready, free) →

🔔 Get alerts for Ontario
Get an email when this market's rating, outlook or a material development changes. Market alerts are part of the Analyst Desk.

Rating history

Oct 2026
AffirmedCost-pillar score 92 to 75: now set by one published rule from the band midpoint ($78/MWh), not by analyst judgement. The band itself is unchanged. PGIQ Rating 64 to 60. Tier 2 Strong unchanged.
Trigger: Cost-pillar scores set from delivered-cost bands by one published rule (cost-rescore-1.1), separate ratings release
Show evidence
Oct 2026
AffirmedTier 2 Strong affirmed; outlook Negative held. Pickering B is out of service for refurbishment, which was already in the supply-tightness read behind the negative outlook. The IESO's short-term firm import contract covers part of that gap for this winter only and does not change the forward picture: the outlook eases only when replacement firm capacity clears procurement.
Trigger: IESO short-term firm capacity import for winter 2026-27, 1 Oct 2026; Pickering B refurbishment construction start, 21 Sep 2026
June 2026
New ratingNew rating: Tier 2 Strong assigned.
Show evidence
🔒 The full time series behind Ontario, how its score, recurring cost, and interconnection queue (the line to connect to the grid) have moved month by month, is part of the Analyst Desk. The rating actions above are always free.
Every rating action is dated and explained, and the log is only ever added to, never edited. Reviews happen on a regular schedule and whenever a significant event occurs. "Affirmed" means we reviewed a development and the tier held; "Under review" means a significant item is being assessed and the rating could change.

Download the evidence pack (print-ready, free) →

What this would mean for a project

Show evidence

100 MW contracted demand, 95% load factor, HV servicecalculated

A load of this shape consumes 832,200 MWh a year. At the delivered band of $55 to $100/MWh that is $45,771,000 to $83,220,000 a year in recurring power.

Wholesale energy is 23% of the delivered cost here. The other $60/MWh is Global Adjustment, network and delivery, and other and regulatory charges. See the full build-up.

Typical connection wait is 3 to 5 years, at Med confidence.

Recurring charges only. Customer-funded connection, substation and network-upgrade capital is quoted per project by the network operator and is not in this figure. A load factor materially below 95% raises the delivered rate per MWh, because demand and network charges are levied per MW; screen your own load to see whether the band still applies.

Download the evidence pack (print-ready, free) →

Data provenance and freshness

Show evidence
What we hold for this market, field by field. Each grade is set by the evidence we actually hold for that pillar. A low grade means we looked and the evidence is thin; it is not a verdict on the market.
PillarEvidence gradeWhat that means
CostProject-ready (M3)Enough to price a project case
ConnectionBroad (M1)Directional: good for screening and monitoring
ReliabilityMarket-level (M2)Good for comparing markets, not for a site
CarbonMarket-level (M2)Good for comparing markets, not for a site
RegulatoryMarket-level (M2)Good for comparing markets, not for a site
Local capacityNot assessedWe hold no substation-level evidence
Good enough for: screening and monitoring and comparing markets. Not yet good enough for: a priced project case, a project case with a carbon requirement, or site-level diligence. The weakest field is connection.
Depth is not a rating strength, a confidence score or a feasibility conclusion. See the full coverage matrix. Version details: evidence-grade definitions v1.0.
How solid the data behind this rating is, on two separate axes plus recency. Source strength is how measured the numbers are, as opposed to triangulated or modelled. Coverage is how many of the decision-relevant data dimensions (reliability, connection, and cost) are compiled for this market. The two are kept apart because they answer different questions: a market can have strong sources on the little that is covered, or broad coverage that still leans on models. Neither grades the rating itself. The rating is a cited opinion, graded separately and falsifiably by the public track record and baseline measurement plan.

Source strength

Limited

None of the 3 data layers is directly measured; they are triangulated or modelled

Coverage

Full

3 of 3 dimensions: reliability, connection, cost

Last reviewed

June 2026

per-layer vintages below

Source strength is limited: none of the 3 data layers is directly measured; they are triangulated or modelled. Confidence in the rating (High) is a separate judgement about the opinion as a whole, set in review; source strength grades only how directly the numbers underneath were measured.

LayerMethodVintageFreshnessSource
PGIQ Rating opinionopinionJune 2026CurrentPGIQ methodology
Reliability reviewassessed2025FreshCNSC approves Pickering to end-2026 (NucNet)
Connection frictionproxy2025/26FreshTorys: connecting data centres in Ontario
Realized costtriangulated2026FreshOntario wholesale price and Global Adjustment (IESO)

Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.

Download the evidence pack (print-ready, free) →

What this market can and cannot answer yet

Show evidence
No market-level read closes a project case on its own, and saying only that would waste the evidence we do hold. Below is what is established, what is open, and what to do next.

What is established

  • Recurring cost band $55 to $100 per MWh, midpoint $78, basis triangulated, against the 100 MW archetype
  • Forward resource adequacy (assessed)

What is open

  • Historical utility-territory delivery performance (would change the answer)
  • Contractual service terms (would change the answer)
  • Designed site resilience
  • Substation-level capacity evidence

How service and connection are organized

Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.

Credible ranges today

  • Cost $55 to $100 per MWh, midpoint $78 (triangulated)

What could disqualify this market

  • Nuclear-refurbishment timeline.
  • Connection prioritization for new large loads.

Download the evidence pack (print-ready, free) →

Questions to put to the utility

Show evidence
These come from the gaps in our record for Ontario: the decision points we have not assessed. Put each one to the utility, network operator or regulator before relying on this market for a project. A gap is not evidence that the risk is absent; it means we have not assessed it.
  1. What is the measured outage record (SAIDI) for the network that would serve our site, as filed with the regulator, and for which years? Needed for a project case
    Why it is open: no regulator outage series compiled for this market yet.
  2. What firm capacity is available at the substation we would connect to, and when? Needed for a project case
    Why it is open: no operator publication of area or substation capacity found for this market.

The same list as JSON: /api/v1/markets/ontario/gaps

Download the evidence pack (print-ready, free) →

Score history

How Ontario's reliability-adjusted score and tier have moved, month by month. Part of your Analyst Desk.

Immutable monthly snapshots of the reliability-adjusted score, tier, outlook and recurring cost, oldest first. Dated when taken and never back-filled, so the series only compounds forward. Part of the Analyst Desk →

What next for Ontario?

Add to shortlistTrack it alongside your other candidates.Compare with peersRank markets against each other on your own weights.Open the Analyst DeskEvery market side by side, with history and alerts.Retrieve it through the APIThe same read as JSON, with provenance on every field.

Done with Ontario? Browse every market or see conditions across every region.

How does Ontario compare to every other market?

This page is our full read on Ontario alone, and it is free. To decide where a large load should actually go, you need every market side by side, ranked on recurring cost and time-to-connect, with the history and alerts when your shortlist moves. That is the Analyst Desk.

With your Analyst Desk, compare Ontario against every market side by side, ranked on recurring cost and time-to-connect, with the full history and shortlist alerts.

+ Add to your shortlist Recurring cost, ranked Connection friction, ranked Get the Analyst Desk →

Official carbon intensity

Since 28 Sep 2026 we serve Canada's national inventory figure for Ontario: 65 gCO2e/kWh (2024, generation basis, preliminary). Where a live feed is available, the carbon figure in the live conditions on this page can differ: we derive that one hourly from the current fuel mix, so it moves through the day. Carbon intensity does not feed the PGIQ Rating.

Boundary: operational combustion, CO2-equivalent, per kWh delivered to the grid. Main activity producers only. ECCC National Inventory Report, Annex 7 →