Southern Sweden (SE4) is the mirror image of the north: a power deficit that imports from Denmark, Germany and Poland at prices two to four times the northern zone, behind a limited north-south trunk grid.
See Sweden system conditions →$70 to $115 per MWh
Midpoint about $90 per MWh
Southern Sweden (SE4) is the country's priciest zone: it runs a deficit and imports from Denmark, Germany and Poland over a constrained north-south corridor, so a large load pays the Skane premium and tracks continental prices, well above the cheap northern hydro band.
This market's band is free here; the ranked cross-market table with every market's precise midpoint is the Analyst Desk. See the ranked view.
Basis: Modelled (estimated from a model and structural indicators where direct published figures are limited). In US dollars per MWh delivered to a large high-load-factor load, excluding refundable taxes. Sources: SE4 southern Sweden electricity prices (statsskuld) · Non-household electricity prices (Eurostat).
Moderate
This market's friction level, wait band and full story are free here. Every market's wait in months, ranked side by side, is the Analyst Desk.
Southern Sweden (SE4) leans on power imported from the north and the continent over constrained transmission, so connection and price conditions are materially tighter than the northern zones, though still better than core Western Europe.
Data-centre share of demand pressure: Moderate. Sources: Argus: Nordic data centres and power demand. The full cross-market connection dataset is available through the Connection Friction Feed.
Tighter access: a demand region dependent on imports and constrained north-south transfer.
Lower availability: SE4 runs a deficit and leans on interconnectors when the continent is short.
Pricier power: SE4 (Malmo) runs 2-4x the SE1 price, though still cheaper than continental peaks.
Lower momentum than the north; the hyperscale build sits up north.
Clean but slightly less so than the north, given fossil-tinged imports.
The load-heavy south depends on north-south transfer over a limited trunk grid and on imports from Denmark, Germany and Poland; constrained transfer can leave it exposed when the continent is short.
What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.
measured · Sweden north-south deficit and imports (Seoul Economic)
SE4 runs a structural deficit and imports at 2-4x the northern price; adequacy improves only as transmission and planned southern nuclear (2030s) arrive.
What this means: A large new load faces occasional exposure here. Monitor conditions and keep a contingency plan.
assessed
We have not compiled what firm service actually promises here: whether it is firm, non-firm or interruptible, the conditions under which you can be curtailed, the redundancy required of you, and the transfer time behind any N-1 commitment. Treat this as an open diligence item, not as an indication that service is firm.
Utility feeds, UPS, storage, on-site generation, islanding, black start and the residual energy you still expect to lose are properties of a specific site design, not of a market. This layer only exists once there is a site, and we never assert it for you.
What this means: Supply and demand look broadly balanced; the outcome hinges on the drivers below.
Every field above carries its own source and freshness. Price, imports and exports are modelled in every market because no feed supplies them. Carbon intensity is derived from the fuel mix.
Dispute this rating. If you have evidence we’ve missed or misread, email hello@powergridiq.com. We log every dispute and reply within 10 business days.
| Pillar | Evidence grade | What that means |
|---|---|---|
| Cost | Broad (M1) | Directional: good for screening and monitoring |
| Connection | Broad (M1) | Directional: good for screening and monitoring |
| Reliability | Market-level (M2) | Good for comparing markets, not for a site |
| Carbon | Market-level (M2) | Good for comparing markets, not for a site |
| Regulatory | Not assessed | We hold no evidence for this yet |
| Local capacity | Not assessed | We hold no substation-level evidence |
Limited
1 of 3 data layers directly measured; the rest are triangulated or modelled
Full
3 of 3 dimensions: reliability, connection, cost
June 2026
per-layer vintages below
Source strength is limited: 1 of 3 data layers directly measured; the rest are triangulated or modelled. Confidence in the rating (High) is a separate judgement about the opinion as a whole, set in review; source strength grades only how directly the numbers underneath were measured.
| Layer | Method | Vintage | Freshness | Source |
|---|---|---|---|---|
| PGIQ Rating opinion | opinion | June 2026 | Current | PGIQ methodology |
| Reliability review | measured | 2025 | Fresh | Sweden north-south deficit and imports (Seoul Economic) |
| Connection friction | proxy | 2025/26 | Fresh | Argus: Nordic data centres and power demand |
| Realized cost | modelled | 2026 | Fresh | SE4 southern Sweden electricity prices (statsskuld) |
Freshness reflects each layer's refresh cadence. Queue snapshots: weekly (ledger). Connection-wait bands: quarterly. Capacity-auction results: yearly. Reliability statistics: annual to every three years. Tariffs: every year or two. The full cross-market freshness dashboard is at /data-quality.
Not compiled for this market. Identify the serving operator before relying on any figure here, because a market-level read is an average over territories.
How the connection process is organised: the applicable service and connection entities depend on the candidate location and the power pathway. We have not compiled the structure for this market; that is a gap in our wayfinding, not a fact about the market.
The same list as JSON: /api/v1/markets/sweden-south/gaps
How Sweden South (Malmo, SE4)'s reliability-adjusted score and tier have moved, month by month. Part of your Analyst Desk.
Done with Sweden South (Malmo, SE4)? Browse every market or see conditions across every region.
This page is our full read on Sweden South (Malmo, SE4) alone, and it is free. To decide where a large load should actually go, you need every market side by side, ranked on recurring cost and time-to-connect, with the history and alerts when your shortlist moves. That is the Analyst Desk.
With your Analyst Desk, compare Sweden South (Malmo, SE4) against every market side by side, ranked on recurring cost and time-to-connect, with the full history and shortlist alerts.